CSR MITHILA
ARENU CONSTRUCTIONS LLP
WHITEFIELDS
Approved
21st Aug 2023
Pending
21st Aug 2029
Registration No.
P02200009044
Project Type
Residential
Approving Authority
HMDA
District
Ranga Reddy
Taluka
Village/City/Town
State
Telangana
Project Details
| Registration No. | P02200009044 |
| Certificate No. | P02200009044 |
| Project Status | New Project |
| Project Type | Residential |
| Authority Name | HMDA |
| Plan Approval No. | Project Name |
| Proposed Completion | 2029-08-21 |
| District | Ranga Reddy |
| Mandal | Village/City/Town |
| Street | Korremula |
| Locality | WHITEFIELDS |
| Pin Code | 500084 |
| Last Modified | 2024-11-13 |
Land Details
| Sy.No./TS No. | 748/A |
| Plot No./House No. | Total Area(In sqmts) |
| Total Area (sqmts) | 2225.30 |
| Net Area (sqmts) | 2225.30 |
| Total Building Units | 1 |
| Approved Built-up Area | 4127.69 |
| Boundaries East | 735 |
| Boundaries West | 50 WIDE ROAD |
| Boundaries North | 748 A |
| Boundaries South | SIDDARTHA COLLEGE |
Parking
| CSR MITHILA | MADADI MAHESH |
Amenities
| Facility | Available | % Completed | Status |
|---|---|---|---|
| Open Parking (In sqmts) | 0 | 0 | 0 |
| Covered Parking ( In Numbers) | 0 | 0 | 0 |
Unit Details
| Sr.No. | Floor | Mortgage | Apartment Type | Saleable Area (sqm) | No. of Apartments | No. Booked |
|---|---|---|---|---|---|---|
| 1 | 1 | False | Double Bedroom 105 | 105.53 | 1 | 0 |
| 2 | 1 | False | Triple Bedroom 106 | 110.64 | 1 | 0 |
| 3 | 1 | False | Triple Bedroom 107 | 143.83 | 1 | 0 |
| 4 | 1 | False | Triple Bedroom 101 | 143.83 | 1 | 0 |
| 5 | 1 | False | Triple Bedroom 102 | 110.64 | 1 | 0 |
| 6 | 1 | False | Double Bedroom 103 | 105.53 | 1 | 0 |
| 7 | 1 | False | Double Bedroom 104 | 105.53 | 1 | 0 |
| 8 | 2 | True | Triple Bedroom 201 | 143.83 | 1 | 0 |
| 9 | 2 | True | Triple Bedroom 202 | 110.64 | 1 | 0 |
| 10 | 2 | True | Double Bedroom 203 | 105.53 | 1 | 0 |
| 11 | 2 | True | Double Bedroom 204 | 105.53 | 1 | 0 |
| 12 | 2 | True | Double Bedroom 205 | 105.53 | 1 | 0 |
| 13 | 2 | True | Triple Bedroom 206 | 110.64 | 1 | 0 |
| 14 | 2 | True | Triple Bedroom 207 | 143.83 | 1 | 0 |
| 15 | 3 | False | Triple Bedroom 301 | 143.83 | 1 | 0 |
| 16 | 3 | False | Triple Bedroom 302 | 110.64 | 1 | 0 |
| 17 | 3 | False | Double Bedroom 303 | 105.53 | 1 | 0 |
| 18 | 3 | False | Double Bedroom 304 | 105.53 | 1 | 0 |
| 19 | 3 | False | Double Bedroom 305 | 105.53 | 1 | 0 |
| 20 | 3 | False | Triple Bedroom 306 | 110.64 | 1 | 0 |
| 21 | 3 | False | Triple Bedroom 307 | 143.83 | 1 | 0 |
| 22 | 4 | False | Triple Bedroom 401 | 143.83 | 1 | 0 |
| 23 | 4 | False | Triple Bedroom 402 | 110.64 | 1 | 0 |
| 24 | 4 | False | Double Bedroom 403 | 105.53 | 1 | 0 |
| 25 | 4 | False | Double Bedroom 404 | 105.53 | 1 | 0 |
| 26 | 4 | False | Double Bedroom 405 | 105.53 | 1 | 0 |
| 27 | 4 | False | Triple Bedroom 406 | 110.64 | 1 | 0 |
| 28 | 4 | False | Triple Bedroom 407 | 143.83 | 1 | 0 |
| 29 | 5 | False | Triple Bedroom 501 | 143.83 | 1 | 0 |
| 30 | 5 | False | Triple Bedroom 502 | 110.64 | 1 | 0 |
| 31 | 5 | False | Double Bedroom 503 | 105.53 | 1 | 0 |
| 32 | 5 | False | Double Bedroom 504 | 105.53 | 1 | 0 |
| 33 | 5 | False | Double Bedroom 505 | 105.53 | 1 | 0 |
| 34 | 5 | False | Triple Bedroom 506 | 110.64 | 1 | 0 |
| 35 | 5 | False | Triple Bedroom 507 | 143.83 | 1 | 0 |
Professionals
| Name | Certificate No. | Role |
|---|---|---|
| 1 | Excavation | 0 |
| 2 | X number of Basement(s) and Plinth | 0 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 0 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 0 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 0 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 0 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 0 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 0 |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | 0 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Hyderabad


Ask Pulse Ai anything about real estate





