New Launch - India Real Estate Report 2026.

Vazhraa Prathik

Vazhraa Nirmaan Private Limited

Kukatpally

RERA approved

Approved

NaNth Invalid Date NaN

Project completed

Completed

30th Jun 2022

Registration No.

P02200000317

Project Type

Residential

Approving Authority

HMDA

District

Medchal-Malkajgiri

Taluka

Kukatpally

State

Telangana

Project Details

Registration No.P02200000317
Certificate No.P02200000317
Project StatusCompleted
Project TypeResidential
Authority NameHMDA
Plan Approval No.Project Name
Proposed Completion2022-06-30
DistrictMedchal-Malkajgiri
MandalKukatpally
StreetMadhura Nagar
LocalityKukatpally
Pin Code500072
Last Modified2026-04-17

Land Details

Sy.No./TS No.150,151,152,153,154,155,157,159,170,171
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)17551.12
Net Area (sqmts)16120.59
Total Building Units4
Approved Built-up Area55518.91
Mortgage Area5612.51
Boundaries EastExisting Building
Boundaries WestOpen Land
Boundaries NorthOpen Land
Boundaries SouthRoad Width -30M

Parking

Mikkilineni Srinivasa RaoManaging Director
Mikkilineni SudhaDirector
Mandava Naga Venkateswara RaoDirector
Ammula Viswa MurthyDirector
Mikkilineni Srinivasa Rao_1Authorized Signatory
MANDAVA KRISHNA CHAITANYADirector
BOPPANA PARAMESWARA RAOManaging Director

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums0
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises85
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing85
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate85

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy