City Square Block A
SRI RAKSHA CONSTRUCTIONS
Chevella Road
Approved
3rd Jun 2024
Pending
3rd Jun 2027
Registration No.
P02100008578
Project Type
Residential
Approving Authority
DTCP
District
Ranga Reddy
Taluka
Gandipet
State
Telangana
Project Details
| Registration No. | P02100008578 |
| Certificate No. | P02100008578 |
| Project Status | New Project |
| Project Type | Residential |
| Authority Name | DTCP |
| Plan Approval No. | Project Name |
| Proposed Completion | 2027-06-03 |
| District | Ranga Reddy |
| Mandal | Gandipet |
| Street | Ward No.4, Block No.1, Near Byle Bazar |
| Locality | Chevella Road |
| Pin Code | 500091 |
| Last Modified | 2024-07-22 |
Land Details
| Sy.No./TS No. | 16/3 |
| Plot No./House No. | Ward No 4, Block no 1 |
| Total Area (sqmts) | 2124.39 |
| Net Area (sqmts) | 1553.47 |
| Total Building Units | 1 |
| Approved Built-up Area | 4391.71 |
| Boundaries East | Land in Sy no 16 of M Jana bai and M Srinivas |
| Boundaries West | Land in Sy No 15 |
| Boundaries North | Proposed 60 - Wide Master Plan Road |
| Boundaries South | Proposed 33 -Wide Master Plan Road |
Parking
| City Square Block A | M Manikya Prabhu |
Amenities
| Facility | Available | % Completed | Status |
|---|---|---|---|
| Open Parking (In sqmts) | 0 | 0 | 0 |
| Covered Parking ( In Numbers) | 0 | 0 | 0 |
Unit Details
| Sr.No. | Floor | Mortgage | Apartment Type | Saleable Area (sqm) | No. of Apartments | No. Booked |
|---|---|---|---|---|---|---|
| 1 | 1 | False | Triple Bedroom 105 | 144.75 | 1 | 0 |
| 2 | 1 | False | Double Bedroom 106 | 111.32 | 1 | 0 |
| 3 | 1 | False | Double Bedroom 107 | 111.32 | 1 | 0 |
| 4 | 1 | False | Double Bedroom 101 | 110.96 | 1 | 0 |
| 5 | 1 | False | Double bedroom 102 | 110.42 | 1 | 0 |
| 6 | 1 | False | Triple Bedroom 103 | 145.11 | 1 | 0 |
| 7 | 1 | False | Triple Bedroom 104 | 144.48 | 1 | 0 |
| 8 | 2 | False | Double Bedroom 201 | 110.96 | 1 | 0 |
| 9 | 2 | False | Double Bedroom 202 | 110.42 | 1 | 0 |
| 10 | 2 | False | Triple Bedroom 203 | 145.11 | 1 | 0 |
| 11 | 2 | False | Triple Bedroom 204 | 144.48 | 1 | 0 |
| 12 | 2 | False | Triple Bedroom 205 | 144.75 | 1 | 0 |
| 13 | 2 | False | Double Bedroom 206 | 111.32 | 1 | 0 |
| 14 | 2 | False | Double Bedroom 207 | 111.32 | 1 | 0 |
| 15 | 3 | False | Double Bedroom 301 | 110.96 | 1 | 0 |
| 16 | 3 | False | Double Bedroom 302 | 110.42 | 1 | 0 |
| 17 | 3 | False | Triple Bedroom 303 | 145.11 | 1 | 0 |
| 18 | 3 | False | Triple Bedroom 304 | 144.48 | 1 | 0 |
| 19 | 3 | False | Triple Bedroom 305 | 144.75 | 1 | 0 |
| 20 | 3 | False | Double Bedroom 306 | 111.32 | 1 | 0 |
| 21 | 3 | False | Double Bedroom 307 | 111.32 | 1 | 0 |
| 22 | 4 | False | Double Bedroom 401 | 110.96 | 1 | 0 |
| 23 | 4 | False | Double Bedroom 402 | 110.42 | 1 | 0 |
| 24 | 4 | False | Triple Bedroom 403 | 145.11 | 1 | 0 |
| 25 | 4 | False | Triple Bedroom 404 | 144.48 | 1 | 0 |
| 26 | 4 | False | Triple Bedroom 405 | 144.75 | 1 | 0 |
| 27 | 4 | False | Double Bedroom 406 | 111.32 | 1 | 0 |
| 28 | 4 | False | Double Bedroom 407 | 111.32 | 1 | 0 |
| 29 | 5 | True | Double Bedroom 501 | 110.96 | 1 | 0 |
| 30 | 5 | True | Double Bedroom 502 | 110.42 | 1 | 0 |
| 31 | 5 | True | Triple bedroom 503 | 145.11 | 1 | 0 |
| 32 | 5 | False | Triple Bedroom 504 | 144.48 | 1 | 0 |
| 33 | 5 | False | Triple Bedroom 505 | 144.75 | 1 | 0 |
| 34 | 5 | True | Double Bedroom 506 | 111.32 | 1 | 0 |
| 35 | 5 | True | Double Bedroom 507 | 111.32 | 1 | 0 |
Professionals
| Name | Certificate No. | Role |
|---|---|---|
| 1 | Excavation | 0 |
| 2 | X number of Basement(s) and Plinth | 0 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 0 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 0 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 0 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 0 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 0 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 0 |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | 0 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Hyderabad


Ask Pulse Ai anything about real estate





