SHRI KRISHNA VAAS EXTENSION
GOVIND INFRAPLANNER PRIVATE LIMITED
Agra, Uttar Pradesh
Approved
15th Jul 2018
Completed
30th Jun 2023
Registration No.
UPRERAPRJ563327
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ563327 |
| Project Status | Completed |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2018-07-15 |
| Completion Date | 2023-06-30 |
| Total Area (sqm) | 4888 |
| Project Cost (Lacs) | 283 |
| Duration (Months) | 60 |
| Registration Fee | 29500 |
Promoter Details
| Promoter Name | GOVIND INFRAPLANNER PRIVATE LIMITED |
| Promoter ID | UPRERAPRM70839 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | MEGHRAJ SINGH KAURAV |
| Contractor | DHARAMDAS AHIRWAR |
| Structural Engineer | A. K. UPADHYAY |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1510 | 3457.5 |
| Khasra | 1511 | 501.6 |
| Khasra | 1511 | 501.6 |
| Khasra | 1511 | 62.7 |
| Khasra | 1511 | 108.79 |
| Khasra | 1511 | 62.28 |
| Khasra | 1511 | 142.35 |
| Khasra | 1511 | 52.19 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | DEMARCATION OF PLOTS HAS COMPLETED |
| Boundary Wall | THE BOUNDARY WALL IS BUILT BY BRICKS WITH R.C.C. FRAMED STRUCTURE |
| Road Work | 9MT WIDE ROAD |
| Footpaths | NOT APPLICABLE |
| Water Supply Including Drinking Water Facilities | SUPPLY AND LAYING OF 90MM DIA PVC PIPE ISI MARK INCLUDING OF PVC SPECIAL TEE, BEND, SOCKET, END CAP, CEMENT SOLUTION ETC. REQUIRED FOR PROPER COMPLETION OF WORK. FIXING OF SUBMERSABLE PUMP AND BORRING OF TUBE WELL 100MM SIZE ETC. |
| Sewer System | SUPPLY, LAYING AND JOINTNG 250MM DIA RCC HUME PIPE IN PROPER SLOP AND ALIGNMENT AS PER SPECIFICATION AND DIRECTION. CONSTRUCTION OF INSPECTION CHAMBER OF SIZE 1.00 X 1.20 IN 1;4 CEMENT AND SAND MORTAR INCLUDIND RCC SLAB MS, MAINHOLE COVER ETC. |
| Drain | CONSTRUCTION OF DRAIN AND DRAIN CROSSING AS PER DETAILS, DRAWINGS AND SPECIFICATION APPROVED. |
| Parks | CONSTRUCTION OF PARK INCLUDING EARTH WORK IN EXCAVATION FOUNDATION BRICK BALLAST IN 100 ; 16 ; 32 IN FOUNDATION BRICK WORK IN 1;6 CEMENT SAND MORTAR IN SUPERSTRUCTURE. |
| Tree Planting | TREE PLANTATION AS PER REQUIREMENT. |
| Design For Electric Supply Including Street Lighting | SUPPLY AND FIXING OF ELECTRIC POLES WITH CONDUCTORS AS PER SPECIFICATION OF UPSEB |
| Community Buildings | NOT APPLICABLE |
| Treatment and Disposal System of Sewage and Sullage water | SUPPLY, LAYING AND JOINTNG PIPE IN PROPER SLOPE AND ALIGNMENT AS PER SPECIFICATION AND DIRECTION. CONSTRUCTION OF INSPECTION CHAMBER OF SIZE 1.00 X 1.20 IN 1;4 CEMENT AND SAND MORTAR INCLUDIND RCC SLAB MS, MAINHOLE COVER ETC. |
| Solid Waste Management And Disposal System | NOT APPLICABLE |
| Water Conservation System | RAIN WATER HARVESTING SYSTEM |
| Energy Management System Including Use of Renewable Energy | NOT APPLICABLE |
| Fire Protection And Fire Safety System | NOT APPLICABLE |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NOT APPLICABLE |
| Emergency Evacuation Services | NOT APPLICABLE |
| Other Miscellaneous Work | WORK IN PROGRESS AS PER DETAILS, DESIGN AND SPECIFICATIONS APPROVED BY ADA |
Bank Details
| Bank Name | CENTRAL BANK OF INDIA |
| Branch | AGRA |
| Branch Address | AGRA |
| Account Holder | GOVIND INFRAPLANNER PRIVATE LIMITED |
| Account Number | 3685046319 |
| IFSC Code | CBIN0280233 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in