New Launch - India Real Estate Report 2026.

Ozone City Phase-7 The Golden Estate

OZONE BUILDERS & DEVELOPERS PVT LIMITED

Aligarh, Uttar Pradesh

RERA approved

Approved

20th Dec 2022

Completion pending

Pending

14th Dec 2027

Registration No.

UPRERAPRJ510771

Project Type

Residential

District

Aligarh

Taluka

Koil

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ510771
Project StatusNew
Project CategoryResidential
DistrictAligarh
TalukaKoil
Start Date2022-12-20
Completion Date2027-12-14
Total Area (sqm)31299
Project Cost (Lacs)1323
Duration (Months)60
Registration Fee161500

Promoter Details

Promoter NameOZONE BUILDERS & DEVELOPERS PVT LIMITED
Promoter IDUPRERAPRM5303
Mobile92********

Project Team

rolename
ArchitectVakil Mittal
ContractorMayank Agarwal
Structural EngineerNot Applicable because of Plotted Development

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra65, 69/6, 171/1, 171/2, 172, 173Min, 174 Min, 42/3, 48/2, 48/5, 48/7, 9/4, 116/131299.78

Development Works

work_namedescription
Demarcation of PlotsThe Project land is demarcated as follows- by North- Phase-5th map no.-43/15(2012-13), by south- submitted online map for approval map no.- AGDA/LD/20-21/0732, by East Phase-2, map no.- 731/15 (2008-09), by west another land, khasra no.-48, and the individual plots are demarcated by the construction of demarcation with Piller nos. and with brickwork.
Boundary Wall3.0 Metre high boundary wall with brickwork and one side plaster R.C.C Columns approx. 4.5 to 5.0 meters from center to center. The boundary wall shall be earthquake-resistant.
Road WorkAll roads in the complex will be in combination with RCC and concrete pavers of different colors, shapes, and thicknesses. Roads will be laid over 225 mm water-bound macadam.
FootpathsAll footpaths in the complex will be in combination with concrete pavers of different colors, shapes, and thicknesses of 65 mm and 80 mm laid over a 150 mm water-bound macadam surface.
Water Supply Including Drinking Water FacilitiesDrinking water supply is to be provided through the existing overhead tank to the plots and treated water will be supplied from STP for irrigation. The drinking water source is from existing tube wells. A water filtration plant is installed before the overhead tank.
Sewer SystemThe sewage will be collected through RCC/ Soil pipeline arrangement, bends, and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and the main pipeline of 400 mm dia shall be used.
DrainRain water shall be collected in drains having minimum width of 150mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in the periphery of the complex and these manholes shall be finally connected with the drain of harvesting pits and overflow to jaffri drain. Inspection chambers shall be of 900 mm dia and the main pipeline of 300 mm dia shall be used.
ParksA lush green internal park will be provided and maintained. The parks will have jogging tracks, a pavilion, childrens play areas and sitting areas. The total park area in the project will be 4877.72 sq. mtr.
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as pe the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage of the project. The 76 no. of trees shall be planted in the entire project area.
Design For Electric Supply Including Street LightingElectric supply is provided through 33/0.415 KV transformers installed in adjoining land owned by the promoter. External street lighting shall be through grid power.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSewage shall be treated in a sewage treatment plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purposes.
Solid Waste Management And Disposal SystemSolid waste is to be collected from individual plots and stored in the garbage room. The professional service provider shall be engaged for the disposal of solid waste outside the project premises.
Water Conservation SystemRainwater harvesting pits of 13 nos. and size 1.50 mtr. diameter each shall be provided for ground water recharging and overflow to be discharged in the jaffari drains. Treated sewage shall be used for irrigation.
Energy Management System Including Use of Renewable EnergyA single point supply of 33kv shall be taken and through an electric substation, 440v supply shall be supplied to individual plots through distribution panels and sub meters.
Fire Protection And Fire Safety SystemNot Applicable.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon social infrastructure shall be provided for all the phases combined.
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameKarnataka Bank Limited
BranchNOIDA
Branch AddressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301
Account HolderOzone Builders and Developers Pvt. Ltd.- Collection Account for Ozone City Phase-7 The Golden Estate
Account Number2252000100172501
IFSC CodeKARB0000545

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy