DHANI ORCHID
VRINDA INFRATECH PRIVATE LIMITED
Agra, Uttar Pradesh
Approved
1st Sept 2022
Pending
27th Jan 2027
Registration No.
UPRERAPRJ369719
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ369719 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2022-09-01 |
| Completion Date | 2027-01-27 |
| Total Area (sqm) | 10073 |
| Project Cost (Lacs) | 2435 |
| Duration (Months) | 53 |
| Registration Fee | 55500 |
Promoter Details
| Promoter Name | VRINDA INFRATECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM190985 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Deshdeepak Singh |
| Contractor | Pramod |
| Structural Engineer | Banwari Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | Land at Minjumla Kh. No. 158, Mauja Lakhanpur, Agra | 1983 |
| Khasra | Land at Minjumla Khasra No. 161, Mauja Lakhanpur, Agra | 2090.25 |
| Khasra | Land at MinjumlaKh. No. 161, Mauja Lakahnpur, Agra | 5000 |
| Khasra | Land at Minjumla Kh. No. 161, Mauja Lakhanpur, Agra | 1000 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 83 | 21 | 119 |
| Villa | 88 | 1 | 119 |
| Villa | 138 | 1 | 260 |
| Plot | 83 | 15 | |
| Plot | 96 | 2 | |
| Plot | 75 | 1 | |
| Plot | 77 | 1 | |
| Plot | 72 | 1 | |
| Plot | 73 | 1 | |
| Plot | 82 | 1 | |
| Plot | 90 | 1 | |
| Plot | 102 | 1 | |
| Plot | 85 | 1 | |
| Plot | 91 | 1 | |
| Plot | 96 | 1 | |
| Plot | 101 | 1 | |
| Plot | 106 | 1 | |
| Plot | 111 | 1 | |
| Plot | 116 | 1 | |
| Plot | 147 | 1 | |
| Plot | 88 | 1 | |
| Plot | 132 | 1 | |
| Plot | 138 | 1 | |
| Plot | 13 | 1 | |
| Plot | 121 | 1 | |
| Plot | 115 | 1 | |
| Plot | 97 | 1 | |
| Plot | 130 | 1 | |
| Plot | 145 | 1 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The Plot demarcation will be done as per approved map by Agra Development Authority. The dimensions and orientations ill be done using latest survey methods. |
| Boundary Wall | Six to Eight feet high boundary wall will be constructed in brick-masonry. The wall will be plastered and painted . The wall be be 4 feet deep and designed to resist earthquake and climate stresses. |
| Road Work | 7.5m and 9m wide road will be constructed in the project. The wearing course will be supported by compacted earth, Compacted Granular layers as per prevailing provisions. |
| Footpaths | interlocking tiles will be placed over sand bed of 30-50 mm in the shoulder and park periphery. The M-30 grade interlocking tiles of 50mm will be placed. |
| Water Supply Including Drinking Water Facilities | Underground water through submersible pump will be pumped to overhead tank. Thereon the water will be supplied to individual units via PVC underground pipe line. |
| Sewer System | Underground Sewer system with man holes will be constructed to cater for the domestic sewer of the project. The sewer line will lead to STP |
| Drain | Lined covered/ open drain will be constructed of trapezoidal shape to ensure continuous flow of drain water. |
| Parks | The parks will be developed as per approved landscape plan. |
| Tree Planting | All weather trees will be planted in the project along the boundary wall and around the park. |
| Design For Electric Supply Including Street Lighting | Separate transformer will be erected in the project as per the approved design load by the electrical department. The street lights and the distribution boxes will be erected and the electrical supply will be provided to each unit in the project . |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | State-of -Art STP will be installed in the project to treated the domestic sewer and bring the effluents within in the permissible limits. The treated effluents will be disposed as per regulations of local body. |
| Solid Waste Management And Disposal System | A dalab Ghar will be constructed i the project. In addition the Dust-bins will be installed in the project for collection of waste and disposal of the same will be established |
| Water Conservation System | Rain water harvesting pit with multistage filter system will be installed. The perforated pipe will be inserted in to the ground. The surface and terrace run-offs will be collected at the collection chamber of the pit . The filtered water will then be transferred to ground |
| Energy Management System Including Use of Renewable Energy | Not Applicable, though all measures will be taken to conserve energy and non renewable resources |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per Project requirements |
Bank Details
| Bank Name | CANARA BANK |
| Branch | 1469- AGRA , KAMLA NAGAR |
| Branch Address | D-73, KAMLA NAGAR, AGRA 282005 |
| Account Holder | VRINDA INFRATECH PRIVATE LIMITED COLLECTION ACCOUNT FOR DHANI ORCHID |
| Account Number | 120014098293 |
| IFSC Code | CNRB0001469 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in