New Launch - India Real Estate Report 2026.

The Sarayu 3

HOABL Realtech Private Limited

Ayodhya, Uttar Pradesh

RERA approved

Approved

1st May 2024

Completion pending

Pending

30th Sept 2027

Registration No.

UPRERAPRJ774489/07/2024

Project Type

Residential

District

Ayodhya

Taluka

Sadar(Faizabad)

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ774489/07/2024
Project StatusNew
Project CategoryResidential
DistrictAyodhya
TalukaSadar(Faizabad)
Start Date2024-05-01
Completion Date2027-09-30
Total Area (sqm)28380
Project Cost (Lacs)5666
Duration (Months)41
Registration Fee147000

Promoter Details

Promoter NameHOABL Realtech Private Limited
Promoter IDUPRERAPRM265798
Mobile88********

Project Team

rolename
ArchitectSanjay Kumar Jain
ContractorAnkur Gupta C/o Steeltech Engineering Works
Structural EngineerNA

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra4KHA/6, 76/1, 76/2, 76/3, 77, 78, 79, 80,81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95 & 9628379.77

Development Works

work_namedescription
Demarcation of PlotsProject consists of 75 plots
Boundary WallPeripheral compound wall comprising of foundation and 1.5m high masonry wall with barbed wire fencing including plastering and painting as per design.
Road WorkWe have road network varying from 9m to 18 m. All roads are bituminous/asphalt roads in the project.
Footpaths1m wide pavered footpath planned along one side of the road.
Water Supply Including Drinking Water FacilitiesWe will provide water tanks with adequate distribution mechanism and connection through underground pipelines.
Sewer SystemModular Sewerage system is planned which shall be connected with the Municipal sewerage system.
DrainStorm water drain shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and overflow shall be connect with Municipal drain line.
ParksWe will provide green area with the different activities spread across approx 4,000 sq.m
Tree PlantingWe will provide many type of trees with diverse fauna and various species all along the project.
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board .
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system is planned which shall be connected with the Municipal sewerage system.
Solid Waste Management And Disposal SystemThere is adequate garbage collection area provided for the solid waste management.
Water Conservation SystemWe shall provide rain water harvesting system for water conservation and improve the ground water level.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkAs per approved map

Bank Details

Bank NameICICI Bank
BranchAyodhya
Branch AddressV Square, 4101, Civil Lines, Ayodhya
Account HolderHOABL REALTECH PRIVATE LIMITED COLLECTION ACCOUNT THE SARAYU 3
Account Number157205002124
IFSC CodeICIC0001572

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy