KRISHNA ROYALE

Nipun Infradevelopers Private Limited

Agra, Uttar Pradesh

RERA approved

Approved

30th Jul 2021

Completion pending

Pending

28th Jul 2026

Registration No.

UPRERAPRJ716434

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ716434
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2021-07-30
Completion Date2026-07-28
Total Area (sqm)7650
Project Cost (Lacs)610
Duration (Months)60
Registration Fee43500

Promoter Details

Promoter NameNipun Infradevelopers Private Limited
Promoter IDUPRERAPRM152314
Mobile98********

Project Team

rolename
ArchitectBanwari Singh
ContractorSelf
Structural EngineerBanwari Singh

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. 18 on Kh. No. 141167.22
PlotPlot No. 19 on Kh. No. 141167.22
PlotPlot No. 20 on Kh. No. 141167.22
PlotPlot No. 22 on Kh. No. 141167.22
PlotPlot No. 23 on Kh. No. 141167.22
PlotPlot No. 24 on Kh. No. 141167.22
PlotPlot No. 27 on Kh.No. 141209.02
PlotPlot No. 29 on Kh. No. 141167.22
PlotPlot No. 33-34 on Kh.No. 141390.18
PlotPlot No. 141 on Kh. No. 1414668.78
PlotPlot No. 11 on Kh. No. 141209.02
PlotPlot No. 5 on Kh. No. 141167.22
PlotPlot No. 9 on Kh. No. 141167.22
PlotPlot No. 10 Kh. No. 141167.22
PlotPlot No. 14 on Kh.No. 141167.22
PlotPlot No.17 on Kh. No. 141167.22
PlotPlot No. 21 on Khasra No. 141167.22

Development Works

work_namedescription
Demarcation of PlotsThe Plots will be demarcated as per the approved plan. The exact dimension and orientation will maintained using the state of art measuring instruments.
Boundary WallSix to Eight Feet high boundary wall will be constructed at the required location. The boundary wall will be of bricks with cement mortar plastered and painted. The Foundation will be 4 to 5 feet deep and the wall will be earthquake resistant.
Road WorkFlexible pavement will be constructed with compacted Subgrade, Compacted Sub-base, Compacted Base and the wearing course. The layers will be well compacted and the surface course will provide smooth riding and anti skid surface.
FootpathsThe paver blocks will be laid over the layer of sand base. The interlocking tiles will be of M-20 Grade providing the rough surface for smooth walks. The Footpaths will be along the sections of road and periphery of park.
Water Supply Including Drinking Water FacilitiesGround water will be pumped through a submersible pump to 30Kl Over head tank. There on the PVC underground pipes will be laid to each plot. The potable/ drinking water will be supplied for the domestic and garden purpose of the project.
Sewer System600mm diameter hume-pipes will be laid maintaining the correct slopes towards the sewage treatment plant . The inspection chambers will be installed for future maintenance. The Dimensions of pipes are as per design to cater for the domestic sewer .
DrainLined open drains will be constructed. The section of 45oX45o will be maintained in a notch shape to maintain the flow and rapid discharge of rain water and domestic waste water. The CD will be installed at the desired location for the single discharge point.
ParksA lush green park with kids playing area and walking area will be constructed .
Tree PlantingVariety of trees will be planted along the boundary wall and the periphery of the park. The plants will be selected as to maintain the beauty of the project and having long life.
Design For Electric Supply Including Street LightingThe Separate transformer will be installed for the project . The load will be designed by the electrical department . The connection will be given to each plot through distribution boxes and the electrical poles .
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterA multi stage Sewage treatment plant will be installed in the designated project area . The domestic sewage will be treated and the effluents will be brought down to the permissible limits . The Disposal will be done to the designated space till the time the municipal sewer lines are not installed by the municipal corporation
Solid Waste Management And Disposal SystemA dalab Ghar will be made in the project to the measure of 54 square meter as approved by the Agra Development Authority. In addition the Dustbins will be placed at common areas to keep the project neat and clean. The waste collection will be s per the corporation laws.
Water Conservation SystemA rain water harvesting pit will be installed to recharge the water table. The series of filtration layers will be placed to help reducing the toxic leachates , if any . The perforated pipe will be taken to the depth of min. 10 m. The collection pit will have the maintenance chamber
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAs per the project needs for the betterment of project.

Bank Details

Bank NameCANARA BANK
BranchSME, Sanjay Place, Agra
Branch AddressG-Block No. 1, Sanjay Place Agra- 282001
Account HolderNipun Infradevelopers Pvt. Ltd. Collection Account For Krishna Royale
Account Number120000294682
IFSC CodeCNRB0002376

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy