VAIBHAVIS VIHAAN SHIKHARA

VAIBHAVI INFRAA PROJECTS

KUKATPALLY

RERA approved

Approved

29th Sept 2023

Completion pending

Pending

28th Sept 2028

Registration No.

P01100007446

Project Type

Residential

Approving Authority

HMDA

District

Medchal-Malkajgiri

Taluka

Village/City/Town

State

Telangana

Project Details

Registration No.P01100007446
Certificate No.P01100007446
Project StatusNew Project
Project TypeResidential
Authority NameHMDA
Plan Approval No.Project Name
Proposed Completion2028-09-28
DistrictMedchal-Malkajgiri
MandalVillage/City/Town
StreetMANMOLE
LocalityKUKATPALLY
Pin Code500072
Last Modified2023-12-07

Land Details

Sy.No./TS No.477/P
Plot No./House No.1,2,3,4,5,6,7,8,9 AND 10
Total Area (sqmts)9404.65
Net Area (sqmts)9404.65
Total Building Units3
Approved Built-up Area39862.91
Boundaries EastNAIGHBOURS LAND
Boundaries West12 METER ROAD
Boundaries North12 METER ROAD
Boundaries South15 METER ROAD

Parking

PRAHALAD TAYIPartner
VEDAMBARI TAYIPartner
PRAHALAD TAYI_1Authorized Signatory

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation25
2X number of Basement(s) and Plinth00
3X number of Podiums00
4Stilt Floor00
5X number of Slabs of Super Structure00
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises000
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises00
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.00
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing00
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate00
11Overall Percentage of Completion of the work done For the entire Building /Wing2.5
1Excavation25
2X number of Basement(s) and Plinth00
3X number of Podiums00
4Stilt Floor00
5X number of Slabs of Super Structure00
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises00
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises00
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.00
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing00
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate00
11Overall Percentage of Completion of the work done For the entire Building /Wing2.5
1Excavation25
2X number of Basement(s) and Plinth000
3X number of Podiums00
4Stilt Floor00
5X number of Slabs of Super Structure00
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises00
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises00
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.00
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing00
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate00
11Overall Percentage of Completion of the work done For the entire Building /Wing2.5

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy