A PROJECT BY RAVIRAJ INFRA
RAVI RAJ INFRA DEVELOPERS
UPPAL
Approved
8th Feb 2025
Pending
7th Feb 2030
Registration No.
P01100009385
Project Type
Residential
Approving Authority
HMDA
District
Medchal-Malkajgiri
Taluka
Uppal
State
Telangana
Project Details
| Registration No. | P01100009385 |
| Certificate No. | P01100009385 |
| Project Status | New Project |
| Project Type | Residential |
| Authority Name | HMDA |
| Plan Approval No. | 010164/BP/HMDA/2221/SKP/2023 |
| Proposed Completion | 2030-02-07 |
| District | Medchal-Malkajgiri |
| Mandal | Uppal |
| Street | 100 FEET ROAD |
| Locality | UPPAL |
| Pin Code | 500039 |
| Last Modified | 2025-03-13 |
Land Details
| Sy.No./TS No. | 33/3 |
| Plot No./House No. | Total Area(In sqmts) |
| Total Area (sqmts) | 4374.67 |
| Net Area (sqmts) | 3764.64 |
| Total Building Units | 1 |
| Approved Built-up Area | 31644.10 |
| Boundaries East | AGRI LAND IN PART OF SURVEY NO 32 35 |
| Boundaries West | PROPOSED 100 FEET ROAD |
| Boundaries North | AGRI LAND IN PART OF SURVEY NO 33 |
| Boundaries South | AGRI LAND IN SURVEY NO 33 |
Parking
| SALLA RAVINDER REDDY | Authorized Signatory |
| SALLA YADAMMA REDDY | Partner |
Construction Progress
| Sr.No. | Task/Activity | % Completed |
|---|---|---|
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 0 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 0 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 0 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 0 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 0 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 0 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 0 |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | 10 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in