SARITA DHAM
RAINBOW INFRA HOUSING PRIVATE LIMITED
Agra, Uttar Pradesh
Approved
1st May 2021
Completed
6th Jun 2026
Registration No.
UPRERAPRJ580064
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ580064 |
| Project Status | Completed |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2021-05-01 |
| Completion Date | 2026-06-06 |
| Total Area (sqm) | 20472 |
| Project Cost (Lacs) | 2800 |
| Duration (Months) | 62 |
| Registration Fee | 107500 |
Promoter Details
| Promoter Name | RAINBOW INFRA HOUSING PRIVATE LIMITED |
| Promoter ID | UPRERAPRM134569 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Amit Juneja |
| Contractor | Suraj Bhan Sagar |
| Structural Engineer | Pradyuman Kumar Yadav |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 239 | 6207.5 |
| Khasra | 240 | 3112.25 |
| Khasra | 240 | 3112.25 |
| Khasra | 236 | 4280 |
| Khasra | 240 | 3112.25 |
| Khasra | 240 | 3112.25 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 73 | 8 | 138 |
| Plot | 66 | 1 | |
| Plot | 101 | 1 | |
| Plot | 73 | 40 | |
| Plot | 97 | 32 | |
| Plot | 89 | 2 | |
| Plot | 115 | 2 | |
| Plot | 105 | 4 | |
| Plot | 96 | 4 | |
| Plot | 86 | 5 | |
| Plot | 84 | 1 | |
| Plot | 85 | 1 | |
| Plot | 87 | 1 | |
| Plot | 77 | 6 | |
| Plot | 79 | 4 | |
| Plot | 92 | 1 | |
| Plot | 80 | 3 | |
| Plot | 72 | 5 | |
| Plot | 76 | 1 | |
| Plot | 81 | 1 | |
| Plot | 126 | 1 | |
| Plot | 71 | 3 | |
| Plot | 70 | 4 | |
| Plot | 69 | 4 | |
| Plot | 68 | 1 | |
| Plot | 82 | 1 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The plots are demarcated as per the sanctioned plan by Agra Development Authority. The length and width of the plots w.r.t to face towards road are all maintained with the state of art survey equipment. |
| Boundary Wall | A six to eight feet high earth quake resistant boundary wall will be constructed along the project boundary at necessary locations. The brick wall will be plastered and painted. the foundation will be deep. |
| Road Work | A flexible pavement with bituminous wearing course will be laid to specifications and slopes. A compacted earth + Granular Sub base+ Sub Base + PMC. The road widths are 9m and 7.5 m. |
| Footpaths | 4 to 6 inch paver block will be laid at the periphery and walking areas of park to assist safe walking and at the same time enhancing the beautythrough the colored patterns. M-15 grade paver blocks will be used |
| Water Supply Including Drinking Water Facilities | Ground water will be pumped to Overhead tank . The potable water will then be supplied to pipes to each unit. The tank is earth quake resistant and the IS mark durable pipes will be laid to maintain the desired flow for water consumption in domestic use. |
| Sewer System | Each unit is connected to a sewer line. The underground sewer line will travel to the sewage treatment plant. The 600m dia. man hole chambers are placed to ensure smooth functioning of sewer line. |
| Drain | Surface and Sub-surface drains of the designed dimension in the desired slopes are laid to cater for smooth recess of the domestic water . The longitudinal slopes are toward the planned municipal drains where the water will be disposed. Majority of water will be used to recharge the water table. |
| Parks | Four no. of lush green parks will be maintained in the project as per the approved layout. Parks will have kids play area and sitting areas for elders. |
| Tree Planting | Multiple number any type of trees will be planted in the project as per plan. The selection of trees will be done to suit the flora and fauna of the project location for the perpetual life and greenery. |
| Design For Electric Supply Including Street Lighting | A separate transformer will be installed as per the provisions and approval of local electric board. The load will be sufficient to cater for the domestic and common use of the project to the sanctioned population density. Street lights will be using LEDs to reduce the consumption and to provide better lghting |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | State of Art Multi stage Sewage treatment Plant will be installed as per approved design and specification. The treatment will be within permissible prevailing environmental law before surcharge disposal |
| Solid Waste Management And Disposal System | A dalab Ghar will be constructed, in addition the Dustbins will be installed in the project for the safe and smooth collection and disposal of waste. |
| Water Conservation System | A water conservation units will be installed to collect the run offs. Minimum depth of 3 m will be provided which includes collection and filtration chambers. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not applicable |
| Other Miscellaneous Work | As per project requirement |
Bank Details
| Bank Name | State Bank of India |
| Branch | SBI NUNHAI |
| Branch Address | Industrial Estate, Nunhai, Agra DT, Agra-282006 |
| Account Holder | RAINBOW INFRA HOUSING PRIVATE LIMITED |
| Account Number | 40219357401 |
| IFSC Code | SBIN0001126 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





