DWARIKA VATIKA
DWARIKA CONSTRUCTIONS
Agra, Uttar Pradesh
Approved
26th Dec 2024
Pending
25th Dec 2029
Registration No.
UPRERAPRJ959958/05/2025
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ959958/05/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2024-12-26 |
| Completion Date | 2029-12-25 |
| Total Area (sqm) | 10526 |
| Project Cost (Lacs) | 2117 |
| Duration (Months) | 60 |
| Registration Fee | 58000 |
Promoter Details
| Promoter Name | DWARIKA CONSTRUCTIONS |
| Promoter ID | UPRERAPRM298308 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | YESHVIR SINGH |
| Contractor | SELF |
| Structural Engineer | YAMANK KUMAR |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 6,7,8, MAUJA CHAMRAULI, AGRA | 10614.42 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 86 | 1 | 116 |
| Villa | 86 | 18 | 116 |
| Villa | 87 | 15 | 118 |
| Villa | 94 | 10 | 125 |
| Villa | 149 | 1 | 140 |
| Villa | 149 | 1 | 140 |
| Plot | 137 | 1 | |
| Plot | 143 | 1 | |
| Plot | 229 | 1 | |
| Plot | 286 | 1 | |
| Villa | 85 | 16 | 114 |
| Plot | 85 | 1 | |
| Plot | 100 | 2 | |
| Plot | 127 | 1 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The total project size is 10526.06 sq,m. The project has 70 units. All units , parks roads, project facilities will be reflected on ground as per approved size, dimensions and orientation. |
| Boundary Wall | The boundary wall of 6 to 8 feet height will be constructed in brick mortar. The foundation of boundary wall will 3 to 4 feet deep. The boundary wall will be plastered and painted. |
| Road Work | The road dimensions of the carriageway are 7.5m and 9 m wide. The surface course will be of paver blocks. The interlocking paver blocks of min. 80 mm depth will be laid over the sand bed. The subgrade and the granular base/subbase will be compacted to the required density and levels. |
| Footpaths | The footpaths will be provided on the periphery of the park. The Interlocking anti skid blocks will be laid. The minimum thickness will be 60 mm. |
| Water Supply Including Drinking Water Facilities | The ground water will be pumped and supplied to OHT. There on through gravity flow the water will be supplied through PVC pipes to each unit of the project. |
| Sewer System | Underground HDPE lines/ Concrete sewer lines will be laid in the slope of 1 to 2 percent. The manholes will be placed at interval of 30 -50 m for the inspection. The seer dia will vary from 6 to 10 inches as per location and discharge . |
| Drain | The trapezoidal drain with top with of 300 mm and bottom width of 150+ mm will be constructed in the project/The drain will be underground and covered with iron grills at specific locations. the slope will be 1 to 3 percent. The catch basins and inspections chambers will be constructed as per MEP design |
| Parks | The lush green par of 1054 sq,m will be developed in the project as per the landscape plan |
| Tree Planting | Tree plantation will be done along the project periphery and around the park. The all season plants/ trees that will be suitable for local soil will be selected. |
| Design For Electric Supply Including Street Lighting | The separate transformer will be installed for the project . The overhead lines through the electric poles of 4.5 m height will be used and all units will be supplied with electricity through distribution boxes. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | The STP will be installed in the project as per the design provided by MEP consultant. Normal z=size of 50cum/day. The sewage will be treated in stages of - removal of large debris - settlement of suspended solid from sludge- biological process - filtration and disinfection- dispense at specified location / sewer line. |
| Solid Waste Management And Disposal System | The dust bins / waste collection management will be installed in the project |
| Water Conservation System | The rain water harvesting pit and chamber will be constructed in the project to collect the storm water. The perforated pipe will be inserted up to the water table. The 2x2x3 meter collection chamber with multi stage filtration will be constructed . The percolation pit will have the system suitable to clean in off monsoon period. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per Project requirements |
Bank Details
| Bank Name | CANARA BANK |
| Branch | SANJAY PLACE, AGRA |
| Branch Address | G, BLOCK NO. 1, SANJAY PLACE, AGRA |
| Account Holder | DWARIKA CONSTRUCTIONS-DWARIKA VATIKA-COLLECTION ACCOUNT |
| Account Number | 120028915124 |
| IFSC Code | CNRB0002376 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in