RAMKY ONE ODYSSEY

RAMKY ESTATES AND FARMS LTD

P JANARDHAN REDDY NAGAR

RERA approved

Approved

14th Dec 2021

Completion pending

Pending

14th Dec 2027

Registration No.

P02400003991

Project Type

Residential

Approving Authority

HMDA

District

Ranga Reddy

Taluka

Serilingampally

State

Telangana

Project Details

Registration No.P02400003991
Certificate No.P02400003991
Project StatusNew Project
Project TypeResidential
Authority NameHMDA
Plan Approval No.Project Name
Proposed Completion2027-12-14
DistrictRanga Reddy
MandalSerilingampally
StreetNarsingi
LocalityP JANARDHAN REDDY NAGAR
Pin Code500032
Last Modified2026-01-05

Land Details

Sy.No./TS No.176/P & 179/P
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)24280.95
Net Area (sqmts)21456.21
Total Building Units4
Approved Built-up Area155451.77
Mortgage Area16243.07
Boundaries East12M Wide Road
Boundaries West12
Boundaries North36M Wide road
Boundaries SouthNeighbours land

Parking

NANDA KISHORE MUDUMBAIManaging Director
SHARAN ALLAAuthorized Signatory

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums100
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy