BIBHAB GARDEN CITY
BIBHAB BUILDERS
Agra, Uttar Pradesh
Approved
1st Aug 2022
Pending
26th Apr 2027
Registration No.
UPRERAPRJ123116
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ123116 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2022-08-01 |
| Completion Date | 2027-04-26 |
| Total Area (sqm) | 11435 |
| Project Cost (Lacs) | 1028 |
| Duration (Months) | 57 |
| Registration Fee | 62500 |
Promoter Details
| Promoter Name | BIBHAB BUILDERS |
| Promoter ID | UPRERAPRM217017 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Rohit Khandelwal |
| Contractor | Self |
| Structural Engineer | P.K. Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | Land at part of Khasra No. 67, Mauja Miyapur, Agra | 13527 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The Project Land will be demarcated with the Boundary wall. The Demarcated land will be as per the approved and sanctioned map of Agra Development Authority. The individual plots will be demarcated using survey tools to match the shape , size and orientation as per approved map by Agra Development Authority. |
| Boundary Wall | Boundary wall of 6 to 8 feet height with provision of barbed wire at certain locations. The depth of wall foundation will be as per design to ensure the wall is earthquake resistant. The brick wall will be done with cement mortar and the plastered and painted with all season paint. |
| Road Work | The project has road widths of 9.0 m and 7.5m. The paved section will be constructed using interlocking paver blocks with M-40 compressive strength and depth as per design. The paver blocks will be laid on 50mm sand bed laid over compacted granular layer. |
| Footpaths | The foot path will be done with interlocking paver blocks of M-20 compressive strength . The paver block will be colored to accentuate the walking experience and the surface will be anti-skid and comfortable for walking. |
| Water Supply Including Drinking Water Facilities | The potable ground water will be extracted through a submersible pump. The pumped water will lead to the overhead tank and the same will reach the individual units through under ground PVC pipe line. |
| Sewer System | The sewer system will be constructed in the project . The Man holes and the connecting hume pipes will be installed to ensure continuous flow of domestic sewer through slope to the municipal sewer line. |
| Drain | Lined covered drains will be constructed with MS grills sections for inspection. The drain will be designed to cater the domestic and rains water . The drains discharge will e connected to the municipal drain |
| Parks | 2 Parks will be developed in the project as per approved sanctioned map by Agra Development Authority. the total area covered by the parks will be more than 1000 square meter. The park will be developed as per landscape plan. The grass cover and footpath will be provided. |
| Tree Planting | The trees will be planted along the boundary walls and periphery of park and at all suitable locations of the project to the minimum numbers as per sanction. |
| Design For Electric Supply Including Street Lighting | The transformer will be installed as per approved load sanctioned by the electrical department. The electrical connection will be lead to each unit through overhead wires and distribution boxes. The ISI marked cables will be used in the project |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | The state-of-the-Art sewage treatment plant will be installed in the project . The domestic sewer will be collected through sewer lines and into the collection chamber of STP where the sewer will be treated to bring the effluents level below the permissible limit prior to disposal in the municipal sewer or designated location |
| Solid Waste Management And Disposal System | The Garbage collection center covering the area of 15.66 square meter will be constructed in the project . The dust bins will be installed to keep the project clean and green |
| Water Conservation System | A rain water harvesting pit will be installed to collect the runoff and discharge the water into the ground through collection chamber built for multi stage filtration . The filtered water will be carried throug the sand filled perforated pipe going t minimum depth of 40m |
| Energy Management System Including Use of Renewable Energy | Not Applicable. Yet all the green technologies will be adopted in the project |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicale |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per project requirement and improvements |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Surya Nagar, Agra |
| Branch Address | Surya Nagar, Agra 282002 |
| Account Holder | Bibhab Builders Collection Account For Bibhab Garaden City |
| Account Number | 0983002100028377 |
| IFSC Code | PUNB0098300 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





