New Launch - India Real Estate Report 2026.

NAARAYAN AVENUE

RJ INFRA HOMES PRIVATE LIMITED

Agra, Uttar Pradesh

RERA approved

Approved

1st Jul 2022

Completion pending

Pending

31st Mar 2027

Registration No.

UPRERAPRJ497764

Project Type

Residential

District

Agra

Taluka

Select

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ497764
Project StatusNew
Project CategoryResidential
DistrictAgra
TalukaSelect
Start Date2022-07-01
Completion Date2027-03-31
Total Area (sqm)16841
Project Cost (Lacs)3754
Duration (Months)57
Registration Fee89500

Promoter Details

Promoter NameRJ INFRA HOMES PRIVATE LIMITED
Promoter IDUPRERAPRM166687
Mobile90********

Project Team

rolename
ArchitectPushpendra Singh
ContractorSelf
Structural EngineerUsha Verma

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra30(m)18483

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Plot671
Plot6226
Plot581
Plot971
Plot7611
Plot754
Plot742
Plot732
Plot9923
Plot8323
Plot841
Plot653
Plot711
Plot981
Plot901
Plot931
Plot805
Plot632
Plot381
Villa622107
Villa83255

Development Works

work_namedescription
Demarcation of PlotsAll the plots will be demarcated as per the approved layout as per the orientation and direction. The size and alignment of the plots will be measured by the state of art equipment.
Boundary WallA 6 to 8 feet high brick wall will be constructed along the applicable boundary of he project. The wall will be cemented through brick and mortar. The will will be plastered and painted. The foundation of the wall and the wind cracks will be provided to make the wall weather and earthquake resistant.
Road WorkThe road works will be done with suitable wearing course of bituminous layer and paver blocks. The top and wearing course will be laid over compacted earth and granular layer providing the anti skid surface to cater for the the projects traffic. The roads are 9m and 7.5 m wide covering total of 6448sq.m
FootpathsThe paver blocks will be laid over the compacted earth and the sand bed along all the suitable areas and the periphery of the parks. The M-15 grade blocks will cater for the walking . 1m wide approx 2000sq.m
Water Supply Including Drinking Water FacilitiesThe ground water will be pumped to the overhead tank. The potable water will be supplied through underground pipelines to the individual units for the purpose of domestic use. The submersible pump will be installed with back up to provide the continuous supply of water as per demand. The capacity of water tank is 100000 ltr.
Sewer Systemthe underground sewer line will be constructed to cater for domestic sewer through the man holes and inspection chambers. The sewer lie will be sloped and designed to assure continuous discharge of sewer to the Sewage treatment plant
Drainthe Lined and covered drains will be constructed will be constructed to cater for the rainwater and domestic waste. the drains will be designed for the smooth and rapid egress of the drain water
ParksThe ltwo ush green parks will be prepared enhancing the greenery and the beauty of the project. The parks will be as per the suitable landscape providing the play area for kids and sitting areas for the elderly. The total area under parks is 2532sq,m approximately/
Tree PlantingThe variety of the trees will be planted to provide the greenery and the shade within the project. The trees planted will have long life and all weather suitability. the trees will be planted along the park periphery and the boundary wall at suitable locations
Design For Electric Supply Including Street LightingThe dedicated transformer will be installed for the projects domestic needs. The electric current will be distributed through distribution boxes and electrical poles. All the units will be provided with connection points for the domestic usage of electricity
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe state of art sewage treatment plant will be constructed for the the project to cater the domestic sewage. the sewage will be treated through multiple stages to bring the effluents within permissible limits before being disposed to the designated municipal corporation area or sewer line. The STP will be of 100KLD
Solid Waste Management And Disposal SystemA dalab ghar will be constructed for the solid waste management. The dustbins will also be installed at all required location to assist the collection of solid waste and the easy disposal of the same. The dalab ghar is approximately 33sqm
Water Conservation SystemA minimum 10m deep bore will be constructed using the perforated pipes and the collection chamber having the multilayer filtration to help recharge the the water table. There will two harvesting pits one of 150KLH and one of 100KLH.
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAll the necessary works will be done for the betterment of the project

Bank Details

Bank NameCanara Bank
BranchSME Branch, Agra
Branch AddressKamla Nagar, Agra
Account HolderRJ Infra Homes Collection Account for Naarayan Avenue
Account Number120001160145
IFSC CodeCNRB0018815

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy