RAJDARBAR SPACES PHASE-3
Rajdarbar Ayurveda Private Limited
Agra, Uttar Pradesh
Approved
1st Dec 2023
Pending
22nd Apr 2028
Registration No.
UPRERAPRJ895548/02/2024
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ895548/02/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2023-12-01 |
| Completion Date | 2028-04-22 |
| Total Area (sqm) | 32811 |
| Project Cost (Lacs) | 3418 |
| Duration (Months) | 53 |
| Registration Fee | 169500 |
Promoter Details
| Promoter Name | Rajdarbar Ayurveda Private Limited |
| Promoter ID | UPRERAPRM248271 |
| Mobile | 70******** |
Project Team
| role | name |
|---|---|
| Architect | Ramvir Singh |
| Contractor | Jai Shree Shyam Contractor |
| Structural Engineer | Daya Shankar Sharma |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 83 part, Mauja Chauhtana | 23050 |
| Khasra | 89 part, Mauja Chauhtana | 11525 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 99 | 10 | 99 |
| Plot | 99 | 93 | |
| Plot | 122 | 4 | |
| Plot | 99 | 1 | |
| Plot | 80 | 2 | |
| Plot | 100 | 1 | |
| Plot | 135 | 4 | |
| Plot | 128 | 1 | |
| Plot | 130 | 1 | |
| Plot | 133 | 1 | |
| Plot | 136 | 1 | |
| Plot | 140 | 1 | |
| Plot | 137 | 1 | |
| Plot | 107 | 4 | |
| Plot | 91 | 26 | |
| Plot | 91 | 1 | |
| Plot | 108 | 1 | |
| Plot | 139 | 2 | |
| Plot | 92 | 1 | |
| Plot | 109 | 4 | |
| Plot | 91 | 1 | |
| Plot | 125 | 1 | |
| Plot | 413 | 1 | |
| Plot | 291 | 1 | |
| Plot | 290 | 1 | |
| Plot | 292 | 1 | |
| Plot | 291 | 1 | |
| Plot | 22 | 1 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | All the plots and project land as a whole will be demarcated as per the approved layout. The dimensions and orientations of plots , roads parks will be as per approved layout. |
| Boundary Wall | The 6 to 8 feet high boundary wall. The brick-mortar wall will be erected at project periphery and will be plastered and painted with all weather paint. |
| Road Work | The project roads will be 7.5 m and 9.0 m wide as a carriageway. The construction will be done as per the provisions and specifications. |
| Footpaths | The interlocking tiles will be placed for walkways and footpaths. The interlocking paver blocks will be placed over a compacted base and a bed of sand |
| Water Supply Including Drinking Water Facilities | The ground water will be pumped to the overhead tank and will be supplied to each unit through underground pipe system. The system will be designed for flow under gravity and will be installed with the provisions for inspection |
| Sewer System | The soil pipe underground system will be installed. The 300mm dia pipe will be connected through bends and inspection chambers . Te sewer will be collected from each unit and will be lead to STP. |
| Drain | The Covered and open drains will be constructed in trapezoidal shape with top with of 300mm appx to collect the waste water. |
| Parks | All the parks as per layout and landscape plan will be developed into a lush green piece of land. The park will have the walking and sitting areas along with amenities for kids. |
| Tree Planting | The trees will be planted at all suitable locations of the project . The trees will be selected in consultation with horticulture expert . |
| Design For Electric Supply Including Street Lighting | The transformer and the distribution will be installed as per the load allocated for the project by the electricity department. The overhead |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | State of Art sewage treatment plant will be installed to cater for the domestic effuse if the project. The multi stage mechanism will bring down the effluents within the permissible limit of the municipal corporation before disposal. |
| Solid Waste Management And Disposal System | The dalab ghars or Garbage collection centers will be constructed in three numbers with each having area of 15 sq.m. Other than this the dustbins will be installed at all suitable location of the project. |
| Water Conservation System | Three rainwater harvesting pits will be installed. The each will have 50000l capacity. The surface runoff and rainwater will be collected and filtered down through layered filtration process. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | All activities for the improvement in project facilities |
Bank Details
| Bank Name | HDFC BANK LIMITED |
| Branch | Sanjay Place, Agra |
| Branch Address | Shop No. 3,4, 11, Ground Floor, Block No. 17/2/4, Friends Plaza, Sanjay Place Agra |
| Account Holder | RAPL-RAJDARBAR SPACES PH-3 COLLECTION AC |
| Account Number | 5020083607692 |
| IFSC Code | HDFC0000121 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in