KRISHNA VALLEY

KRISHNA BHU VIKAS LLP

Agra, Uttar Pradesh

RERA approved

Approved

1st Jul 2020

Project completed

Completed

31st Mar 2025

Registration No.

UPRERAPRJ511164

Project Type

Residential

District

Agra

Taluka

Agra

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ511164
Project StatusCompleted
Project CategoryResidential
DistrictAgra
TalukaAgra
Start Date2020-07-01
Completion Date2025-03-31
Total Area (sqm)11900
Project Cost (Lacs)1789
Duration (Months)57
Registration Fee64500

Promoter Details

Promoter NameKRISHNA BHU VIKAS LLP
Promoter IDUPRERAPRM117096
Mobile93********

Project Team

rolename
ArchitectA.K.UPADHYAY
ContractorSELF
Structural EngineerA.K.UPADHYAY

Land Details

typekhasra_or_plot_noarea_sqmt
PlotSouth Part of Plot No. R-6, Sector-D, Shastripuram, Agra11200
PlotNorth Part of Plot No. R-6, Sector-D, Shastripuram, Agra700

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Plot1002
Plot812
Plot911
Villa9125130
Villa828118
Plot8214
Plot966
Villa9614140

Development Works

work_namedescription
Demarcation of PlotsPlots will be demarcated and leveled as per layout plan approved by Agra Development Authority with state-of-art survey equipments. The Project Land will be demarcated by Boundary Walls.
Boundary WallA 6 to 8 feet high compound wall, wind / Earthquake resistant
Road WorkFlexible Pavement will be constructed on the approved road plan of colony. The bituminous road will be constructed over a well compacted sub-grade and granular layer/s.
Footpaths4" Paver blocks will be laid over the walking areas, along side park and other
Water Supply Including Drinking Water FacilitiesGround Water is pumped to common Tank. The water thereon is supplied to terrace tanks of villas and the connection up to the front of plots, through PVC pipes of ISI Mark. The Supply of water will be for domestic use only
Sewer SystemUnder Ground Sewer lines ( Hume Pipes) will be laid across the project as per approved sewer layout. The sewer is designed to assist smooth exit through proper slopes and alignment, and cater for the domestic use of all the Plots/Villas of Project. The sewer line from the project is then connected to the Local Authorities main sewer line. Inspection chambers will be installed at suitable distance.
DrainLined, covered/open drain, and cross drains ,with drain covers resistant to traffic and weather. A, B and U type Drains.
Parks2 lush green parks with play area for kids. With Tree Plantation along the park boundaries. The parks landscape and location will be as per approved map.
Tree PlantingTree Plantation will be done along the park boundary, project boundary and other suitable locations. The long lasting breeds of Plants will be planted to add shade and beauty in the project compound
Design For Electric Supply Including Street LightingThe electric load design will be as per the authorities prevailing norms to cater for the projects demand. Aesthetically appealing street lights of sufficient height and lumens will be installed to cater for all the common zones of project requiring light.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterNot Applicable
Solid Waste Management And Disposal SystemDalab Ghar will be constructed. In addition the Dustbins will be placed at all suitable location, for discharge to the collection vehicle of local body
Water Conservation SystemStorm water drain shall be Provided. Storm water from Roof,Roads and other impermeable areas shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit to recharge the Ground water and overflow shall be connect with authorities drain line
Energy Management System Including Use of Renewable EnergyAll the necessary arrangements will be done to ensure " Reduce-Reuse-Recycle" . Low flow taps and Low consumption electric units will be installed .
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAll Necessary and Miscellaneous arrangements will be made at site w.r.t to project requirement

Bank Details

Bank NameIndustrial Development Bank of India
BranchSanjay Place
Branch AddressHall No H2 Ground Floor Padamdeep Tower G 10/8 Sanjay Place, Agra
Account HolderKRISHNA BHU VIKAS LLP
Account Number0080102000052465
IFSC CodeIBKL0000080

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy