New Launch - India Real Estate Report 2026.

The Sarayu 4

HOABL Realtech Private Limited

Ayodhya, Uttar Pradesh

RERA approved

Approved

1st Jan 2025

Completion pending

Pending

30th Jun 2028

Registration No.

UPRERAPRJ397318/10/2024

Project Type

Residential

District

Ayodhya

Taluka

Sadar(Faizabad)

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ397318/10/2024
Project StatusNew
Project CategoryResidential
DistrictAyodhya
TalukaSadar(Faizabad)
Start Date2025-01-01
Completion Date2028-06-30
Total Area (sqm)32416
Project Cost (Lacs)6485
Duration (Months)42
Registration Fee167500

Promoter Details

Promoter NameHOABL Realtech Private Limited
Promoter IDUPRERAPRM265798
Mobile88********

Project Team

rolename
ArchitectSanjay Kumar Jain
ContractorSteelTech Engineering Services
Structural EngineerVinod Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 1442 VA/5, 1442 BA/1, 1442 Mi32415.75

Development Works

work_namedescription
Demarcation of PlotsProject consists of 97 plots in Phase 4
Boundary WallPeripherial compound wall comprising of foundation and 1.5m high masonry wall with barbed wire fencing including plastering and painting as per design.
Road WorkWe have road network varying from 9m to 18m. All roads are bituminous/asphalt roads in the project.
FootpathsIn this project internal footpaths will not be provided.
Water Supply Including Drinking Water FacilitiesWe will provide water tanks with adequate distribution mechanism and connection through underground pipelines.
Sewer System200mm-300mm wide dia Sewer lines will be laid out along the 9-18m wide roads. More than 10 manholes will be provided to service the drains
Drain750mm wide Storm water drains shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel.
ParksWe will provide green area with the different activities spread across approx 5,000 sq.m in 3 or more locations
Tree PlantingWe will provide many type of trees with diverse fauna and various species all along the project.
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board .
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system is planned which shall be connected with the Municipal sewerage system.
Solid Waste Management And Disposal SystemThere is adequate garbage collection area provided for the solid waste management.
Water Conservation SystemWe shall provide rain water harvesting system for water conservation and improve the ground water level.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkAs per approved maps

Bank Details

Bank NameICICI Bank
BranchFaizabad/ Ayodhya
Branch AddressV Square, 4101, Civil Lines, Faizabad
Account HolderHOABL REALTECH PRIVATE LIMITED COLLECTION ACCOUNT THE SARAYU 4
Account Number157205002126
IFSC CodeICIC0001572

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy