Green Park
Laxmi Associates
Bagpat, Uttar Pradesh
Approved
2nd Aug 2021
Completed
31st Jul 2025
Registration No.
UPRERAPRJ343018
Project Type
Residential
District
Bagpat
Taluka
Baraut
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ343018 |
| Project Status | Completed |
| Project Category | Residential |
| District | Bagpat |
| Taluka | Baraut |
| Start Date | 2021-08-02 |
| Completion Date | 2025-07-31 |
| Total Area (sqm) | 33120 |
| Project Cost (Lacs) | 1430 |
| Duration (Months) | 48 |
| Registration Fee | 171000 |
Promoter Details
| Promoter Name | Laxmi Associates |
| Promoter ID | UPRERAPRM148207 |
| Mobile | 88******** |
Project Team
| role | name |
|---|---|
| Architect | Jitendra Sharma - Shelter Architects and Engineers |
| Contractor | Ayub Khan- AIS Constructions Pvt. Ltd. |
| Structural Engineer | N.A. |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 112 | 33120 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot shall be demarcated by stone Signage giving the plots No / Block. |
| Boundary Wall | Gated Community with Brick Wall to be constructed as per the specification of the project. |
| Road Work | Soil Filled and Compressed WBM Plus with RCC on it. |
| Footpaths | Brick paving and interlock tile footpath. |
| Water Supply Including Drinking Water Facilities | Water facilities with Over Head Tank and Municipal Water. |
| Sewer System | STP Provided. |
| Drain | Open Drain with brick and CC Work. |
| Parks | There are Seven Parks with Grass and plants in the Project. |
| Tree Planting | Along the Roads and in the Park. |
| Design For Electric Supply Including Street Lighting | Provision of Street light and Transformer with No Power Backup. |
| Community Buildings | The Community Building are not to be provided. |
| Treatment and Disposal System of Sewage and Sullage water | As per Specification provided in the Sanctioned Layout Plans. |
| Solid Waste Management And Disposal System | AS per Specification provided in the Sanctioned Layout Plans. |
| Water Conservation System | Provision of Rain Water Harvesting System only. |
| Energy Management System Including Use of Renewable Energy | No Provision has been made for any renewable Energy Equipment as the size of project |
| Fire Protection And Fire Safety System | As per Specification provided in the Sanctioned Layout Plans. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | No Provision. |
| Emergency Evacuation Services | it is plotted Development hence the Emergency Evacuation system is not to be provided. |
| Other Miscellaneous Work | No Provision. |
Bank Details
| Bank Name | Yes Bank Limited |
| Branch | Baghpat Branch |
| Branch Address | Ground Floor, Premises bearing No. 116, Ward No. 16, Delhi Road, Baghpat, U.P., PIN- 250611 |
| Account Holder | Laxmi Associates Collection Account for Green Park |
| Account Number | 023672500000020 |
| IFSC Code | YESB0000108 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





