DWARKESH GRAND
KRISHNA BUILDZONE LLP
Agra, Uttar Pradesh
Approved
1st Oct 2022
Pending
21st Dec 2026
Registration No.
UPRERAPRJ888112
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ888112 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2022-10-01 |
| Completion Date | 2026-12-21 |
| Total Area (sqm) | 32099 |
| Project Cost (Lacs) | 7047 |
| Duration (Months) | 51 |
| Registration Fee | 165500 |
Promoter Details
| Promoter Name | KRISHNA BUILDZONE LLP |
| Promoter ID | UPRERAPRM212731 |
| Mobile | 96******** |
Project Team
| role | name |
|---|---|
| Architect | Yashweer Singh |
| Contractor | Heera Singh |
| Structural Engineer | Yamank Kumar |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1612 | 32099 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) |
|---|---|---|---|---|
| TYPE A | GF | 3 BHK | 22 | 75.72 |
| TYPE A | 1 | 3 BHK | 22 | 75.72 |
| TYPE A | 2 | 3 BHK | 22 | 75.72 |
| TYPE A | 3 | 3 BHK | 22 | 75.72 |
| TYPE B | GF | 2 BHK | 13 | 60.11 |
| TYPE B | 1 | 2 BHK | 13 | 60.11 |
| TYPE B | 2 | 2 BHK | 13 | 60.11 |
| TYPE B | 3 | 2 BHK | 13 | 60.11 |
| TYPE C | GF | 4 BHK | 1 | 101.57 |
| TYPE C | 1 | 4 BHK | 1 | 101.57 |
| TYPE C | 2 | 4 BHK | 1 | 101.57 |
| TYPE C | 3 | 4 BHK | 1 | 101.57 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Total plot area of 32099 sq m. (latitude and longitude of the endpoints- 27.10620, 78.14766, proposed housing layout plan of Dwarkesh city located at khasra no. 1612, village Kundol, Agra, Uttar Pradesh. |
| Boundary Wall | Boundary wall up to 2.43 meter. height on the four sides of the plot shall be provided with 230 mm high brick and plaster wall. |
| Road Work | All roads in the housing will be in combination with concrete pavers of 2 colors black and white. Roads will be laid over 225 mm water-bound macadam. |
| Footpaths | Footpaths will be of all-black interlocking pavers. |
| Water Supply Including Drinking Water Facilities | Water is to be provided on campus. There will be an overhead water tank constructed on site. The supply of water to individual flats shall be from the said overhead water tanks. Every unit will have its water tank. Every unit will have its independent water tanks on the terrace. |
| Sewer System | The main sewer line has been designed as per norms and partially lay on the roadside. The sewer will be collected through a soil pipeline arrangement, and bends and inspection chambers leading to the stage water treatment plant (STP) of the Project. The pipe size is 300 mm dia. |
| Drain | An underground system using the uPVC (SN-4) and masonry chambers sewer pipes. Rainwater shall be collected in drains having a minimum width of 150mm connected to the underground cement concrete pipeline. |
| Parks | A lush green big park (Total area- 5265.14 sq. mtr. )will be provided and maintained. The parks will have jogging tracks, a gazebo, an open gym, a childrens play area, and a sitting area. |
| Tree Planting | The tree planting has been designed by as per authority guidelines/ approved drawings. The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/usage of the Project. 250 no. of trees shall be planted. |
| Design For Electric Supply Including Street Lighting | The design has been done as per UP electricity board guidelines and shall be provided necessary switch gear etc. for distributing the electricity at LT voltage. Electricity supply will be from Dakshinanchal Electricity Board. |
| Community Buildings | The clubhouse has been designed and has different facilities like- Party hall, gaming zone, swimming pool, entertainment area, gym, library, etc. shall be provided. |
| Treatment and Disposal System of Sewage and Sullage water | 250 KLD STP as per norms shall be provided. |
| Solid Waste Management And Disposal System | Solid waste is to be collected from individual units and stored in the garbage room. All organic waste shall be transferred to the nearby solid waste management department. |
| Water Conservation System | Rainwater system to be provided through 3 no. of rainwater harvesting pits of size 200 KHL each. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Facilities of STP, clubhouse, retail shops, commercial complex, and office spaces shall be sold. |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | Not Applicable |
Bank Details
| Bank Name | State Bank of India |
| Branch | 15446 Sanjay Place, Agra |
| Branch Address | Sanjay Place, Agra |
| Account Holder | KRISHNA BUILDZONE LLP- COLLECTION ACCOUNT FOR DWARKESH GRAND |
| Account Number | 41535331881 |
| IFSC Code | SBIN0015446 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





