New Launch - India Real Estate Report 2026.

APARNA PREM EXTENSION

PREM INFRACITY PVT LTD

Agra, Uttar Pradesh

RERA approved

Approved

1st Jan 2024

Completion pending

Pending

21st Apr 2027

Registration No.

UPRERAPRJ721193/04/2024

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ721193/04/2024
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2024-01-01
Completion Date2027-04-21
Total Area (sqm)18628
Project Cost (Lacs)4912
Duration (Months)40
Registration Fee98500

Promoter Details

Promoter NamePREM INFRACITY PVT LTD
Promoter IDUPRERAPRM13614
Mobile89********

Project Team

rolename
ArchitectAmit Juneja
ContractorRajendra Babu
Structural EngineerMohit Chhbra

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraParts of Kh. No, 29,31,33,34,35,365648
Khasraparts of Kh.No. 29,31,33,34,35,365648
Khasrapart of Kh. No. 7, 37, 38, 39, 4014670

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Plot201
Plot481
Plot621
Villa821110
Villa831110
Villa831110
Villa831110
Villa831110
Villa831110
Villa831110
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa851111
Villa851111
Villa851111
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa841110
Villa861111
Villa861111
Villa831108
Villa801104
Villa791104
Villa811105
Villa831108
Villa851110
Villa871112
Villa941120
Villa941120
Villa941120
Villa941120
Villa941120
Villa941120
Villa931120
Villa931120
Villa931120
Villa931120
Villa931120
Villa9224120
Villa971125
Plot851
Plot631
Plot511
Plot1871
Plot881
Plot871
Plot881
Plot871
Plot861
Plot851
Plot851
Plot841
Plot601
Plot991
Plot701
Plot671
Plot651
Plot902
Plot1021
Plot1431
Plot1642
Plot1752
Plot1642
Plot1681
Plot1672
Plot1231
Plot1341
Plot1271
Plot1201
Plot2781
Plot1431

Development Works

work_namedescription
Demarcation of PlotsThe Plots will be demarcated as per the approved map from Agra Development Authority.
Boundary WallThe 2 m high boundary wall with solid foundation will be constructed for the project. The brick wall will be plastered and painted with all weather pain.
Road WorkThe interlocking paving block and CC road will be constructed for the project. The wearing course will be laid over the layers of compacted subgrade and the compacted granular layer as specified by the Engineer.
FootpathsThe colored interlocking tiles will be used for footpaths/Walkways. it will be laid on sand bed over the compacted specified earthen/granular layer.
Water Supply Including Drinking Water FacilitiesThe potable underground water will be pumped to Overhead water tank tat will be delivered to each individual unit through the network of underground PVC pipeline. The pipe line will also have the inspection chambers to assist the repairs if any. Each unit will have individual terrace tanks for storage.
Sewer SystemThe main sewer line will be designed as per norms and laid along-side road network of the project. The sewer will be collected from each unit through soil-Pipes and the network of pipes carrying it efficiently to the sewage treatment plant designated for the project.
DrainA ted in the of underground and surface drain will be constructed in the project. The masonry chamber will be constructed as per design by engineer.
Parks4 Lush green parks as per the approved layout will be developed in the project with amenities for the kids and elderly
Tree PlantingMaximum number of trees will be planted as per the existing guidelines and norms at all suitable location of the project. The trees will be selected as to be suited to the flora and add the aesthetics to the project.
Design For Electric Supply Including Street LightingThe electricity plan for the project will be designed as per the U.P. Electricity board guidelines and the approval for the project. 4.5 m high electric poles along with distribution boxes will be installed to provide supply to all units.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe state of the art multiple chamber sewage treatment plant dedicated to the project will be installed. The capacity will be designed to cater for all the domestic sewage waste of the project and bring the effluents with in the permissible range before disposal as per existing norms
Solid Waste Management And Disposal SystemThe waste from the individual residential units and the common areas of the project will be collected . The organic waste will be disposed to the specified locations as per norms
Water Conservation SystemThe filtration chambers will be constructed to collect the rain water and led to ground water with encased PVC pipe system. The capacity will be 3000 ltr. The landscape will be so designed to assist maximum rain water to reach the camber inlet
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable . The the Sector shopping area will be developed as per approved plan.
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAll activities for the betterment of the project

Bank Details

Bank NameSTATE BANK OF INDIA
BranchSANJAY PLACE, AGRA
Branch Address59-61/4, SANJAY PLACE, AGRA
Account HolderPREM INFRACITY PVT LTD- APARNA PREM EXT-COLLECTION ACCOUNT
Account Number42478110575
IFSC CodeSBIN0015446

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy