LAKSHMI S GRANDEUR WEST BLOCK
LAKSHMI INFRATECH INDIA PVT.LTD.
S.R.NAGAR
Approved
17th Nov 2017
Completed
17th Nov 2023
Registration No.
P02400000132
Project Type
Residential
Approving Authority
GHMC
District
Hyderabad
Taluka
Village/City/Town
State
Telangana
Project Details
| Registration No. | P02400000132 |
| Certificate No. | P02400000132 |
| Project Status | Completed |
| Project Type | Residential |
| Authority Name | GHMC |
| Plan Approval No. | 1/C11/10888/2017 |
| Proposed Completion | 2023-11-17 |
| District | Hyderabad |
| Mandal | Village/City/Town |
| Street | LANE OPP APARNA SAROVAR |
| Locality | S.R.NAGAR |
| Pin Code | 500038 |
| Last Modified | 2019-12-30 |
Land Details
| Sy.No./TS No. | 302 TO 310,320 TO 322,324 TO 361,363 TO 365,384,385,387 TO 391 AND 399 |
| Plot No./House No. | 105/D AND 105/C/4/PART(WESTERN PART) |
| Total Area (sqmts) | 517.32 |
| Net Area (sqmts) | 517.32 |
| Total Building Units | 1 |
| Approved Built-up Area | 1250.25 |
| Mortgage Area | 125.69 |
| Boundaries East | PLOT NO 105 C 4 PART EASTERN PART |
| Boundaries West | 9 MTRS WIDE ROAD |
| Boundaries North | PLOT NO 105 B HIG AND 105 A HIG |
| Boundaries South | 12 MTRS WIDE ROAD |
Parking
| LAKSHMI NARAYANA GUMMADI | Managing Director |
| NAGA SIRISHA GUMMADI | Authorized Signatory |
Construction Progress
| Sr.No. | Task/Activity | % Completed |
|---|---|---|
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 1 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 100 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in