ANTHELA

M/S BHARAT NAGAR HOUSING

Agra, Uttar Pradesh

RERA approved

Approved

1st Oct 2017

Project completed

Completed

16th Mar 2022

Registration No.

UPRERAPRJ9111

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ9111
Project StatusCompleted
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2017-10-01
Completion Date2022-03-16
Total Area (sqm)23784
Project Cost (Lacs)13234
Duration (Months)54
Registration Fee124000

Promoter Details

Promoter NameM/S BHARAT NAGAR HOUSING
Promoter IDUPRERAPRM17432
Mobile99********

Project Team

rolename
ArchitectPEEYUSH SRIVASTAVA
Structural EngineerJITENDRA KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPOCKET-B, SECTOR 12D, AVAS VIKAS SIKANDRA YOJNA,23783.36

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
ABSMNTOTHER00-
AGF2 BHK8406.440
A12 BHK8406.44-
A22 BHK8406.44-
A32 BHK8406.44-
A42 BHK8406.44-
A52 BHK8406.44-
A62 BHK8406.44-
A72 BHK7355.14-
A82 BHK7355.14-
A92 BHK7355.14-
A102 BHK7355.14-
A112 BHK7355.14-
A122 BHK7355.14-
A132 BHK7355.14-
BBSMNTOTHER00-
BGF2 BHK8406.440
B12 BHK8406.44-
B22 BHK8406.44-
B32 BHK8406.44-
B42 BHK8406.44-
B52 BHK8406.44-
B62 BHK8406.44-
B72 BHK7355.14-
B82 BHK7355.14-
B92 BHK7355.14-
B102 BHK7355.14-
B112 BHK7355.14-
B122 BHK7355.14-
B132 BHK7355.14-
CBSMNTOTHER00-
CGF2 BHK8406.440
C12 BHK8406.44-
C22 BHK8406.44-
C32 BHK8406.44-
C42 BHK8406.44-
C52 BHK8406.44-
C62 BHK8406.44-
C72 BHK7355.14-
C71 BHK133.83-
C82 BHK7355.14-
C81 BHK133.83-
C92 BHK7355.14-
C102 BHK7355.14-
C112 BHK7355.14-
C122 BHK7355.14-
C132 BHK7355.14-
DBSMNTOTHER00-
DGF2 BHK7356.140
D12 BHK8406.44-
D22 BHK8406.44-
D32 BHK8406.44-
D42 BHK8406.44-
D62 BHK8406.44-
D72 BHK8406.44-
D82 BHK8406.44-
D92 BHK8406.44-
D102 BHK8406.44-
D112 BHK8406.44-
D122 BHK8406.44-
D132 BHK8406.44-
EBSMNTOTHER00-
EGF2 BHK8406.440
E12 BHK8406.44-
E22 BHK8406.44-
E32 BHK8406.44-
E42 BHK8406.44-
E52 BHK8406.44-
E62 BHK8406.44-
E72 BHK8406.44-
E82 BHK8406.44-
E92 BHK8406.44-
E102 BHK8406.44-
E112 BHK8406.44-
E122 BHK8406.44-
FBSMNTOTHER00-
FGF2 BHK7356.140
F12 BHK8406.44-
F22 BHK8406.44-
F32 BHK8406.44-
F42 BHK8406.44-
F52 BHK8406.44-
F62 BHK8406.44-
F72 BHK8406.44-
F82 BHK8406.44-
F92 BHK8406.44-
F102 BHK8406.44-
F112 BHK8406.44-
F122 BHK8406.44-
F132 BHK8406.44-
GBSMNTOTHER00-
GGF2 BHK8406.440
G12 BHK8406.44-
G22 BHK8406.44-
G32 BHK8406.44-
G42 BHK8406.44-
G52 BHK8406.44-
G62 BHK8406.44-
G72 BHK7355.14-
G71 BHK133.83-
G82 BHK7355.14-
G81 BHK133.83-
G92 BHK7355.14-
G102 BHK7355.14-
G112 BHK7355.14-
G122 BHK7355.14-
G132 BHK7355.14-
HBSMNTOTHER00-
HGF2 BHK8406.440
H12 BHK8406.44-
H22 BHK8406.44-
H32 BHK8406.44-
H42 BHK8406.44-
H52 BHK8406.44-
H62 BHK8406.44-
H72 BHK7355.14-
H71 BHK133.83-
H82 BHK7355.14-
H81 BHK133.83-
H92 BHK7355.14-
H102 BHK7355.14-
H112 BHK7355.14-
H122 BHK7355.14-
H132 BHK7355.14-
IBSMNTOTHER00-
IGF2 BHK8406.440
I12 BHK8406.44-
I22 BHK8406.44-
I32 BHK8406.44-
I42 BHK8406.44-
I52 BHK8406.44-
I62 BHK8406.44-
I72 BHK7355.14-
I82 BHK7355.14-
I92 BHK7355.14-
I102 BHK7355.14-
I112 BHK7355.14-
I122 BHK7355.14-
I132 BHK7355.14-
E132 BHK8406.44-
D52 BHK8406.44-

Development Works

work_namedescription
Demarcation of PlotsThis is single plot of roughly rectangular shape , having total 3 no. of entry gate in which 1 main gate having grand entrance from the 30m wide front road and rest of 2 are secondary gates from 9 m wide road. Site is surronded by other plots on two side
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed . AAC block work and rcc work in column and beam may be used as per design. Entrance gates will be created at the main entrance .Steel Gates will used at secondary entrances
Road WorkBituman based road will be created for all internal road works with concrete pavers at certain junction points
FootpathsAll internal roads will have 0.75m wide footpath in 40- 60 mm thick concrete pavers or equivalent finishes
Water Supply Including Drinking Water FacilitiesUP JAl Board will provide the water supply to the Plot and Individual . Ground water may also be used after taking approval from statuary departmen. Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on each building terrace for distribution through gravity
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
ParksThere is one main central park between the towers with different recretional activities. There are more green parks by the boundary wall on two sides of the complex
Tree PlantingThere are 5 type of trees povided in site which are kachnar, gulmauhar, amaltas, kusum and neem.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.
Community BuildingsCommunity activity area shall be provided at the terrace level which shall be accessed by all residents
Treatment and Disposal System of Sewage and Sullage waterCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemSince the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department
Social Infrastructure And Other Public Amenities Including Public Health ServicesSewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
Emergency Evacuation ServicesRefuge areas with acess througha fire door shall be provided at certain floors for evacuation of people. Balcony will also be used for evacuation.Assembly points areas will be demarcated for earthquake and other possible disasters
Other Miscellaneous WorkN.A

Bank Details

Bank NameYES BANK LIMITED
BranchAGRA MAIN BRANCH
Branch AddressSANJAY PLACE, AGRA
Account Holder005081300000652
Account Number005081300000652
IFSC CodeYESB0000050

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy