New Launch - India Real Estate Report 2026.

Dwarika Grande Apartment

Jai Shree Shyam Infratech

Agra, Uttar Pradesh

RERA approved

Approved

7th Feb 2023

Completion pending

Pending

6th Feb 2028

Registration No.

UPRERAPRJ313631

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ313631
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2023-02-07
Completion Date2028-02-06
Total Area (sqm)4429
Project Cost (Lacs)2500
Duration (Months)60
Registration Fee27500

Promoter Details

Promoter NameJai Shree Shyam Infratech
Promoter IDUPRERAPRM210058
Mobile98********

Project Team

rolename
ArchitectMr. Mukul Sharma
ContractorSelf
Structural EngineerMr. K.L. Bahadur

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra548,549,550/1,555,5564572

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
AGFOTHER000
A12 BHK188.1-
A12 BHK178.94-
A12 BHK181.81-
A12 BHK184.95-
A12 BHK182.76-
A12 BHK187.11-
A13 BHK1107.28-
A13 BHK1105.01-
A13 BHK1103.6-
A13 BHK1104.36-
A22 BHK188.1-
A22 BHK178.94-
A22 BHK181.81-
A22 BHK184.95-
A22 BHK182.76-
A22 BHK187.11-
A23 BHK1107.28-
A23 BHK1105.01-
A23 BHK1103.6-
A23 BHK1104.36-
A32 BHK188.1-
A32 BHK178.94-
A32 BHK181.81-
A32 BHK184.95-
A32 BHK182.76-
A32 BHK187.11-
A33 BHK1107.28-
A33 BHK1105.01-
A33 BHK1103.6-
A33 BHK1104.36-
A42 BHK188.1-
A42 BHK178.94-
A42 BHK181.81-
A42 BHK184.95-
A42 BHK182.76-
A42 BHK187.11-
A43 BHK1107.28-
A43 BHK1105.01-
A43 BHK1103.6-
A43 BHK1104.36-
A52 BHK188.1-
A52 BHK178.94-
A52 BHK181.81-
A52 BHK184.95-
A52 BHK182.76-
A52 BHK187.11-
A53 BHK1107.28-
A53 BHK1105.01-
A53 BHK1103.6-
A53 BHK1104.36-
A62 BHK188.1-
A62 BHK178.94-
A62 BHK181.81-
A62 BHK184.95-
A62 BHK182.76-
A62 BHK187.11-
A63 BHK1107.28-
A63 BHK1105.01-
A63 BHK1103.6-
A63 BHK1104.36-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of size 4429 sq. mtr.having 1 main entrance gate.
Boundary WallWe have a 2mtr High - 9 Inches Width boundry wall built of Brick Work With Grill around the project.
Road WorkFrom the main entrance gate we have 12 M wide approved internal thick Cement Concret Road through the project.
FootpathsWe have planned footpath along with road with Interlock Tiles.
Water Supply Including Drinking Water FacilitiesWe have PVC 3 inches Pipe line connected to overhead tank in the project.
Sewer System9 Inches Drain Connected to STP. Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Drain8 Inches Drain Connected to Rain Water Harvesting System. Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsN/A
Treatment and Disposal System of Sewage and Sullage water9 Inches Drain Connected to STP. Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergySolar Pannels System on Rooftop We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesStaircases with fire resistant doors are provided in building, Adequate fire extinguisher also provided.
Other Miscellaneous WorkN/A

Bank Details

Bank NameCanara Bank
BranchSME Branch
Branch AddressSanjay Palace, Agra
Account HolderJAI SHREE SHYAM INFRATECH RERA COLLECTION BANK ACCOUNT FOR DWARIKA GRANDE APARTMENT
Account Number120002885070
IFSC CodeCNRB0002376

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy