New Launch - India Real Estate Report 2026.

The Sarayu 5 (The Sarayu Phase 2C)

HOABL Realtech Private Limited

Ayodhya, Uttar Pradesh

RERA approved

Approved

15th Jan 2025

Completion pending

Pending

30th Jun 2028

Registration No.

UPRERAPRJ378870/03/2025

Project Type

Residential

District

Ayodhya

Taluka

Sadar(Faizabad)

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ378870/03/2025
Project StatusNew
Project CategoryResidential
DistrictAyodhya
TalukaSadar(Faizabad)
Start Date2025-01-15
Completion Date2028-06-30
Total Area (sqm)27467
Project Cost (Lacs)4887
Duration (Months)42
Registration Fee142500

Promoter Details

Promoter NameHOABL Realtech Private Limited
Promoter IDUPRERAPRM265798
Mobile88********

Project Team

rolename
ArchitectSanjay Kumar Jain
ContractorSteelTech Engineering services
Structural EngineerVinod Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 1440, 1443, 1444, 1442 Sa/3, 1437 Va/2, 1442 Mi28003.6

Development Works

work_namedescription
Demarcation of PlotsProject consists of 86 plots
Boundary WallPeripherial compound wall comprising of foundation and 1.5m high masonry wall with barbed wire fencing including plastering and painting as per design.
Road WorkWe have road netwrok varying from 9m to 12 m. All roads are bituminous/asphalt roads in the project.
FootpathsIn this project internal footpaths will not be provided.
Water Supply Including Drinking Water FacilitiesWe will provide water tanks with adequate distribution mechanism and connection through underground pipelines.
Sewer System200mm-300mm wide dia Sewer lines witll be laid out along the 9-12m wide roads. More than 10 manholes will be provided to service the drains
Drain200mm-300mm wide dia Sewer lines witll be laid out along the 9-12m wide roads. More than 10 manholes will be provided to service the drains.
ParksWe will provide green area with the different activities spread across approx 2,500 sq.m in 3 or more locations
Tree PlantingWe will provide many type of trees with diverse fauna and various species all along the project.
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board .
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system is planned which shall be connected with the Municipal sewerage system.
Solid Waste Management And Disposal SystemThere is adequate garbage collection area provided for the solid waste management.
Water Conservation SystemWe shall provide rain water harvesting system for water conservation and improve the ground water level.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkAs per approved map

Bank Details

Bank NameICICI Bank
BranchCivil Lines, Faizabad, Ayodhya
Branch AddressV Square, 4101, Civil Lines, Faizabad, Ayodhya
Account HolderHOABL REALTECH PRIVATE LIMITED COLLECTION ACCOUNT THE SARAYU 5 THE SARAYU PHASE 2C
Account Number157205002206
IFSC CodeICIC0001572

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy