WHISTLING WOODS

ARYAMITRA PROPERTIES

ALKAPURI TOWNSHIP, NECKNAMPUR

RERA approved

Approved

26th Jul 2017

Project completed

Completed

31st Aug 2019

Registration No.

P02400001193

Project Type

Residential

Approving Authority

HMDA

District

Ranga Reddy

Taluka

Rajendranagar

State

Telangana

Project Details

Registration No.P02400001193
Certificate No.P02400001193
Project StatusCompleted
Project TypeResidential
Authority NameHMDA
Plan Approval No.101425/P4/Plg/H/2014
Proposed Completion2019-08-31
DistrictRanga Reddy
MandalRajendranagar
StreetMAIN ROAD
LocalityALKAPURI TOWNSHIP, NECKNAMPUR
Pin Code500089
Last Modified2019-09-17

Land Details

Sy.No./TS No.150/P
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)19804.99
Net Area (sqmts)19804.99
Total Building Units5
Approved Built-up Area61221
Mortgage Area5686
Boundaries EastLAND OF KUTUMBA RAO
Boundaries West40 FT PASSAGE
Boundaries North40 FT ROAD PASSAGE
Boundaries SouthPART OF SNO 150

Parking

SANJEEVA REDDY VADDIAuthorized Signatory
PRAVEENA PUTTARAMANNAGARIPartner
NARSI REDDY TEEGALAPartner

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums90
4Stilt Floor100
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums90
4Stilt Floor90
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums90
4Stilt Floor90
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums90
4Stilt Floor90
5X number of Slabs of Super Structure100
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50
1Excavation100
2X number of Basement(s) and Plinth100
3X number of Podiums90
4Stilt Floor90
5X number of Slabs of Super Structure90
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy