Paras Enclave
SHREE PARAS DEVELOPERS
Amroha, Uttar Pradesh
Approved
15th Nov 2021
Pending
14th Nov 2029
Registration No.
UPRERAPRJ252031
Project Type
Residential
District
Amroha
Taluka
Amroha
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ252031 |
| Project Status | New |
| Project Category | Residential |
| District | Amroha |
| Taluka | Amroha |
| Start Date | 2021-11-15 |
| Completion Date | 2029-11-14 |
| Total Area (sqm) | 28834 |
| Project Cost (Lacs) | 3922 |
| Duration (Months) | 96 |
| Registration Fee | 149500 |
Promoter Details
| Promoter Name | SHREE PARAS DEVELOPERS |
| Promoter ID | UPRERAPRM168370 |
| Mobile | 81******** |
Project Team
| role | name |
|---|---|
| Architect | Sandeep Tondon |
| Contractor | Self |
| Structural Engineer | Bhavna |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 229/3 | 0.404 |
| Khasra | 231/1 | 1.118 |
| Khasra | 229MI/2 | 1.522 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Plot | 80 | 26 | |
| Plot | 81 | 22 | |
| Plot | 82 | 2 | |
| Plot | 83 | 1 | |
| Plot | 84 | 1 | |
| Plot | 85 | 2 | |
| Plot | 86 | 1 | |
| Plot | 87 | 1 | |
| Plot | 88 | 1 | |
| Plot | 95 | 6 | |
| Plot | 96 | 1 | |
| Plot | 98 | 6 | |
| Plot | 100 | 1 | |
| Plot | 104 | 1 | |
| Plot | 107 | 10 | |
| Plot | 108 | 6 | |
| Plot | 109 | 7 | |
| Plot | 110 | 5 | |
| Plot | 111 | 5 | |
| Plot | 112 | 3 | |
| Plot | 116 | 1 | |
| Plot | 120 | 1 | |
| Plot | 133 | 2 | |
| Plot | 139 | 1 | |
| Plot | 142 | 2 | |
| Plot | 146 | 10 | |
| Plot | 147 | 2 | |
| Plot | 148 | 1 | |
| Plot | 149 | 4 | |
| Plot | 150 | 2 | |
| Plot | 204 | 1 | |
| Plot | 205 | 1 | |
| Plot | 280 | 1 | |
| Villa | 80 | 8 | 110 |
| Villa | 111 | 1 | 143 |
| Villa | 112 | 2 | 144 |
| Villa | 113 | 1 | 145 |
| Villa | 146 | 2 | 168 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have different plot sizes which we are proposing to develop, demarcation for which is under process. |
| Boundary Wall | 3 m high and 230 mm thick Brick work and rcc work in column and beam for the side boundary. At the front face of boundary wall there is a display wall along with grill design which give a beautiful iconic design to boundary wall |
| Road Work | From the main entrance gate we have interlocking brick /RCC road through out the project. Whose wideness starts from 7.5 mtr. |
| Footpaths | Footpaths will be provided as required, with adequate width and beautiful pattern. |
| Water Supply Including Drinking Water Facilities | We will provide water supply facilities for all the plots and villas proposed in the project. |
| Sewer System | Sewerage system shall be Provided. All Sewerage water shall go to the Sewer tank and overflow from the Sewer tank shall be drained out . |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water |
| Parks | We will provide green area with the different activities and the green area will have gaming facilities for kids. |
| Tree Planting | We will provide many type of trees, big and small, in green area. |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Sewerage system shall be Provided. All Sewerage water shall be go to the Sewer tank and overflow from the tank shall be connect with the Municipal sewerage system.,when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Bank of Baroda |
| Branch | Amroha Branch |
| Branch Address | Bara Bazar , Amroha |
| Account Holder | Shree Paras Developers - Collection Account For Paras Enclave |
| Account Number | 27080200000660 |
| IFSC Code | BARB0BLYAMR |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in