Ganpati Smart City - Samriddhi Comfort Homes

GANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED

Agra, Uttar Pradesh

RERA approved

Approved

13th May 2024

Completion pending

Pending

24th Oct 2026

Registration No.

UPRERAPRJ400642/09/2024

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ400642/09/2024
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2024-05-13
Completion Date2026-10-24
Total Area (sqm)22493
Project Cost (Lacs)4545
Duration (Months)30
Registration Fee22000

Promoter Details

Promoter NameGANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
Promoter IDUPRERAPRM2735
Mobile98********

Project Team

rolename
ArchitectTapan Kumar
ContractorMaa Pitambara Infratech
Structural EngineerSANTOSH KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1/4, 1/5, 1/13, 20 to 25, 26/2, 42 to 53, 56, 8, 929948

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Narmada Tower -1GF3 BHK872.20
Narmada Tower -113 BHK872.2-
Narmada Tower -123 BHK872.2-
Narmada Tower -143 BHK872.2-
Narmada Tower -153 BHK872.2-
Narmada Tower -163 BHK872.2-
Narmada Tower -133 BHK872.2-
Kaveri Tower - 1GF2 BHK1854.800
Kaveri Tower - 112 BHK1854.80-
Kaveri Tower - 122 BHK1854.80-
Kaveri Tower - 132 BHK1854.80-
Kaveri Tower - 142 BHK1854.80-
Kaveri Tower - 152 BHK1854.80-
Kaveri Tower - 162 BHK1854.80-
Kaveri Tower - 172 BHK1854.80-
Kaveri Tower - 182 BHK1854.80-
Kaveri Tower - 192 BHK1854.80-
Gomti Tower - 112 BHK1840.24-
Gomti Tower - 122 BHK1840.24-
Gomti Tower - 132 BHK1840.24-
Gomti Tower - 142 BHK1840.24-
Gomti Tower - 152 BHK1840.24-
Gomti Tower - 162 BHK1840.24-
Gomti Tower - 172 BHK1840.24-
Gomti Tower - 182 BHK1840.24-
Gomti Tower - 192 BHK1840.24-
Gomti Tower -1GF2 BHK1440.240

Development Works

work_namedescription
Demarcation of PlotsAs per the approved sanctioned plan. This is a single plot having a total of 1no.of the entry gate and 1no. of the exit gate from the 60-foot wide road and 45 foot internal road.
Boundary Wall2-meter height and 180 mm thick boundary wall designed or with MS railing as created by the designer. Brock work of 9 inches and RCC work in column and beam may be used. The Entrance and exit gate are already constructed at the site of the MS steel structure.
Road WorkThe approach road to the project and the inner road connecting the towers and projects have already been completed with RCC and cement block with a 60-foot wide road.
FootpathsAll footpaths are completed with well-designed and constructed RCC and cemented blocks with 20-foot footpaths.
Water Supply Including Drinking Water FacilitiesA bore well will supply drinking water, and the bore well will manage the water supply for the rest of the service.
Sewer SystemA centralized sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment, water shall be recycled and used in gardening flush tanks—vehicle washing. Whenever overflow from the STP is connected to the municipal sewerage system,
DrainA drain water system shall be provided. Strom water from the road and other landscape areas shall be connected to the stormwater drain channel and recharged in the rainwater harvesting pit. Groundwater and overflow shall be associated with the municipal drain line.
ParksAll parks have been constructed with the best landscaping and greenery and look beautiful.
Tree PlantingTree plantation has been completed at the site as per designed by the landscaping architect.
Design For Electric Supply Including Street LightingAll street light poles are installed at the site. Street poles cover the whole site. The electricity supply at the site started, and the supply of electric poles began.
Community BuildingsThe clubhouse was developed at the site with all amenities i.e. swimming pool, gym, kids playroom games room, etc.
Treatment and Disposal System of Sewage and Sullage waterSTP was constructed at the site and running smoothly with 550 KLD
Solid Waste Management And Disposal SystemDalab Ghar will be constructed at the site.
Water Conservation SystemA rainwater harvesting system will be installed at the site.
Energy Management System Including Use of Renewable EnergyNot to be provided.
Fire Protection And Fire Safety SystemThe fire plan is clearly marked and indicates the complete fire protection arrangement at the site and the means of access/escape for the proposed building with suitable legend along with standard signs and symbols on the drawing.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot to be provided.
Emergency Evacuation ServicesA fire staircase with fire-resistant doors is provided in each building. A dedicated assembly area is also defined on the campus. Also, adequate signage shall be provided.
Other Miscellaneous WorkTemple, Fountain, etc.

Bank Details

Bank NameSBI
BranchAGRA BRANCH
Branch AddressSME IND. ESTATE NUNHAI BRANCH
Account HolderGANPATI INFRASTRUCTURE DEVELOPMENT CO LTD - SMART CITY SAMRIDDHI COMFORT HOMES COLLECTION A/C
Account Number43176348527
IFSC CodeSBIN0001126

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy