New Launch - India Real Estate Report 2026.

RAMI REDDY TOWERS

ANUHAR HOMES PRIVATE LIMITED

YELLAREDDYGUDA

RERA approved

Approved

14th Nov 2018

Project completed

Completed

6th Nov 2024

Registration No.

P02400000820

Project Type

Mixed Development (Residential & Commercial)

Approving Authority

HMDA

District

Hyderabad

Taluka

Village/City/Town

State

Telangana

Project Details

Registration No.P02400000820
Certificate No.P02400000820
Project StatusCompleted
Project TypeMixed Development (Residential & Commercial)
Authority NameHMDA
Plan Approval No.Project Name
Proposed Completion2024-11-06
DistrictHyderabad
MandalVillage/City/Town
StreetPUPPALGUDA
LocalityYELLAREDDYGUDA
Pin Code500073
Last Modified2025-07-24

Land Details

Sy.No./TS No.176 232 233 AND 234 SECTOR III BLOCK C
Plot No./House No.C 3/A C3/B C3/C C3/D C3/E C3/F
Total Area (sqmts)17516.88
Net Area (sqmts)16480.45
Total Building Units5
Approved Built-up Area64791.23
Mortgage Area5827.24
Boundaries EastROAD WIDTH 30
Boundaries WestCTS NO
Boundaries NorthROAD WIDTH 30
Boundaries SouthROAD WIDTH 30

Parking

HARSHA VARDHANA REDDY YERRAPUREDDYManaging Director
HARSHA VARDHANA REDDY YERRAPUREDDY_1Authorized Signatory
ANUPAMA DEVI SADHUDirector

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth0
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80
1Excavation100
2X number of Basement(s) and Plinth0
3X number of Podiums60
4Stilt Floor0
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor0
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor0
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor0
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Hyderabad

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy