Mangal Padam Street
Indraprastha Builders & Developers
Agra, Uttar Pradesh
Approved
21st Nov 2023
Pending
20th Nov 2028
Registration No.
UPRERAPRJ402944/04/2024
Project Type
Commercial
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ402944/04/2024 |
| Project Status | New |
| Project Category | Commercial |
| District | Agra |
| Taluka | Agra |
| Start Date | 2023-11-21 |
| Completion Date | 2028-11-20 |
| Total Area (sqm) | 1677 |
| Project Cost (Lacs) | 724 |
| Duration (Months) | 60 |
| Registration Fee | 27000 |
Promoter Details
| Promoter Name | Indraprastha Builders & Developers |
| Promoter ID | UPRERAPRM266309 |
| Mobile | 96******** |
Project Team
| role | name |
|---|---|
| Architect | Ar. Kwanit Sharma |
| Contractor | Chandra Pal |
| Structural Engineer | Mukul Sharma |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 211 | 2000 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | GF | SHOP | 13 | 12.04 | 0 |
| 1 | GF | SHOP | 1 | 15.33 | 0 |
| 1 | GF | SHOP | 1 | 11.34 | 0 |
| 1 | GF | SHOP | 6 | 22.34 | 0 |
| 1 | GF | SHOP | 1 | 32.68 | 0 |
| 1 | GF | SHOP | 1 | 22.27 | 0 |
| 1 | GF | SHOP | 2 | 18.86 | 0 |
| 1 | GF | SHOP | 2 | 19.38 | 0 |
| 1 | GF | SHOP | 1 | 21.36 | 0 |
| 1 | GF | SHOP | 1 | 21.42 | 0 |
| 1 | GF | SHOP | 1 | 20.74 | 0 |
| 1 | GF | OTHER | 3 | 10.2 | 0 |
| 1 | GF | OTHER | 1 | 10.17 | 0 |
| 1 | GF | OTHER | 3 | 11.83 | 0 |
| 1 | GF | OTHER | 1 | 26.72 | 0 |
| 1 | 1 | SHOP | 13 | 12.04 | - |
| 1 | 1 | SHOP | 1 | 15.33 | - |
| 1 | 1 | SHOP | 1 | 11.34 | - |
| 1 | 1 | SHOP | 1 | 21.36 | - |
| 1 | 1 | SHOP | 1 | 21.42 | - |
| 1 | 1 | SHOP | 2 | 20.74 | - |
| 1 | 1 | SHOP | 3 | 19.38 | - |
| 1 | 1 | SHOP | 1 | 17.93 | - |
| 1 | 1 | SHOP | 1 | 19.79 | - |
| 1 | 1 | SHOP | 2 | 19.38 | - |
| 1 | 1 | SHOP | 1 | 29.48 | - |
| 1 | 1 | SHOP | 1 | 52.62 | - |
| 1 | 1 | SHOP | 1 | 27.85 | - |
| 1 | 1 | SHOP | 1 | 27.76 | - |
| 1 | 1 | SHOP | 2 | 17.10 | - |
| 1 | 2 | SHOP | 2 | 20.74 | - |
| 1 | 2 | SHOP | 2 | 17.10 | - |
| 1 | 2 | SHOP | 3 | 19.38 | - |
| 1 | 2 | SHOP | 2 | 19.38 | - |
| 1 | 2 | OTHER | 1 | 96.21 | - |
| 1 | 2 | OTHER | 1 | 100.89 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have one plot of size 1677 sq. mtr.having 1 main entrance gate from the 40m wide front road. |
| Boundary Wall | 3.33 m high and 225 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall. |
| Road Work | From the main entrance gate we have thick interlocking brick /RCC road through out the project whose wideness starts from 30m. |
| Footpaths | NA |
| Water Supply Including Drinking Water Facilities | We will provide pipe line connected to overhead tank in the project for water supply. |
| Sewer System | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | NA |
| Tree Planting | There are different type of tree plantation proposed at site in order to maintain greenery and natural view. |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | A well designed rain water harvesting system shall be provided to conserve water. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area and we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | Fire protection will be provided as per Bye-laws and Guidelines of Fire Department. Fire water storage tank and fire system will be provided. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | We will have staircases which will be provided with emergency exit doors. |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | CANARA BANK |
| Branch | SOORSADAN |
| Branch Address | SOORSADAN, AGRA |
| Account Holder | INDRAPRASTHA BUILDERS AND DEVELOPERS COLLECTION ACCOUNT FOR MANGAL PADAM STREET |
| Account Number | 120026838377 |
| IFSC Code | CNRB0002376 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate