AVASANA S AARAV
AVASANA CONSTRUCTIONS
HYDERABAD
Approved
30th Aug 2022
Completed
30th Aug 2025
Registration No.
P01100007719
Project Type
Residential
Approving Authority
HMDA
District
Sangareddy
Taluka
AMEENPUR
State
Telangana
Project Details
| Registration No. | P01100007719 |
| Certificate No. | P01100007719 |
| Project Status | Completed |
| Project Type | Residential |
| Authority Name | HMDA |
| Plan Approval No. | Project Name |
| Proposed Completion | 2025-08-30 |
| District | Sangareddy |
| Mandal | AMEENPUR |
| Street | PATELGUDA |
| Locality | HYDERABAD |
| Pin Code | 502319 |
Land Details
| Sy.No./TS No. | Plot No./House No. |
| Plot No./House No. | Total Area(In sqmts) |
| Total Area (sqmts) | 836.13 |
| Net Area (sqmts) | 836.13 |
| Total Building Units | 1 |
| Approved Built-up Area | 2379.64 |
| Boundaries East | PLOT NO 157 158 |
| Boundaries West | ROAD |
| Boundaries North | PLOT NO 168 |
| Boundaries South | ROAD |
Parking
| AVASANA S AARAV | KOTHAPALLY VISHUVARDHANA |
Amenities
| Facility | Available | % Completed | Status |
|---|---|---|---|
| Open Parking (In sqmts) | 604 | 0 | 0 |
| Covered Parking ( In Numbers) | 20 | 0 | 0 |
Unit Details
| Sr.No. | Floor | Mortgage | Apartment Type | Saleable Area (sqm) | No. of Apartments | No. Booked |
|---|---|---|---|---|---|---|
| 1 | 1 | True | TWO BED ROOM | 105 | 101 | 0 |
| 2 | 1 | True | THREE BED ROOM | 130 | 102 | 0 |
| 3 | 1 | False | THREE BED ROOM | 130 | 103 | 0 |
| 4 | 1 | True | TWO BED ROOM | 103 | 104 | 0 |
| 5 | 2 | False | TWO BED ROOM | 105 | 201 | 0 |
| 6 | 2 | False | THREE BED ROOM | 130 | 202 | 0 |
| 7 | 2 | False | THREE BED ROOM | 130 | 203 | 0 |
| 8 | 2 | False | TWO BED ROOM | 103 | 204 | 0 |
| 9 | 3 | False | TWO BED ROOM | 105 | 301 | 0 |
| 10 | 3 | False | THREE BED ROOM | 130 | 302 | 0 |
| 11 | 3 | False | THREE BED ROOM | 130 | 303 | 0 |
| 12 | 3 | False | TWO BED ROOM | 103 | 304 | 0 |
| 13 | 4 | False | TWO BED ROOM | 105 | 401 | 0 |
| 14 | 4 | False | THREE BED ROOM | 130 | 402 | 0 |
| 15 | 4 | False | THREE BED ROOM | 130 | 403 | 0 |
| 16 | 4 | False | TWO BED ROOM | 103 | 404 | 0 |
| 17 | 5 | False | TWO BED ROOM | 105 | 501 | 0 |
| 18 | 5 | False | THREE BED ROOM | 130 | 502 | 0 |
| 19 | 5 | False | THREE BED ROOM | 130 | 503 | 0 |
| 20 | 5 | False | TWO BED ROOM | 103 | 504 | 0 |
Professionals
| Name | Certificate No. | Role |
|---|---|---|
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 0 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 50 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 0 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 0 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 0 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 0 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 0 |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | 25 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Warangal


Ask Pulse Ai anything about real estate





