New Launch - India Real Estate Report 2026.

KAVERI SWARNIM

KAVERI HOUSING LLP

Agra, Uttar Pradesh

RERA approved

Approved

1st Apr 2025

Completion pending

Pending

4th Mar 2031

Registration No.

UPRERAPRJ675938/06/2025

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ675938/06/2025
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2025-04-01
Completion Date2031-03-04
Total Area (sqm)6738
Project Cost (Lacs)5086
Duration (Months)72
Registration Fee39000

Promoter Details

Promoter NameKAVERI HOUSING LLP
Promoter IDUPRERAPRM357638
Mobile98********

Project Team

rolename
ArchitectTAPAN KUMAR
ContractorKAVERI HOUSING LLP
Structural EngineerVISHAL MALIK

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra195(p), 1969(p), Mauja Karketha, Agra1040.52
KhasraKh. No. 197 , Mauja Karketha, Agra508.35
KhasraKh. No. 198, Mauja Karketa, Agra5190

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
KAVERIBSMNTOTHER00-
KAVERIBSMNT2OTHER00-
KAVERIBSMNT3OTHER00-
KAVERIGFOTHER000
KAVERI13 BHK3175.97-
KAVERI14 BHK3233.53-
KAVERI14 BHK1224.02-
KAVERI23 BHK3175.97-
KAVERI24 BHK3233.53-
KAVERI24 BHK1224.02-
KAVERI33 BHK3175.97-
KAVERI34 BHK3233.53-
KAVERI34 BHK1224.02-
KAVERI43 BHK3175.97-
KAVERI44 BHK3233.53-
KAVERI44 BHK1224.02-
KAVERI53 BHK3175.97-
KAVERI54 BHK3233.53-
KAVERI54 BHK1224.02-
KAVERI63 BHK3175.97-
KAVERI64 BHK3233.53-
KAVERI64 BHK1224.02-
KAVERI73 BHK3175.97-
KAVERI74 BHK3233.53-
KAVERI74 BHK1224.02-
KAVERI83 BHK3175.95-
KAVERI84 BHK3233.53-
KAVERI84 BHK1224.02-
KAVERI93 BHK3175.97-
KAVERI94 BHK3233.53-
KAVERI94 BHK1224.02-
KAVERI103 BHK2175.97-
KAVERI104 BHK2233.53-
KAVERI104 BHK1224.02-
KAVERI104 BHK1345.1-
KAVERI114 BHK2344.55-
KAVERI114 BHK1350.55-

Development Works

work_namedescription
Demarcation of PlotsThe project land will be demarcated on ground with boundary wall. The setbacks from the boundary to the building line will be maintained as per the by laws and the approvals from the sanctioning authority
Boundary WallAn 6 to 8 feet high boundary wall will be constructed for the project periphery. The foundation of the wall will be 3 to 4 feet deep and will the earth quake resistant. The wall will be constructed in brickwork or concrete. The boundary wall will be painted with all weather paint.
Road WorkThe peripheral road of the project will be constructed in cement concrete. The depth of PQC layer will be as per the design and minimum of 200 mm thick. The concrete will be laid over DLC/ compacted granular layer of minimum 150mm thickness. The subgrade will be compacted to the required density.
FootpathsThe footpaths will be constructed with 60-80 mm thick paver blocks. The interlocking paver blocks will be laid over the sand bed and the compacted subgrade.
Water Supply Including Drinking Water FacilitiesThe ground water will be supplied through an submersible set up to the underground/ terrace tanks. The water will be supplied through 2 inch PVC pipes.
Sewer SystemThe sewer system will be installed leading to the STP. The 100 to 150 mm dia soil pipes with the required bends will be fixed in the bulding. The sewer will be collected in the manholes at the ground level. The 300 mm dia pipes connected to the man hole chambers will lead the sewer to STP
DrainThe surface and subsurface drainage arrangement including the terrace drain will be onstructed in the project. The slpes of rectangular/ trapezoidal drains will be as per the plubming and drainage design.
Parks1 number of park will be developed in the project as per the landscape plan. The facilities for elderly and children will be provided in the park
Tree PlantingTrees that suit the local soil will be planted in the project along the boundary wall and the periphery of the park.
Design For Electric Supply Including Street LightingSeparate transformer will be installed as per UPSEB norms. The electricity connection and the distribution boxes will be installed for each unit and common areas of the project.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe multi stage filtration system will be installed in the project. The size will be as per the sewer load and treatment design by the designer. The selected sewate treatement plant will treat the sewer to the required and permitted levels before disposal
Solid Waste Management And Disposal SystemThe Garbage Chutes/ Dustbins will be placed on each floor.
Water Conservation SystemRain water harevesting pit will be constructed in the project. The perforated 150mm dia will be insrted to the water table. The rain water will be collected in the multistage filtreation chamber. The treated clean water will move to the ground
Energy Management System Including Use of Renewable EnergyNot Appliable, but the project will adopt the green technologies.
Fire Protection And Fire Safety SystemThe wet riser system along with dedicated water tank for fire fighting will be installed for the project. The fire extingushers will also be placed at all required locations as per fire deprtment norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSwimming pool will be constructed in the project
Emergency Evacuation ServicesThe stairs will be designed as per the fire department norms with clear signage installed in the building to assist the egress of residents in case of fire.
Other Miscellaneous WorkAs per the requirements of project.

Bank Details

Bank NameYES BANK
BranchAGRA, UTTAR PRADESH
Branch AddressGROUND AND FIRST FLOOR 116/18, SANJAY PLACE AGRA 282002
Account HolderKAVERI HOUSING LLP - KAVERI SWARNI- COLLECTION A/C
Account Number005072500000043
IFSC CodeYESB0000050

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy