New Launch - India Real Estate Report 2026.

BIBHAB GARDEN CITY

BIBHAB BUILDERS

Agra, Uttar Pradesh

RERA approved

Approved

1st Aug 2022

Completion pending

Pending

26th Apr 2027

Registration No.

UPRERAPRJ123116

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ123116
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2022-08-01
Completion Date2027-04-26
Total Area (sqm)11435
Project Cost (Lacs)1028
Duration (Months)57
Registration Fee62500

Promoter Details

Promoter NameBIBHAB BUILDERS
Promoter IDUPRERAPRM217017
Mobile97********

Project Team

rolename
ArchitectRohit Khandelwal
ContractorSelf
Structural EngineerP.K. Gupta

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraLand at part of Khasra No. 67, Mauja Miyapur, Agra13527

Development Works

work_namedescription
Demarcation of PlotsThe Project Land will be demarcated with the Boundary wall. The Demarcated land will be as per the approved and sanctioned map of Agra Development Authority. The individual plots will be demarcated using survey tools to match the shape , size and orientation as per approved map by Agra Development Authority.
Boundary WallBoundary wall of 6 to 8 feet height with provision of barbed wire at certain locations. The depth of wall foundation will be as per design to ensure the wall is earthquake resistant. The brick wall will be done with cement mortar and the plastered and painted with all season paint.
Road WorkThe project has road widths of 9.0 m and 7.5m. The paved section will be constructed using interlocking paver blocks with M-40 compressive strength and depth as per design. The paver blocks will be laid on 50mm sand bed laid over compacted granular layer.
FootpathsThe foot path will be done with interlocking paver blocks of M-20 compressive strength . The paver block will be colored to accentuate the walking experience and the surface will be anti-skid and comfortable for walking.
Water Supply Including Drinking Water FacilitiesThe potable ground water will be extracted through a submersible pump. The pumped water will lead to the overhead tank and the same will reach the individual units through under ground PVC pipe line.
Sewer SystemThe sewer system will be constructed in the project . The Man holes and the connecting hume pipes will be installed to ensure continuous flow of domestic sewer through slope to the municipal sewer line.
DrainLined covered drains will be constructed with MS grills sections for inspection. The drain will be designed to cater the domestic and rains water . The drains discharge will e connected to the municipal drain
Parks2 Parks will be developed in the project as per approved sanctioned map by Agra Development Authority. the total area covered by the parks will be more than 1000 square meter. The park will be developed as per landscape plan. The grass cover and footpath will be provided.
Tree PlantingThe trees will be planted along the boundary walls and periphery of park and at all suitable locations of the project to the minimum numbers as per sanction.
Design For Electric Supply Including Street LightingThe transformer will be installed as per approved load sanctioned by the electrical department. The electrical connection will be lead to each unit through overhead wires and distribution boxes. The ISI marked cables will be used in the project
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe state-of-the-Art sewage treatment plant will be installed in the project . The domestic sewer will be collected through sewer lines and into the collection chamber of STP where the sewer will be treated to bring the effluents level below the permissible limit prior to disposal in the municipal sewer or designated location
Solid Waste Management And Disposal SystemThe Garbage collection center covering the area of 15.66 square meter will be constructed in the project . The dust bins will be installed to keep the project clean and green
Water Conservation SystemA rain water harvesting pit will be installed to collect the runoff and discharge the water into the ground through collection chamber built for multi stage filtration . The filtered water will be carried throug the sand filled perforated pipe going t minimum depth of 40m
Energy Management System Including Use of Renewable EnergyNot Applicable. Yet all the green technologies will be adopted in the project
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicale
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAs per project requirement and improvements

Bank Details

Bank NamePunjab National Bank
BranchSurya Nagar, Agra
Branch AddressSurya Nagar, Agra 282002
Account HolderBibhab Builders Collection Account For Bibhab Garaden City
Account Number0983002100028377
IFSC CodePUNB0098300

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy