New Launch - India Real Estate Report 2026.

APNAA AWAS

ATUL INFRAESTATE LLP.

Agra, Uttar Pradesh

RERA approved

Approved

15th Sept 2018

Completion pending

Pending

31st Dec 2026

Registration No.

UPRERAPRJ17447

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ17447
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2018-09-15
Completion Date2026-12-31
Total Area (sqm)17610
Project Cost (Lacs)3600
Duration (Months)100
Registration Fee93500

Promoter Details

Promoter NameATUL INFRAESTATE LLP.
Promoter IDUPRERAPRM55910
Mobile99********

Project Team

rolename
ArchitectPEEYUSH SRIVASTAVA
ContractorTILL NOW NOT FINALIZED
Structural EngineerMR. D.K. RUSTAGI

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraKHASRA NO. 3017610.20

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
AGF1 BHK1322.770
A11 BHK1322.77-
A21 BHK1322.77-
A31 BHK1322.77-
EGF1 BHK1322.770
E11 BHK1322.77-
E21 BHK1322.77-
E31 BHK1322.77-
FGF1 BHK1322.770
F11 BHK1322.77-
F21 BHK1322.77-
F31 BHK1322.77-
GGF1 BHK1322.770
G11 BHK1322.77-
G21 BHK1322.77-
G31 BHK1322.77-
HGF1 BHK1322.770
H11 BHK1322.77-
H21 BHK1322.77-
H31 BHK1322.77-
IGF1 BHK1322.770
I11 BHK1322.77-
I21 BHK1322.77-
I31 BHK1322.77-
KGF1 BHK1322.770
K11 BHK1322.77-
K21 BHK1322.77-
K31 BHK1322.77-
LGF1 BHK1322.770
L11 BHK1322.77-
L21 BHK1322.77-
L31 BHK1322.77-
MGF1 BHK1322.770
M11 BHK1322.77-
M21 BHK1322.77-
M31 BHK1322.77-
NGF1 BHK1322.770
N11 BHK1322.77-
N21 BHK1322.77-
N31 BHK1322.77-
OGF1 BHK1322.770
O11 BHK1322.77-
O21 BHK1322.77-
O31 BHK1322.77-
PGF1 BHK1322.770
P11 BHK1322.77-
P21 BHK1322.77-
P31 BHK1322.77-
QGF1 BHK1322.770
Q11 BHK1322.77-
Q21 BHK1322.77-
Q31 BHK1322.77-
RGF1 BHK1322.770
R11 BHK1322.77-
R21 BHK1322.77-
R31 BHK1322.77-
JGF1 BHK922.770
JGFSHOP412.480
JGFSHOP413.370
J11 BHK1322.77-
J21 BHK1322.77-
J31 BHK1322.77-
BGF1 BHK1322.770
B11 BHK1322.77-
B21 BHK1322.77-
B31 BHK1322.77-
CGF1 BHK1322.770
C11 BHK1322.77-
C21 BHK1322.77-
C31 BHK1322.77-
DGF1 BHK1322.770
D11 BHK1322.77-
D21 BHK1322.77-
D31 BHK1322.77-
SHOPGFSHOP410.40

Development Works

work_namedescription
Demarcation of PlotsRectangular Plot having 18479.65 sqm area, Accessible from 24 m wide road. Plot is 88.71m wide at the Front side, from the right = 190.37m, from the left =206.99 & the rear side is 88.98m wide.
Boundary WallUsing 230 mm thick brick wall having ms grills on the top.
Road WorkThere are 6 m and 4.5 m wide internal road are provided. In which 6 m is for fire tender movement.
Footpaths"750 mm wide footpath is provided. street lights, plantation and other services are also provided in footpath."
Water Supply Including Drinking Water FacilitiesWe have provided overhead tanks.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water drain shall be Provided. Storm water from Roof,Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit to recharge the Ground water and overflow shall be connect with Municple drain line.
ParksGreen area/parks are located at the center of plot in two parts and third one is along the boundary wall.
Tree PlantingIndegenious trees are proposed for planting.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board.
Community BuildingsN/A
Treatment and Disposal System of Sewage and Sullage waterCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemFor solid waste proper garbage collection area provided at site.
Water Conservation SystemWe will use low flow fixtures and rain water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergyWe will use energy efficient lights fitting in all area. In STP and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health Services"Sewerage ,Storm water and water supply system shall be Provided. Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain."
Emergency Evacuation Services3 no of exits are provided in each block, and staircase is open from the front.
Other Miscellaneous WorkN/A

Bank Details

Bank NameYES BANK LTD
BranchYES BANK LTD Sanjay Place Agra
Branch AddressSanjay Place Agra
Account HolderM/S ATUL INFRAESTATE LLP LTD.
Account Number005081300000792
IFSC CodeYESB0000050

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy