BHAWNA CITY PHASE 2

Bhawna Housing Private Limited

Agra, Uttar Pradesh

RERA approved

Approved

1st Feb 2022

Completion pending

Pending

26th Dec 2026

Registration No.

UPRERAPRJ780042

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ780042
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2022-02-01
Completion Date2026-12-26
Total Area (sqm)17571
Project Cost (Lacs)4210
Duration (Months)59
Registration Fee93000

Promoter Details

Promoter NameBhawna Housing Private Limited
Promoter IDUPRERAPRM124810
Mobile84********

Project Team

rolename
ArchitectAmit Kumar
ContractorSelf
Structural EngineerAshish Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. 3 Kh. No. 171(m) Mauja Mohhamadpur, Agra209.02
PlotPlot No. 2 Kh. No. 171(m) Mauja Mohhamadpur, Agra209.02
PlotPlot No. 5 Kh. No. 171(m) Mauja Mohhamadpur, Agra209.02
PlotPlot No. 4 Kh. No. 171(m) Mauja Mohhamadpur, Agra209.02
PlotPlot No. 1 Kh. No. 171(m) Mauja Mohhamadpur, Agra214.31
KhasraKhata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra2672
KhasraKhata No. 91 Khasra No . 148 and 152/2 Mauja Mohhamadpur, Agra2672
KhasraKhata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra2672
KhasraKhata No. 91 Khasra No. 148 and 152/2 Mauja Mohhamadpur, Agra2672
KhasraKhata No. 91 Khasra No 148 and 152/2 , Mauja Mohhamadpu, Agra2672
KhasraKhata No. 104, Khasra No. 171(m), Mauja Mohhamadpur, Agra2879
KhasraKhata No. 104, Khasra No. 171(m), Mauja Mohhamadpur, Agra2879
KhasraKhasra No. 152/1 , Mauja Mohhamadpur, Agra17310

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa792127
Plot581
Plot591
Plot601
Plot611
Plot611
Plot611
Plot611
Plot611
Plot611
Plot6116
Plot621
Plot621
Plot621
Plot621
Plot621
Plot621
Plot621
Plot631
Plot631
Plot661
Plot7012
Plot741
Plot741
Plot781
Plot791
Plot797
Plot801
Plot811
Plot821
Plot832
Plot843
Plot841
Plot841
Plot861
Plot861
Plot871
Plot871
Plot901
Plot921
Plot921
Plot1011
Plot1051
Plot1072
Plot10726
Plot1082
Plot1171
Plot1272
Plot1283
Plot991
Plot1041
Plot1101
Plot1151
Plot1201
Plot971
Plot1311

Development Works

work_namedescription
Demarcation of PlotsThere are total of 122 plots in this project. The plots will be demarcated with latest measurement methods to the exact dimension and orientation as per the approved maps.
Boundary WallA 6 to 8 feet high boundary wall will be constructed to ensure the privacy of the project. The boundary wall will be constructed in Brick-Mortar. The foundation of the boundary wall will be minimum 3 feet deep and will be designed to be earthquake resistant. The boundary wall will be plastered and Painted will all weather paint.
Road WorkRoads will be constructed as per the approved dimensions and orientation maintaining the transverse and longitudinal slopes. The crust will comprise of the compacted Subgrade to the minimum depth of 300 mm. The Granular layers will be laid on top of it and compacted to the minimum of 95 percent compaction. The wearing course providing the smooth riding quality will be paved over it.
FootpathsThe footpaths will be constructed at the periphery of the part and all desired/required locations using paver blocks. The four to six inches paver blocks with minimum strength of M-15 grade will be laid on the on the compacted bed with sand bed of minimum 40mm.
Water Supply Including Drinking Water FacilitiesThis project is an extension of the existing project adjacent to this one by the name " Bhawna City" . Both these projects are to share the common facilities as per the approvals by Agra Development Authority. The Over head tank is part of other project that will cater for this project as well. The PVC underground pipe lines will be laid leading to all the units of the project. The connection will be made to the terrace tanks of the villas .The Potable ground water will be supplied to the OHT through submersible pump set
Sewer SystemImpermeable hume Pipes will be laid be laid to collect the domestic sewer. The pipes are laid at slopes to cater the smooth dispersal of the sewer to the sewage treatment plant. The man holes will be constructed at regular intervals and at change in slopes and direction of flow to maintain the efficiency of the sewer system
DrainLined covered and open drains will be constructed to the minimum cross sectional dimension to cater for the waster water from the residential units and the rain water . The slopes of the the drains and the CD structures will be maintained to assist the rapid regress of the the drain water.
ParksIn total there will be 5 parks in the entire project inclusive of both phases. 1 park is specific to this phase of project . The parks will be lush green maintaining the landscape . There will sitting arrangements for the elderly and playing areas for the kids
Tree PlantingAll season trees will be planted in the project along the park boundaries and project periphery. The tress selected are suitable to the soil ( Flaura and Fauna ) of the area.
Design For Electric Supply Including Street LightingThe entire project is in two phases, the electrical load sanctions are done by the Torrent power Limited and the transformers are installed. The electrical connect underground or over head will be lead to each unit and the connection will be provided through distribution boxes . The 4.5 m high street lights will be erected along the rad sections and the suitable common areas of the project.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSewage treatment plant is common for both the phases of the project.. The state of the art multi treatment stage STP will be installed in the project to cater for the domestic sewer. The sewer will be treated to bring the effluents levels below the permissible levels of contamination if any and will then be removed as per Nagar-Nigam norms
Solid Waste Management And Disposal SystemThe project will have designated dustbins located at the common areas . The arrangement for the cleaning and the collection of waste the waste from the project . A dalab ghar will also be constructed as per Approve map.
Water Conservation SystemRain water harvesting systems will be installed in the projects having harvesting and percolation pits with multistage granular filters and maintenance chamber . The perforated pipes filled with sand will lead the catchment areas collected water post treatment to the water table recharging the same .
Energy Management System Including Use of Renewable EnergyThe solar panels will be installed to cater for all the common lighting requirements of the project.
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAll necessary works to necessary to the project

Bank Details

Bank NameICICI Bank
BranchAgra Mathura Road
Branch AddressMayur Complex, Nagla Padi , Agra Mathura Road, Agra 282005
Account HolderBhawna Housing Private Limited Collection Account for Bhawna City Phase 2
Account Number191405001172
IFSC CodeICIC0001914

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy