VISHWAKARMA CARNIVAL
BRIJESH SAHKARI AVAS SAMITI LIMITED
Agra, Uttar Pradesh
Approved
1st Jul 2022
Pending
25th Jun 2027
Registration No.
UPRERAPRJ162313
Project Type
Residential
District
Agra
Taluka
Agra
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ162313 |
| Project Status | New |
| Project Category | Residential |
| District | Agra |
| Taluka | Agra |
| Start Date | 2022-07-01 |
| Completion Date | 2027-06-25 |
| Total Area (sqm) | 20993 |
| Project Cost (Lacs) | 830 |
| Duration (Months) | 60 |
| Registration Fee | 110000 |
Promoter Details
| Promoter Name | BRIJESH SAHKARI AVAS SAMITI LIMITED |
| Promoter ID | UPRERAPRM181296 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | A.K Upadhyay |
| Contractor | Brijesh Sahkari Avas Samiti Limited - Self |
| Structural Engineer | Rakesh Kohli |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 217, Mauja Dehtora, Lohamandi Ward, Agra | 25760 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 97 | 2 | 135 |
| Plot | 97 | 48 | |
| Plot | 149 | 1 | |
| Plot | 148 | 2 | |
| Plot | 93 | 1 | |
| Plot | 127 | 2 | |
| Plot | 130 | 1 | |
| Plot | 98 | 2 | |
| Plot | 102 | 1 | |
| Plot | 82 | 1 | |
| Plot | 83 | 14 | |
| Plot | 86 | 1 | |
| Plot | 90 | 11 | |
| Plot | 89 | 1 | |
| Plot | 94 | 1 | |
| Plot | 87 | 24 | |
| Plot | 74 | 2 | |
| Plot | 91 | 1 | |
| Plot | 85 | 1 | |
| Plot | 103 | 1 | |
| Plot | 37 | 1 | |
| Plot | 81 | 1 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | All the plots will be demarcated as per the approved plan inclusive of roads 7.5m and 9m wide. The orientation of the units and all other parts of the project will as per approved map using latest survey equipment and skilled professionals |
| Boundary Wall | A boundary wall of 6 to 8 feet will be constructed for the project periphery. The wall will be constructed in brick work. The brick work will be done in cement mortar, and it will be plastered and painted. The foundation will be as per design . |
| Road Work | The Flexible or Rigid Pavements will be constructed in the project. The Wearing course will be laid on minimum 150mm compacted granular layer over the compacted subgrade to the minimum desired density of 98 percent. |
| Footpaths | Paver block will be laid for footpaths. The 100mm block of M-15 strength will be laid on 50mm sand bed over a compacted layer of 200mm |
| Water Supply Including Drinking Water Facilities | The underground water tank of 1 Lac liters will be constructed. The Submersible pump station will be installed to pump the potable ground water to the tank, from where it will be pumped through PVC pipelines to each unit. |
| Sewer System | 300mm to 450 mm hume pies and concrete structures will be constructed to cater for the domestic sewer of the project. The manholes will be constructed at junction and required length to maintain the sewer line. The slopes will lead to STP of the project |
| Drain | The lined covered drain will be constructed on both sides of the roads adjacent to units. The CC or brickwork plastered will be used to construct the drain with top with of 300mm and depth of 300mm min, to maintain the continuous flow. CD will be constructed at junctions with respect to slope |
| Parks | 2 lush green Parks with all amenities will be developed as per the landscape plan and dimensions approved by Agra Development Authority |
| Tree Planting | The trees will be planted along the project boundary wall and all suitable locations and the periphery of the parks to keep the project green and clean. |
| Design For Electric Supply Including Street Lighting | The separate transformer will be installed as per load calculation for the project done by Torrent Power Limited. The electricity will be transferred through the electrical poles and distribution boxes to each unit of the project |
| Community Buildings | Not Applicable. But all arrangement will be made for residents |
| Treatment and Disposal System of Sewage and Sullage water | A multistage sewage treatment plant will be constructed in the project with calculation 150 KLD per person. The sewage will be treated to bring the effluents within permissible limit before disposal |
| Solid Waste Management And Disposal System | The dalab ghars in the area 0f 42 sq,m will be constructed as per the approved map. In addition, the Dustbins will be installed at all suitable location of the project for collection and disposal of garbage from the project |
| Water Conservation System | The 30000ltr capacity will be constructed. The perforated pipe wil be put in bore to the depth of 8 m. min. The filtrations system of reducing granular size material will be constructed to collect the catchment water |
| Energy Management System Including Use of Renewable Energy | Not Applicable, but all green technologies and energy conservation methods will be adopted. |
| Fire Protection And Fire Safety System | Not Applicable. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | All necessary arrangements will be made |
Bank Details
| Bank Name | IDBI BANK |
| Branch | Sanjay Place-AgrA |
| Branch Address | Ground Floor Padamdeep Tower, Sanjay Place, Agra 282002 |
| Account Holder | Brijesh Sahkari Avas Samiti Limited Collection Account For Vishwakarma Carnival |
| Account Number | 0080102000057372 |
| IFSC Code | IBKL0000080 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in