Anthem
M/S BHARAT NAGAR HOUSING
Agra, Uttar Pradesh
Approved
1st Jul 2017
Completed
5th Sept 2022
Registration No.
UPRERAPRJ8530
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ8530 |
| Project Status | Completed |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2017-07-01 |
| Completion Date | 2022-09-05 |
| Total Area (sqm) | 111689 |
| Project Cost (Lacs) | 2500 |
| Duration (Months) | 63 |
| Registration Fee | 574000 |
Promoter Details
| Promoter Name | M/S BHARAT NAGAR HOUSING |
| Promoter ID | UPRERAPRM17432 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | PEEYUSH SRIVASTAVA |
| Structural Engineer | JITENDRA KUMAR |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | POCKET-A, SECTOR-15, AVAS VIKAS YOJNA, AVAS VIKAS | 113777.29 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is irregular shape of plot, having total 12 no. of entry gate in which 1 main gate having grand entrance from the 24m wide front road and rest of 11 are secondary gates. Site is covered by many housing society. |
| Boundary Wall | 3 m high and 230 mm thick Boundary wall designed with european theme. AAC block work and rcc work in column and beam. At the center face of boundary wall there is a Logo of Anthem which give a beautiful iconic design to boundary wall. |
| Road Work | At the main avenue dark gray and light gray colors cobble stones are used and bitumen road. |
| Footpaths | There are 3 type of road in this society (7.5 m, 9m and 10.5m), having 1.5 m wide footpath. 60 mm thick pavers used in footpath with beautiful pattern. |
| Water Supply Including Drinking Water Facilities | UP JAl Board will provide the water supply to each Plot and Individual tenant may be also ground water after taking approval from statuary departmen. Also end user shall be used their individual RO system as per their requirement, if required we can consider overhead tank also of appropriate capacity to cover the water supply for entire town ship. |
| Sewer System | Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system. |
| Drain | Storm water shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain line. Also as per CGWA, each tenant have to construct individual Plot RWH if plot area shall be more 100 sqmt. |
| Parks | There are 4 main central park are provided with the different activities and another park is near club and ews having gaming and swimming pool facilities. |
| Tree Planting | There are 5 type of trees povided in site with the total no. of 480. which are kachnar, gulmauhar, amaltas, kusum and neem. |
| Design For Electric Supply Including Street Lighting | We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,Fountain,STP,Pump room etc. |
| Community Buildings | A club is provided in Anthem, which is designed in beautiful european theme. |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | We will sugggested to tenant to use low flow fixtures as well dual flush cistern and rai water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.And we will suggest to tenant also to use LED lights Fitting. |
| Fire Protection And Fire Safety System | This Project don’t have any high rise building, its have individual Plot for Residential as well as Commercial.Hence there are not need to do any Fire Fighting facility.Individual owner can be installed their own system as per their and local authorities requirement. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain. |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | Not Applicable |
Bank Details
| Bank Name | YES BANK LIMITED |
| Branch | MAIN BRANCH, AGRA |
| Branch Address | SANJAY PLACE, AGRA |
| Account Holder | BHARAT NAGAR HOUSING |
| Account Number | 005081300000747 |
| IFSC Code | YESB0000050 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in