BIBHAB GRANDE 2

BIBHAB BUILDWELL

Agra, Uttar Pradesh

RERA approved

Approved

1st Jul 2022

Project completed

Completed

31st Jul 2024

Registration No.

UPRERAPRJ290853

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ290853
Project StatusCompleted
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2022-07-01
Completion Date2024-07-31
Total Area (sqm)2669
Project Cost (Lacs)1858
Duration (Months)25
Registration Fee18500

Promoter Details

Promoter NameBIBHAB BUILDWELL
Promoter IDUPRERAPRM10147
Mobile97********

Project Team

rolename
ArchitectRohit Khandelwal
ContractorSelf
Structural EngineerPramod Kumar GuptaBF-

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraKhasra No. 72 (Part) Mauja Chamrauli, Agra2669

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BIBHAB GRANDE 2BSMNTOTHER00-
BIBHAB GRANDE 2BSMNT2OTHER00-
BIBHAB GRANDE 2BSMNT3OTHER00-
BIBHAB GRANDE 2GFOTHER000
BIBHAB GRANDE 213 BHK1148.89-
BIBHAB GRANDE 213 BHK1113.28-
BIBHAB GRANDE 213 BHK1125.22-
BIBHAB GRANDE 213 BHK1117.56-
BIBHAB GRANDE 213 BHK1115-
BIBHAB GRANDE 213 BHK195.95-
BIBHAB GRANDE 223 BHK1148.89-
BIBHAB GRANDE 223 BHK1113.28-
BIBHAB GRANDE 223 BHK1125.22-
BIBHAB GRANDE 223 BHK1117.56-
BIBHAB GRANDE 223 BHK1115-
BIBHAB GRANDE 223 BHK195.94-
BIBHAB GRANDE 233 BHK1148.89-
BIBHAB GRANDE 233 BHK1113.28-
BIBHAB GRANDE 233 BHK1125.22-
BIBHAB GRANDE 233 BHK1117.56-
BIBHAB GRANDE 233 BHK1115-
BIBHAB GRANDE 233 BHK195.94-
BIBHAB GRANDE 243 BHK1148.89-
BIBHAB GRANDE 243 BHK1113.28-
BIBHAB GRANDE 243 BHK1125.22-
BIBHAB GRANDE 243 BHK1117.56-
BIBHAB GRANDE 243 BHK1115-
BIBHAB GRANDE 243 BHK195.94-
BIBHAB GRANDE 253 BHK1148.89-
BIBHAB GRANDE 253 BHK1113.28-
BIBHAB GRANDE 253 BHK1125.22-
BIBHAB GRANDE 253 BHK1117.56-
BIBHAB GRANDE 253 BHK1115-
BIBHAB GRANDE 253 BHK195.94-
BIBHAB GRANDE 263 BHK1148.89-
BIBHAB GRANDE 263 BHK1113.28-
BIBHAB GRANDE 263 BHK1125.22-
BIBHAB GRANDE 263 BHK1117.56-
BIBHAB GRANDE 263 BHK1115-
BIBHAB GRANDE 263 BHK195.94-
BIBHAB GRANDE 273 BHK1148.89-
BIBHAB GRANDE 273 BHK1113.28-
BIBHAB GRANDE 273 BHK1125.22-
BIBHAB GRANDE 273 BHK1117.56-
BIBHAB GRANDE 273 BHK1115-
BIBHAB GRANDE 273 BHK195.94-
BIBHAB GRANDE 283 BHK1148.89-
BIBHAB GRANDE 283 BHK1113.28-
BIBHAB GRANDE 283 BHK1125.22-
BIBHAB GRANDE 283 BHK1117.56-
BIBHAB GRANDE 283 BHK1115-
BIBHAB GRANDE 283 BHK195.94-
BIBHAB GRANDE 293 BHK1148.89-
BIBHAB GRANDE 293 BHK1113.28-
BIBHAB GRANDE 293 BHK1125.22-
BIBHAB GRANDE 293 BHK1117.56-
BIBHAB GRANDE 293 BHK1115-
BIBHAB GRANDE 293 BHK195.94-
BIBHAB GRANDE 2101 BHK177.65-
BIBHAB GRANDE 2101 BHK182.85-
BIBHAB GRANDE 2101 BHK186.86-
BIBHAB GRANDE 2102 BHK188.95-
BIBHAB GRANDE 2103 BHK1110.48-
BIBHAB GRANDE 2103 BHK1114.17-
BIBHAB GRANDE 2111 BHK177.65-
BIBHAB GRANDE 2111 BHK182.85-
BIBHAB GRANDE 2111 BHK186.86-
BIBHAB GRANDE 2112 BHK188.95-
BIBHAB GRANDE 2113 BHK1110.48-
BIBHAB GRANDE 2113 BHK1114.17-

Development Works

work_namedescription
Demarcation of PlotsThe Project land will be demarcated with boundary wall. The building lines and offsets will be maintained as per approved plan by Agra Development Authority
Boundary WallThe proposed project is single entry project. The six to eight feet high boundary wall will be constructed. The boundary wall will be of bricks in cement mortar. The wall will have 4 to 5 feet deep foundation. The boundary wall will be plastered and painted with all weather paint.
Road WorkThe roads will have paver block of M-30/40 of 6 inches as top. Underneath the paver blocks the 60-80 mm sand will be laid to even out the levels . The granular layer of 100mm over the compacted subgrade will be provided for the stability. The levels and slopes will be maintained for smooth ride and quick run off of water
FootpathsThe Paver blocks of M-20 grade will be laid for footpaths . The thickness will be of 4 inches over sand bed and compacted subgrade.
Water Supply Including Drinking Water FacilitiesThe potable ground water will be supplied for the domestic use of the residents of the project . The water will be pumped through the submersible set up to the under ground water tank of 50kl. From there the water will be pumped to the rooftop tanks from where it will be supplied to all units and common areas.
Sewer SystemThe system of PVC and soil pipes will be installed in the project . The inspection chambers and the joints will be placed for maintenance and continuous flow of sewer to the sewer system at ground floor having man holes leading to sewage treatment plant.
DrainThe lined cover drains will be constructed in the project to cater for domestic waste water and rain run offs. The trapezium shaped drains will be constructed with top with of 450mm and minimum height of 300mmm to keep the head for continuous flow.
ParksNot Applicable, yet the small parks will be constructed near boundary wall
Tree PlantingAll season trees will be planted in the project. The trees will be minimum in numbers as required by Agra development Authority. The trees will be planted along the boundary wall.
Design For Electric Supply Including Street LightingThe project will have a separate transformer. The load sanction will be done by Torrent Power Limited. The load sanctioned will be distribute through distribution boxes to each unit and common areas. The street light will be installed at the minimum height of 4.5 m
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe state of art multi stage treatment plant will be installed to treat the sewage to the minimum permissible limit. The per unit residential sewage to the approximate quantity of 150KLD will be catered for by the sewage treatment plant
Solid Waste Management And Disposal SystemThe chutes and the dustbins will be constructed and installed in the project to keep the project clean
Water Conservation System100 mm bore going to the depth of minimum of 5 m having PVC perforated pipes will be placed under the ground and the inlet of 600x450 will multi stage filtration system will will installed to collect the rain runoff and recharge the ground water
Energy Management System Including Use of Renewable EnergyThe project does not require any specific energy management system. But all the green building techniques are being applied in the constructions and installations of the project. The Lights will be LED in all the common areas of the project.
Fire Protection And Fire Safety SystemThe fire system with Steve alarm system and wet risers will be installed in the project. The fire extinguishers will be installed and maintained on all floors . The norms put in place by fire department will all applied.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable.
Emergency Evacuation ServicesThe stairwell are of sufficient width as per the guidelines by fire department. In case of emergency the rise and head of stairs along with width will assist the residents to evacuate smoothly
Other Miscellaneous WorkAll the necessary improvements for the project will be catered for

Bank Details

Bank NameKotak Mahindra Bank
BranchSanjay Place, Agra
Branch AddressUnit No. 5-6, Freinds Center, Block 38/4B, Sanjay Place Agra-282002
Account HolderBibhab Buildwell Collection Account For Bibhab Grande 2
Account Number3347343571
IFSC CodeKKBK0005006

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy