New Launch - India Real Estate Report 2026.

BANSURI VILLAS

BANSURI HOUSING

Agra, Uttar Pradesh

RERA approved

Approved

1st Jul 2022

Completion pending

Pending

5th Jun 2027

Registration No.

UPRERAPRJ563214

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ563214
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2022-07-01
Completion Date2027-06-05
Total Area (sqm)17000
Project Cost (Lacs)4125
Duration (Months)60
Registration Fee90000

Promoter Details

Promoter NameBANSURI HOUSING
Promoter IDUPRERAPRM191122
Mobile93********

Project Team

rolename
ArchitectRamvir Singh
ContractorBansuri Housing - Self
Structural EngineerA.K. Upadhyay

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. R-7, Sector D, Shastripuram, Sikandra, Agra17000
PlotPart of Bulk Sale plot No. R-7, Situated at Bansuri Villas Colony, Shastripuram Colony, Agra3594.18

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa1238160
Plot12332
Plot1262
Plot11322
Plot1001
Plot9720
Plot1751
Plot1185
Plot1251
Plot1601
Plot2651
Plot2661

Development Works

work_namedescription
Demarcation of PlotsThe project land and all the plots in it along with parks, common areas , roads, drains etc. will be demarcated as per the approved map by Agra Development Authority. The latest Survey equipment will be used to keep every measurement and orientation exactly as per approval .
Boundary WallA six to Eight feet high boundary wall will be constructed in Brick and mortar. The brick wall will be plastered and painted with all season paint. The Boundary wall will designed to resist earthquake with 5 feet deep foundation.
Road WorkThe road work will comprise of compacted subgrade and the compacted granular base of 150mm. The wearing course will be suitably chosen as per location varying from Rigid Pavement/ Paver Blocks / Flexible Pavement.
FootpathsThe Paver block of M-15 compressive strength will be laid over the 50 mm sand layer. The Granular layer will be compacted to minimum depth of 100 mm over the compacted earth .
Water Supply Including Drinking Water FacilitiesThe Ground water will be pumped to the underground water tank using a submersible pump set . The water from the Underground tank will then again be pumped to the roof tanks of the villas and PVC pipe connection will be taken up to each unit . The head will be created through the pump so as to avoid any other pressure requirement.
Sewer SystemThe Sewer system will be designed with under ground hume pipes jointed to avoid any leakage. The slopes will be so maintained to assist the egress of the domestic sewer to the municipal sewer line. The dia of pipes will vary from 300mm to 400mm and the man holes will be provided as suitable lengths and locations to assist maintaining the sewer line.
DrainThe lined cover drains will be constructed across the project . The cross drainage structures will be constructed d at all locations where it is required. The trapezium shaped drain with top width of minimum 300mm will be constructed to assist the rapid regress of the domestic drain water and storm water.
ParksLush green parks will be constructed and maintained as per the landscape plan . The will be play area for kids and sitting areas for elderly.
Tree PlantingThe trees will be planted at all suitable locations of the project . The tress will be selected basis the quality of soil in the project . The trees will be planted along the periphery of the parks and along the boundary wall
Design For Electric Supply Including Street LightingThe separate transformer will be installed for the project basis the calculation done by Torrent Power limited to suffice the requirement of domestic needs of the project. The electricity will be distributed through the electrical poles and the distribution boxes. The street lights will be min. 4.5 m high.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterNot Applicable. The sewer will be disposed to municipal sewer line.
Solid Waste Management And Disposal SystemGarbage collection centers 2.5 m x 6m in two numbers will be constructed . In addition to that the dustbins will be installed at all suitable location to collect and dispose the garbage
Water Conservation SystemAn 150 mm bore hole fitted with perforated pipe will be installed at the catchment zone. The pipe will be going minimum 8m deep . The collection chamber will have multi stage filtration system starting from gravels leading to sand for the minimum depth of 500mm. The collected water will be filtered through the arrangement and will help recharge the water table.
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAll the necessary arrangements will be made to improve the quality of the project

Bank Details

Bank NameCANARA BANK
BranchM.G. ROAD-AGRA
Branch Address71, M.G ROAD, NEHEU NAGAR, AGRA
Account HolderBansuri Housing Collection Account For Bansuri Villas
Account Number120001726507
IFSC CodeCNRB0000192

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy