New Launch - India Real Estate Report 2026.

PBEL CITY TOWER K - AQUAMARINE

INCOR APPA TWO PROJECTS PRIVATE LIMITED

MADHAPUR

RERA approved

Approved

4th Mar 2017

Project completed

Completed

5th Jan 2022

Registration No.

P02400000041

Project Type

Residential

Approving Authority

HMDA

District

Hyderabad

Taluka

Village/City/Town

State

Telangana

Project Details

Registration No.P02400000041
Certificate No.P02400000041
Project StatusCompleted
Project TypeResidential
Authority NameHMDA
Plan Approval No.4339/P4/PLG/H/2009
Proposed Completion2022-01-05
DistrictHyderabad
MandalVillage/City/Town
StreetPBEL CITY
LocalityMADHAPUR
Pin Code500033
Last Modified2023-02-11

Land Details

Sy.No./TS No.16,17,18,19/1,19/2,19/3,21,22,23,25/1,25/3,26,27/1,27/2,28,29,30,31,32,33,34,39,40,41,42,43
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)96820
Net Area (sqmts)96820.00
Total Building Units1
Approved Built-up Area26985.53
Mortgage Area2738.05
Boundaries EastPBEL CITY COMPANY LAND
Boundaries WestJNNURM HOUSING COLONY AND PEERANCHERU VILLAGE
Boundaries NorthPBEL CITY COMPANY LAND AND PEERANCHERU VILLAGE
Boundaries SouthPBEL CITY COMPANY LAND AND LAND OF INCOR APPA PROJ

Parking

Covered Parking ( In Numbers)214

Amenities

FacilityAvailable% CompletedStatus
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES80Will be closed with tower completion
Water Supply :YES100Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES100Will be closed with tower completion
Storm Water Drains :YES92Will be closed with tower completion
Green Strip/TOT LOT/Park :YES80Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES100Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES60Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES100Will be closed with tower completion
Energy management :YES100
Fire Protection And Fire Safety Requirements :YES100Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES100Will be closed with tower completion
Aggregate area of recreational Open Space :YES100Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES20Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES80Will be closed with tower completion
Water Supply :YES100Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES100Will be closed with tower completion
Storm Water Drains :YES92Will be closed with tower completion
Green Strip/TOT LOT/Park :YES80Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES55Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES100Will be closed with tower completion
Solid Waste Management And Disposal :YES60Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES100Will be closed with tower completion
Energy management :YES100
Fire Protection And Fire Safety Requirements :YES100Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES100Will be closed with tower completion
Aggregate area of recreational Open Space :YES100Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion
Green Strip/TOT LOT/Park :YES0Will be closed with tower completion
Street Lighting :YES0Will be closed with tower completion
Community Buildings :YES50Will be closed with overall project ompletion
Treatment And Disposal Of Sewage And Sullage Water :YES0Will be closed with tower completion
Solid Waste Management And Disposal :YES0Will be closed with tower completion
Water Conservation, Rain water Harvesting :YES0Will be closed with tower completion
Energy management :NO0NA
Fire Protection And Fire Safety Requirements :YES0Will be closed with tower completion
Electrical Meter Room, Sub-Station, Receiving Station :YES0Will be closed with tower completion
Aggregate area of recreational Open Space :YES0Will be closed with tower completion
Internal Roads & Footpaths :YES0Will be closed with tower completion
Water Supply :YES0Will be closed with tower completion
Sewerage (Chamber, Lines, Septic Tank , STP) :YES0Will be closed with tower completion
Storm Water Drains :YES0Will be closed with tower completion

Unit Details

Sr.No.FloorMortgageApartment TypeSaleable Area (sqm)No. of ApartmentsNo. Booked
11True2BHK136.2010
21True3BHK166.7610
31True3BHK167.2310
41True3BHK145.6720
51True3BHK152.1820
61True2BHK129.3210
71True2BHK112.2310
810False3BHK152.1822
910False2BHK129.3211
1010False2BHK118.0811
1110False2BHK142.9811
1210False3BHK166.7611
1310False3BHK167.2311
1410False3BHK149.2011
1510False3BHK154.1310
1610False2BHK128.3910
1711False3BHK150.0410
1811False2BHK129.6910
1911False3BHK154.7810
2011False3BHK152.1822
2111False2BHK129.3211
2211False2BHK119.1011
2311False2BHK145.1110
2411False3BHK166.7611
2511False3BHJ167.2311
2612False3BHK152.1822
2712False2BHK129.3211
2812False2BHK112.2311
2912False3BHK167.2311
3012False2BHK120.2211
3112False2BHK132.8511
3212False3BHK166.7611
3312False3BHK145.6721
3413False3BHK152.1811
3513False2BHK140.0011
3613False2BHK112.2311
3713False2BHK132.8510
3813False3BHK183.8611
3913False3BHK183.7611
4013False3BHK154.5010
4113False2BHK120.2211
4213False3BHK150.7810
4313False3BHK160.8211
4414False3BHK152.1811
4514False2BHK137.6811
4614False2BHK112.2311
4714False2BHK132.8510
4814False3BHK181.0722
4914False3BHK153.1010
5014False3BHK149.2010
5114False3BHK159.1410
5214False2BHK120.2211
5315False3BHK152.1811
5415False2BHK140.0011
5515False2BHK112.2311
5615False2BHK132.8511
5715False3BHK183.8611
5815False3BHK183.7611
5915False3BHK154.5010
6015False2BHK120.2211
6115False3BHK150.7810
6215False3BHK160.8210
6316False3BHK152.1821
6416False2BHK129.3211
6516False2BHK112.2311
6616False2BHK132.8511
6716False3BHK166.7611
6816False3BHK167.2311
6916False3BHK145.6720
7016False2BHK120.2211
7117False3BHK152.1821
7217False2BHK129.3211
7317False2BHK119.1011
7417False2BHK145.1110
7517False3BHK166.7610
7617False3BHK167.2311
7717False3BHK150.0410
7817False2BHK129.6910
7917False3BHK154.7810
8018False2BHK129.3211
8118False2BHK118.0811
8218False3BHK166.7610
8318False3BHK149.2010
8418False2BHK128.3910
8518False2BHK142.9811
8618False3BHK167.2311
8718False3BHK152.1822
8818False3BHK154.1310
8919False3BHK152.1821
9019False2BHK129.3211
9119False2BHK119.1011
9219False2BHK145.1110
9319False3BHK166.7611
9419False3BHK167.2311
9519False3BHK150.0410
9619False2BHK129.6910
9719False3BHK154.7810
982True3BHK152.1820
992True2BHK129.3210
1002True2BHK118.0810
1012True2BHK142.9810
1022True3BHK166.7610
1032True3BHK167.2310
1042True3BHK145.6720
10520False3BHK152.1820
10620False2BHK129.3210
10720False2BHK112.2311
10820False2BHK132.8510
10920False3BHK166.7610
11020False3BHK167.2310
11120False3BHK145.6720
11220False2BHK120.2210
1133False2BHK119.1011
1143False2BHK145.1110
1153False3BHK166.7610
1163False3BHK167.2311
1173False2BHK120.2211
1183False3BHK152.1822
1193False2BHK129.3211
1203False3BHK145.6721
1214False3BHK152.1822
1224False2BHK129.3211
1234False2BHK112.2311
1244False3BHK166.7610
1254False3BHK167.2311
1264False2BHK120.2211
1274False2BHK132.8511
1284False3BHK145.6722
1295False2BHK140.0011
1305False2BHK112.2311
1315False2BHK132.8510
1325False3BHK183.8611
1335False3BHK183.7611
1345False3BHK154.5011
1355False2BHK120.2211
1365False3BHK160.8210
1375False3BHK152.1811
1385False3BHK150.7811
1396False3BHK152.1811
1406False2BHK137.6811
1416False2BHK112.2311
1426False3BHK181.0722
1436False3BHK153.1011
1446False2BHK120.2211
1456False3BHK149.2011
1466False3BHK159.1410
1476False2BHK132.8511
1487False3BHK152.1811
1497False2BHK112.2311
1507False2BHK132.8511
1517False3BHK183.611
1527False3BHK183.7611
1537False3BHK154.5010
1547False2BHK120.2211
1557False3BHK160.8210
1567False2BHK140.0011
1577False3BHK150.7811
1588False2BHK129.3211
1598False2BHK112.2311
1608False3BHK166.7611
1618False3BHK167.2311
1628False2BHK120.2211
1638False2BHK132.8511
1648False3BHK145.6722
1658False3BHK152.1822
1669False3BHK152.1821
1679False2BHK129.3211
1689False2BHK119.1011
1699False2BHK145.1111
1709False3BHK166.7611
1719False3BHK167.2311
1729False3BHK150.0410
1739False2BHK129.6910
1749False3BHK154.7810

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums88
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises94
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate96

Professionals

NameCertificate No.Role
Larsen and Toubro LimitedNAContractor
EDIFICE Consultants Pvt LtdNAArchitect
Sterling Engineering Consultancy Services Pvt LtdNAStructural Engineer
RALYS CONSULTING ENGINEERSNAOther
N. K. REALTORS PRIVATE LIMITEDA02500000051Real Estate Agent
360 REALTORS LLPA02500000113Real Estate Agent
PROPTIGER MARKETING SERVICES PRIVATE LIMITEDA02400000123Real Estate Agent

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy