VAISHNAVI PRIDE
ANIL CONSTRUCTIONS GROUP
HASTHINAPURAM
Approved
21st Sept 2023
Completed
31st Mar 2026
Registration No.
P02400007096
Project Type
Residential
Approving Authority
HMDA
District
Ranga Reddy
Taluka
Saroornagar
State
Telangana
Project Details
| Registration No. | P02400007096 |
| Certificate No. | P02400007096 |
| Project Status | Completed |
| Project Type | Residential |
| Authority Name | HMDA |
| Plan Approval No. | Project Name |
| Proposed Completion | 2026-03-31 |
| District | Ranga Reddy |
| Mandal | Saroornagar |
| Street | NEAR VISVESWARAIAH ENGINEERING COLLEGE |
| Locality | HASTHINAPURAM |
| Pin Code | 500079 |
| Last Modified | 2023-10-05 |
Land Details
| Sy.No./TS No. | 91 A,B 92 A,B 93 A,B |
| Plot No./House No. | Total Area(In sqmts) |
| Total Area (sqmts) | 6575.92 |
| Net Area (sqmts) | 6575.92 |
| Total Building Units | 1 |
| Approved Built-up Area | 15417.16 |
| Boundaries East | OTHERS LAND |
| Boundaries West | 66 WIDE ROAD |
| Boundaries North | VISVESWARAIAH COLLEGE OF ENGINEERING OF TECHNOLOGY |
| Boundaries South | 30 WIDE ROAD |
Parking
| VAISHNAVI PRIDE | K LAXMI NARAYANA |
| VAISHNAVI PRIDE_1 | SRI BANDAMEEDIPALLY RAMULU |
| VAISHNAVI PRIDE_2 | SRI PILLI JANARDHAN REDDY |
| VAISHNAVI PRIDE_3 | SRI POLIKEPAHAD PRAVEEN KUMAR |
| VAISHNAVI PRIDE_4 | SMT PERUMALLA SHAMALA |
| VAISHNAVI PRIDE_5 | SRI AGARAMA SREEDHAR REDDY |
| VAISHNAVI PRIDE_6 | SRI KALWA KANNAIAH SETTY |
| VAISHNAVI PRIDE_7 | SRI BALESHWAR BANDIGI |
| VAISHNAVI PRIDE_8 | SRI BHASKAR GURRAMPALLY |
| VAISHNAVI PRIDE_9 | SRI BUYYANI NARASIMHA REDDY |
| VAISHNAVI PRIDE_10 | DR KARANAM SAMPATH KUMAR |
| VAISHNAVI PRIDE_11 | SRI KASOJU SUDHAKER |
| VAISHNAVI PRIDE_12 | SMT N SHILPA |
| VAISHNAVI PRIDE_13 | SRI KOSEGI AMARKANTH REDDY |
| VAISHNAVI PRIDE_14 | SRI KANIKE MALLIKARJUNA SWAMY |
| VAISHNAVI PRIDE_15 | SMT BOKKALAPALLY BHAGYA JYOTHI |
| VAISHNAVI PRIDE_16 | SRI KASSA SURYANARAYANA |
| VAISHNAVI PRIDE_17 | SMT MALYALA ARUNA |
| VAISHNAVI PRIDE_18 | SRI M V RAMAKRISHNA |
| VAISHNAVI PRIDE_19 | SMT PULKURTHI SATHYAVATHI |
| VAISHNAVI PRIDE_20 | SRI CHAVVA KRISHNAIAH |
| VAISHNAVI PRIDE_21 | SRI KADARI PENTU RAJ |
| VAISHNAVI PRIDE_22 | SRI GUNTI ANJANEYULU |
| VAISHNAVI PRIDE_23 | SRI D RAMESH |
| VAISHNAVI PRIDE_24 | SRI BANDAMEEDIPALLY KUMMARI RAKESH KUMAR |
| VAISHNAVI PRIDE_25 | SRI MODEPALLY KONDAIAH |
| VAISHNAVI PRIDE_26 | SMT KAMMARI PRAMEELA DEVI |
| VAISHNAVI PRIDE_27 | DR KARANAM KALYANI |
Amenities
| Facility | Available | % Completed | Status |
|---|---|---|---|
| Open Parking (In sqmts) | 308 | 0 | 0 |
| Covered Parking ( In Numbers) | 3084 | 0 | 0 |
Unit Details
| Sr.No. | Floor | Mortgage | Apartment Type | Saleable Area (sqm) | No. of Apartments | No. Booked |
|---|---|---|---|---|---|---|
| 1 | 1 | False | 2 BHK | 115.01 | 2 | 0 |
| 2 | 1 | False | 3 BHK | 149.39 | 1 | 0 |
| 3 | 1 | False | CLUB HOUSE | 0 | 0 | 0 |
| 4 | 1 | False | 2BHK | 97.46 | 18 | 0 |
| 5 | 2 | False | 2 BHK | 115.01 | 2 | 0 |
| 6 | 2 | False | 3 BHK | 149.39 | 1 | 0 |
| 7 | 2 | False | 2 BHK | 97.46 | 7 | 0 |
| 8 | 2 | True | 2 BHK | 97.46 | 20 | 0 |
| 9 | 3 | False | 2 BHK | 97.46 | 27 | 0 |
| 10 | 3 | False | 2 BHK | 115.01 | 2 | 0 |
| 11 | 3 | False | 3 BHK | 149.39 | 1 | 0 |
| 12 | 4 | False | 2 BHK | 97.46 | 27 | 0 |
| 13 | 4 | False | 2 BHK | 115.01 | 2 | 0 |
| 14 | 4 | False | 3 BHK | 149.39 | 1 | 0 |
| 15 | 5 | False | 2 BHK | 97.46 | 27 | 0 |
| 16 | 5 | False | 2 BHK | 115.01 | 2 | 0 |
| 17 | 5 | False | 3 BHK | 149.39 | 1 | 0 |
Professionals
| Name | Certificate No. | Role |
|---|---|---|
| 1 | Excavation | 0 |
| 2 | X number of Basement(s) and Plinth | 0 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 0 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 0 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 0 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 0 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 0 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 0 |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | 0 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in