construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda

U.P. Awas Evam Vikas Parishad

Banda, Uttar Pradesh

RERA approved

Approved

1st Oct 2020

Project completed

Completed

30th Sept 2025

Registration No.

UPRERAPRJ658600

Project Type

Residential

District

Banda

Taluka

Banda

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ658600
Project StatusCompleted
Project CategoryResidential
DistrictBanda
TalukaBanda
Start Date2020-10-01
Completion Date2025-09-30
Total Area (sqm)500
Project Cost (Lacs)288
Duration (Months)60
Registration Fee5000

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile87********

Project Team

rolename
ArchitectARCHITECT PLANNER
ContractorUTTAR PRADESH AVAS AVEM VIKAS PARISHAD LUCKNOW
Structural EngineerSUMIT KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra3814 mi5250
Khasra3816 Mi1000

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
T1GF1 BHK1222.770
T111 BHK1222.77-
T121 BHK1222.77-
T131 BHK1222.77-

Development Works

work_namedescription
Demarcation of PlotsTo be done at time of execution of time
Boundary WallNot Proposed
Road WorkInternal c c road to be constructed by upavp as per attached layout external road to be constructed as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow
FootpathsProvided as per norms
Water Supply Including Drinking Water FacilitiesInternal water line laying and place water storege tank on the roof will be provided by upavp and external water line as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow
Sewer SystemInternal Sewer line will be laid by UPAVP with connection to septic tank and soakpit.External Sewer facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
DrainInternal Drain facility will be Provide by UPAVP and External Drain facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
ParksWill be Constructed by UPAVP, Kanpur. As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Tree PlantingWill be Constructed by UPAVP,Kanpur . As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Design For Electric Supply Including Street LightingInternal Electric Supply and Street Lighting will be Provide by UPAVP and External Electric Supply and Street Lighting will be provide by UPPCL, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Community BuildingsCommunity building like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Treatment and Disposal System of Sewage and Sullage waterWill be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Solid Waste Management And Disposal SystemWill be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Water Conservation SystemAs Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Energy Management System Including Use of Renewable EnergyWill be done by UP Power Corporation,as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Fire Protection And Fire Safety SystemAs per NBC guidelines not required for G+3 building.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSocial Infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Emergency Evacuation ServicesAs Per Norms
Other Miscellaneous WorkAs Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko

Bank Details

Bank NameHDFC
BranchBanda Branch
Branch AddressBANDA
Account HolderExecutive Engineer CD-Seventeen UPAVP Kalyanpur Kanpur
Account Number50100321838505
IFSC CodeHDFC0001950

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy