New Launch - India Real Estate Report 2026.

DIAMOND OAK BLOCK-B

SRI HIMAGHNA CONSTRUCTIONS PRIVATE LIMITED

JUBILEEHILLS

RERA approved

Approved

25th Oct 2018

Project completed

Completed

25th Oct 2024

Registration No.

P02400000222

Project Type

Residential

Approving Authority

GHMC

District

Hyderabad

Taluka

Village/City/Town

State

Telangana

Project Details

Registration No.P02400000222
Certificate No.P02400000222
Project StatusCompleted
Project TypeResidential
Authority NameGHMC
Plan Approval No.1/C20/16857/2018
Proposed Completion2024-10-25
DistrictHyderabad
MandalVillage/City/Town
StreetNALLAGANDLA
LocalityJUBILEEHILLS
Pin Code500033
Last Modified2023-07-06

Land Details

Sy.No./TS No.127P, 79, 80, 87, 90, 91,92 &124
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)6185.31
Net Area (sqmts)5716.91
Total Building Units2
Approved Built-up Area12149.90
Mortgage Area1291.65
Boundaries EastSURVEY NO 124 AND 123 PART
Boundaries WestSURVEY NO 121
Boundaries NorthSURVEY NO 123 AND 40 WIDE ROAD
Boundaries SouthSURVEY NO 128

Parking

REBALA SAI PRITHVI RAMI REDDYAuthorized Signatory
REBALA KISHORE KUMAR REDDYDirector
SATTI SATYANARAYANA REDDYDirector
NITTALA JOHNSONDirector

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy