HALLMARK SILVANUS

HALLMARK BUILDERS

NEKNAMPOOR

RERA approved

Approved

NaNth Invalid Date NaN

Project completed

Completed

31st Jul 2019

Registration No.

P02400000253

Project Type

Residential

Approving Authority

HMDA

District

Ranga Reddy

Taluka

Gandipet

State

Telangana

Project Details

Registration No.P02400000253
Certificate No.P02400000253
Project StatusCompleted
Project TypeResidential
Authority NameHMDA
Plan Approval No.000211/SKP/R1/U2/HMDA/29082016
Proposed Completion2019-07-31
DistrictRanga Reddy
MandalGandipet
StreetALAKAPOOR TOWNSHIP
LocalityNEKNAMPOOR
Pin Code500089
Last Modified2022-02-02

Land Details

Sy.No./TS No.Sy No.69,69/a,72,75&76
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)13736.18
Net Area (sqmts)13736.18
Total Building Units5
Approved Built-up Area36683.1
Mortgage Area3401.65
Boundaries EastSurvey No 69 part
Boundaries West40 feet wide road
Boundaries NorthSurvey No 72 and 73
Boundaries South30 feet wide road

Parking

ASOKA VARDHAN KANDULAAuthorized Signatory
SRINIVASA REDDY ALLUAuthorized Signatory
SIVASANKAR REDDY MAYALURIPartner
JAIPAL REDDY BANDIPartner

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate80

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Hyderabad

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy