construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda
U.P. Awas Evam Vikas Parishad
Banda, Uttar Pradesh
Approved
1st Oct 2020
Completed
30th Sept 2025
Registration No.
UPRERAPRJ658600
Project Type
Residential
District
Banda
Taluka
Banda
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ658600 |
| Project Status | Completed |
| Project Category | Residential |
| District | Banda |
| Taluka | Banda |
| Start Date | 2020-10-01 |
| Completion Date | 2025-09-30 |
| Total Area (sqm) | 500 |
| Project Cost (Lacs) | 288 |
| Duration (Months) | 60 |
| Registration Fee | 5000 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | ARCHITECT PLANNER |
| Contractor | UTTAR PRADESH AVAS AVEM VIKAS PARISHAD LUCKNOW |
| Structural Engineer | SUMIT KUMAR |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 3814 mi | 5250 |
| Khasra | 3816 Mi | 1000 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| T1 | GF | 1 BHK | 12 | 22.77 | 0 |
| T1 | 1 | 1 BHK | 12 | 22.77 | - |
| T1 | 2 | 1 BHK | 12 | 22.77 | - |
| T1 | 3 | 1 BHK | 12 | 22.77 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | To be done at time of execution of time |
| Boundary Wall | Not Proposed |
| Road Work | Internal c c road to be constructed by upavp as per attached layout external road to be constructed as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow |
| Footpaths | Provided as per norms |
| Water Supply Including Drinking Water Facilities | Internal water line laying and place water storege tank on the roof will be provided by upavp and external water line as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow |
| Sewer System | Internal Sewer line will be laid by UPAVP with connection to septic tank and soakpit.External Sewer facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Drain | Internal Drain facility will be Provide by UPAVP and External Drain facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Parks | Will be Constructed by UPAVP, Kanpur. As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko |
| Tree Planting | Will be Constructed by UPAVP,Kanpur . As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko |
| Design For Electric Supply Including Street Lighting | Internal Electric Supply and Street Lighting will be Provide by UPAVP and External Electric Supply and Street Lighting will be provide by UPPCL, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Community Buildings | Community building like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Treatment and Disposal System of Sewage and Sullage water | Will be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Solid Waste Management And Disposal System | Will be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Water Conservation System | As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko |
| Energy Management System Including Use of Renewable Energy | Will be done by UP Power Corporation,as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Fire Protection And Fire Safety System | As per NBC guidelines not required for G+3 building. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Social Infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Emergency Evacuation Services | As Per Norms |
| Other Miscellaneous Work | As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko |
Bank Details
| Bank Name | HDFC |
| Branch | Banda Branch |
| Branch Address | BANDA |
| Account Holder | Executive Engineer CD-Seventeen UPAVP Kalyanpur Kanpur |
| Account Number | 50100321838505 |
| IFSC Code | HDFC0001950 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in