New Launch - India Real Estate Report 2026.

DWARIKA VATIKA

DWARIKA CONSTRUCTIONS

Agra, Uttar Pradesh

RERA approved

Approved

26th Dec 2024

Completion pending

Pending

25th Dec 2029

Registration No.

UPRERAPRJ959958/05/2025

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ959958/05/2025
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2024-12-26
Completion Date2029-12-25
Total Area (sqm)10526
Project Cost (Lacs)2117
Duration (Months)60
Registration Fee58000

Promoter Details

Promoter NameDWARIKA CONSTRUCTIONS
Promoter IDUPRERAPRM298308
Mobile98********

Project Team

rolename
ArchitectYESHVIR SINGH
ContractorSELF
Structural EngineerYAMANK KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra6,7,8, MAUJA CHAMRAULI, AGRA10614.42

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa861116
Villa8618116
Villa8715118
Villa9410125
Villa1491140
Villa1491140
Plot1371
Plot1431
Plot2291
Plot2861
Villa8516114
Plot851
Plot1002
Plot1271

Development Works

work_namedescription
Demarcation of PlotsThe total project size is 10526.06 sq,m. The project has 70 units. All units , parks roads, project facilities will be reflected on ground as per approved size, dimensions and orientation.
Boundary WallThe boundary wall of 6 to 8 feet height will be constructed in brick mortar. The foundation of boundary wall will 3 to 4 feet deep. The boundary wall will be plastered and painted.
Road WorkThe road dimensions of the carriageway are 7.5m and 9 m wide. The surface course will be of paver blocks. The interlocking paver blocks of min. 80 mm depth will be laid over the sand bed. The subgrade and the granular base/subbase will be compacted to the required density and levels.
FootpathsThe footpaths will be provided on the periphery of the park. The Interlocking anti skid blocks will be laid. The minimum thickness will be 60 mm.
Water Supply Including Drinking Water FacilitiesThe ground water will be pumped and supplied to OHT. There on through gravity flow the water will be supplied through PVC pipes to each unit of the project.
Sewer SystemUnderground HDPE lines/ Concrete sewer lines will be laid in the slope of 1 to 2 percent. The manholes will be placed at interval of 30 -50 m for the inspection. The seer dia will vary from 6 to 10 inches as per location and discharge .
DrainThe trapezoidal drain with top with of 300 mm and bottom width of 150+ mm will be constructed in the project/The drain will be underground and covered with iron grills at specific locations. the slope will be 1 to 3 percent. The catch basins and inspections chambers will be constructed as per MEP design
ParksThe lush green par of 1054 sq,m will be developed in the project as per the landscape plan
Tree PlantingTree plantation will be done along the project periphery and around the park. The all season plants/ trees that will be suitable for local soil will be selected.
Design For Electric Supply Including Street LightingThe separate transformer will be installed for the project . The overhead lines through the electric poles of 4.5 m height will be used and all units will be supplied with electricity through distribution boxes.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe STP will be installed in the project as per the design provided by MEP consultant. Normal z=size of 50cum/day. The sewage will be treated in stages of - removal of large debris - settlement of suspended solid from sludge- biological process - filtration and disinfection- dispense at specified location / sewer line.
Solid Waste Management And Disposal SystemThe dust bins / waste collection management will be installed in the project
Water Conservation SystemThe rain water harvesting pit and chamber will be constructed in the project to collect the storm water. The perforated pipe will be inserted up to the water table. The 2x2x3 meter collection chamber with multi stage filtration will be constructed . The percolation pit will have the system suitable to clean in off monsoon period.
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAs per Project requirements

Bank Details

Bank NameCANARA BANK
BranchSANJAY PLACE, AGRA
Branch AddressG, BLOCK NO. 1, SANJAY PLACE, AGRA
Account HolderDWARIKA CONSTRUCTIONS-DWARIKA VATIKA-COLLECTION ACCOUNT
Account Number120028915124
IFSC CodeCNRB0002376

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy