New Launch - India Real Estate Report 2026.

TIRUMALA HILLS - NEELADRI and GARUDADRI

ABHI CONSTRUCTIONS

PRAGATHI NAGAR

RERA approved

Approved

18th Nov 2019

Project completed

Completed

30th Dec 2020

Registration No.

P02200001923

Project Type

Residential

Approving Authority

HMDA

District

Medchal-Malkajgiri

Taluka

Bachupally

State

Telangana

Project Details

Registration No.P02200001923
Certificate No.P02200001923
Project StatusCompleted
Project TypeResidential
Authority NameHMDA
Plan Approval No.018888/MED/R1/U6/HMD
Proposed Completion2020-12-30
DistrictMedchal-Malkajgiri
MandalBachupally
StreetMAIN ROAD
LocalityPRAGATHI NAGAR
Pin Code500090
Last Modified2024-02-15

Land Details

Sy.No./TS No.155/P,162,163,164,165/P
Plot No./House No.1-18
Total Area (sqmts)4005.17
Net Area (sqmts)4005.17
Total Building Units2
Approved Built-up Area8434.53
Mortgage Area1145.03
Boundaries East100 FEET WIDE ROAD
Boundaries West30 FEET WIDE ROAD
Boundaries North30 FEET WIDE ROAD
Boundaries South30 FEET WIDE ROAD

Parking

SRINIVASA REDDY DONDETIPartner
CHANDRA LATHA DONDETIPartner
SRINIVASA REDDY DONDETI_1Authorized Signatory

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth0
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100
1Excavation100
2X number of Basement(s) and Plinth0
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy