VAISHNO CRYSTAL
JADON INFRATECH
Aligarh, Uttar Pradesh
Approved
11th Mar 2019
Completed
9th Sept 2024
Registration No.
UPRERAPRJ839360
Project Type
Residential
District
Aligarh
Taluka
Koil
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ839360 |
| Project Status | Completed |
| Project Category | Residential |
| District | Aligarh |
| Taluka | Koil |
| Start Date | 2019-03-11 |
| Completion Date | 2024-09-09 |
| Total Area (sqm) | 4498 |
| Project Cost (Lacs) | 7500 |
| Duration (Months) | 66 |
| Registration Fee | 27500 |
Promoter Details
| Promoter Name | JADON INFRATECH |
| Promoter ID | UPRERAPRM82423 |
| Mobile | 88******** |
Project Team
| role | name |
|---|---|
| Architect | AR. KRISHAN UPADHYAY |
| Contractor | RAM VEER SINGH |
| Structural Engineer | KRASHNA GOPAL |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 520 | 4498 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A | BSMNT | OTHER | 0 | 0 | - |
| A | BSMNT2 | OTHER | 0 | 0 | - |
| A | BSMNT3 | OTHER | 0 | 0 | - |
| A | GF | OTHER | 0 | 0 | 0 |
| A | 1 | 5 BHK | 2 | 111.5 | - |
| A | 1 | 4 BHK | 2 | 83 | - |
| A | 2 | 5 BHK | 2 | 111.5 | - |
| A | 2 | 4 BHK | 2 | 83 | - |
| A | 3 | 5 BHK | 2 | 111.5 | - |
| A | 3 | 4 BHK | 2 | 83 | - |
| A | 4 | 5 BHK | 2 | 111.5 | - |
| A | 4 | 4 BHK | 2 | 83 | - |
| A | 5 | 5 BHK | 2 | 111.51 | - |
| A | 5 | 4 BHK | 2 | 83 | - |
| A | 6 | 5 BHK | 2 | 111.5 | - |
| A | 6 | 4 BHK | 2 | 83 | - |
| A | 7 | 5 BHK | 2 | 111.5 | - |
| A | 7 | 4 BHK | 2 | 83 | - |
| A | 8 | 5 BHK | 2 | 111.5 | - |
| A | 8 | 4 BHK | 2 | 83 | - |
| B | BSMNT | OTHER | 0 | 0 | - |
| B | BSMNT2 | OTHER | 0 | 0 | - |
| B | BSMNT3 | OTHER | 0 | 0 | - |
| B | GF | OTHER | 0 | 0 | 0 |
| B | 1 | 4 BHK | 4 | 83 | - |
| B | 2 | 4 BHK | 4 | 83 | - |
| B | 3 | 4 BHK | 4 | 83 | - |
| B | 4 | 4 BHK | 4 | 83 | - |
| B | 5 | 4 BHK | 4 | 83 | - |
| B | 6 | 4 BHK | 4 | 83 | - |
| B | 7 | 4 BHK | 4 | 83 | - |
| B | 8 | 4 BHK | 4 | 83 | - |
| C | BSMNT | OTHER | 0 | 0 | - |
| C | BSMNT2 | OTHER | 0 | 0 | - |
| C | BSMNT3 | OTHER | 0 | 0 | - |
| C | 1 | 4 BHK | 2 | 140 | - |
| C | 2 | 4 BHK | 2 | 140 | - |
| C | 3 | 4 BHK | 2 | 140 | - |
| C | 4 | 4 BHK | 2 | 140 | - |
| C | 5 | 4 BHK | 2 | 140 | - |
| C | 6 | 4 BHK | 2 | 140 | - |
| C | 7 | 4 BHK | 2 | 140 | - |
| C | 8 | 4 BHK | 2 | 140 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | AS PER SANCTIONED PLAN AND FINALIZATION AFTER LAND SURVEY |
| Boundary Wall | TEMPORARY BARRICADING WILL BE DONE DURING CONSTRUCTION PHASE AND PERMANENT INSTALLATION DURING COMPLETION |
| Road Work | DEMARCATION AS PER SANCTIONED PLAN AND DETAILING AS PER LANDSCAPE CONSULTANT |
| Footpaths | DEMARCATION AS PER SANCTIONED PLAN AND DETAILING AS PER REGISTERED CONSULTANT |
| Water Supply Including Drinking Water Facilities | AS PER PROJECT REQUIREMENT WITH CONNECTION ON THE BASIS OF PERMISSION GRANTED BY THE WATER AND SEWER DEPARTMENT AND SUPPLY MATERIALS |
| Sewer System | AS PER PROJECT REQUIREMENT WITH CONNECTION ON THE BASIS OF PERMISSION GRANTED BY THE WATER AND SEWER DEPARTMENT AND SUPPLY MATERIALS |
| Drain | AS PER PROJECT REQUIREMENT WITH INCLUSION OF RAIN WATER HARVESTING FOR BETTERMENT OF ENVIRONMENT. |
| Parks | PARKS AND GREEN AREA DEMARCATION AS PER SANCTIONED LAYOUT AND DETAILING AS PER REGISTERED CONSULTANT |
| Tree Planting | NUMBERS OF EVERGREEN TREES AS PER SANCTIONED LAYOUT AND DETAILING AS PER REGISTERED CONSULTANT |
| Design For Electric Supply Including Street Lighting | DESIGNING ON THE BASIS OF UPPCL NORMS AND COMMISSIONING ON THE BASIS OF DESIGN LOAD SANCTIONED. |
| Community Buildings | NOT APPLICABLE |
| Treatment and Disposal System of Sewage and Sullage water | TREATMENT WITH HELP OF LATEST STP TECHNOLOGY AND DISPOSAL AS PER WATER DESIGNING AND WITH THE PERMISSION OF WATER AND SEWER DEPARTMENT. |
| Solid Waste Management And Disposal System | MANAGEMENT AS PER LEED GREEN BUILDING NORMS. |
| Water Conservation System | WATER CONSERVATION WITH THE HELP OF RAIN WATER HARVESTING AND GREEN BUILDING SUGGESTIVE USE. |
| Energy Management System Including Use of Renewable Energy | ENERGY MANAGEMENT AS PER ENVIRONMENTAL CLEARANCE WITH THE USE OF RENEWABLE SOURCE OF ENERGY LIKE SOLAR ENERGY. |
| Fire Protection And Fire Safety System | AS PER FIRE NOC AND NBC NORMS |
| Social Infrastructure And Other Public Amenities Including Public Health Services | AS REQUIRED ON THE DESIGN BASIS AS PER NORMS. |
| Emergency Evacuation Services | AS PER FIRE NOC AND DESIGNING ON THE BASIS OF NBC NORMS |
| Other Miscellaneous Work | AS PER PROJECT REQUIREMENT. |
Bank Details
| Bank Name | ALLAHABAD BANK |
| Branch | SAMAD ROAD ALIGARH |
| Branch Address | SAMAD ROAD ALIGARH |
| Account Holder | JADON INFRATECH |
| Account Number | 50439973832 |
| IFSC Code | ALLA0210525 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in