Ozone City Phase-VI The Golden Estate

OZONE INFRAHEIGHT PRIVATE LIMITED

Aligarh, Uttar Pradesh

RERA approved

Approved

15th Jul 2023

Completion pending

Pending

13th Jul 2028

Registration No.

UPRERAPRJ502288

Project Type

Residential

District

Aligarh

Taluka

Koil

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ502288
Project StatusNew
Project CategoryResidential
DistrictAligarh
TalukaKoil
Start Date2023-07-15
Completion Date2028-07-13
Total Area (sqm)39997
Project Cost (Lacs)1518
Duration (Months)60
Registration Fee205000

Promoter Details

Promoter NameOZONE INFRAHEIGHT PRIVATE LIMITED
Promoter IDUPRERAPRM217403
Mobile92********

Project Team

rolename
ArchitectAr. Mr. Vakil Mittal
ContractorMr. Mayank Agarwal Director of Arete Constructions Private Limited
Structural EngineerNot applicable because of plotted development.

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGata no.- 171/3, 171/4, 179/2, 179/3, 180, 222MIN, 151/2, 171/5, 179/1, 149/1, 149/2, 73,74, 73/3, 151/3 and 69/139996.61

Development Works

work_namedescription
Demarcation of PlotsThe project land is demarcated as follows by north- Ozone City Phase-3rd Map no. 10/15(2012-13) to the south other project in name of Smiley Homes, East- Land of owner and other land of village Yakutpur, Tehsil Koil, Aligarh-202001, to the west- Ozone City Phase- VII The golden Estate Map no.- AGDA/LD/21-22/0100, and the individual plots are demarcated by construction of demarcation with pillar nos. and with brick work.
Boundary Wall3.0 metres high boundary wall with brick work and one side plaster R.C.C columns approx. 4.5 to 5.0 metres centre to centre. The boundary wall shall be earthquake resistant.
Road WorkAll roads in the complex will be in combination of R.C.C and concrete pavers of different colours, shape, thickness. Roads will be laid over 255 mm water bound macadam surface.
FootpathsAll footpaths in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80 mm aid over 150 mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesDrinking water supply will be provided through the existing over head tank to the plots and treated water will be supplied to STP for irrigation. Drinking water source is from existing tube wells. Water filtration plant is installed before the overhead tank.
Sewer SystemThe sewerage will be collected through RCC/ soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and main pipeline of 400 mm dia shall be used.
DrainRain water shall be collected in drains having a minimum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in periphery of complex and these man holes shall be finally connected with drain of harvesting pits and over flow to jaffri drain. Inspection chambers shall be of 900 mm dia and main pipeline of 300 mm dia shall be used.
ParksLush green internal park will be provided and maintained. The parks will have jogging tracks, pavillion, children play area ad sitting areas. The total park area in the project will be 4877.72 sq. mtr.
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project. The 76 no. of trees shall be planted in the entire project.
Design For Electric Supply Including Street LightingElectric supply will be provided through 33/0.415 KV transformers installed in adjoining land owned by the promoter. External street lighting shall be through power grid.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSewage shall be treated in Sewage Treatment Plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purpose.
Solid Waste Management And Disposal SystemSolid waste to be collected from individual plots and stored in garbage room. Professional service provider shall be engaged for disposal of solid waste outside the project premises.
Water Conservation SystemRain water harvesting pits of 18 nos. and size 1.50 mtr diameter each shall be provided for ground water recharging and overflow to be discharged in the jaffri drains. Treated sewage shall be used for irrigation.
Energy Management System Including Use of Renewable EnergySingle point supply of 33KV shall be taken and through electric sub station 440V supply shall be supplied to individual plots through distribution panels and sub meters.
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon social infrastructure shall be provided for all the phases combined.
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameKarnataka Bank Limited
BranchNoida
Branch AddressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301
Account HolderOZONE INFRAHEIGHT PRIVATE LIMITED- COLLECTION ACCOUNT FOR OZONE CITY PHASE- VI THE GOLDEN ESTATE
Account Number5452000100130701
IFSC CodeKARB0000545

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy