CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.
U.P. Awas Evam Vikas Parishad
Barabanki, Uttar Pradesh
Approved
1st Jan 2021
Completed
30th Jun 2025
Registration No.
UPRERAPRJ540217
Project Type
Residential
District
Barabanki
Taluka
Nawabganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ540217 |
| Project Status | Completed |
| Project Category | Residential |
| District | Barabanki |
| Taluka | Nawabganj |
| Start Date | 2021-01-01 |
| Completion Date | 2025-06-30 |
| Total Area (sqm) | 4980 |
| Project Cost (Lacs) | 790 |
| Duration (Months) | 54 |
| Registration Fee | 30000 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | ARVIND DEO |
| Contractor | NAME OF CONTRACTOR SHOULD BE FINAL AFTER TENDER PROCESS. |
| Structural Engineer | IRSHAD AHMAD |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 382/1,383,374 | 4980 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 60 | 43 | 32 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per Approved Layout Plan. The Plot shall be demarcated by means of Dagbelling. |
| Boundary Wall | Parishad shall not provide any Boundary wall. |
| Road Work | Yet to be started as per Layout plan.Internal Road & Footpath work will be done by UPAVP as per Parishad specification. Providing and Laying one coat of WBM (45-90) in depth of 0.09 M and second coat of WBM (45-63) in depth of 0.075 M. Third coat of WMM in depth of 0.075 m . After all three layers two layers of Bituminous concrete laid as per MORTH guidelines with total thickness of 6.50 cm. |
| Footpaths | Not Applicable. As per Specifications of UP Awas Evam Vikas Parishad and inline with approved map. (Chief Engineer Office order No 685/M-4/2017 dt 19.03.2017 and others ). Work shall be carried out as per Uttar Pradesh Public work departments shedule of rates (Specifications ) . |
| Water Supply Including Drinking Water Facilities | Yet to be started as per Layout plan.water supply work will be done by UPAVP as per Parishad specifications. Supply and laying of 90 mm dia PVC pipe (ISI mark) as per layout plan. Making water connection joints as per layout plan including all fittings. |
| Sewer System | Yet to be started as per Layout plan.Sewarage work will be done by UPAVP as per parishad specifications. S.W.R 110 dia pipe will be provided as per specifications.Manhole and regulating shaft proving in Brick masonary.and also providing RCC manhole cover as per layout plan. |
| Drain | Yet to be started as per Layout plan.Storm water work will be done by UPAVP as per Parishad specifications.Open channeled drain of Class 150 brick work in 1:6 including base of Plain cement concrete of 1:6:12.The size of drain will be 9"X9" . Depth of drain shall be vary as per site slope and other conditions. |
| Parks | Not Applicable |
| Tree Planting | By side of the Roads and in Parks As per Approved Layout. |
| Design For Electric Supply Including Street Lighting | Shall be done in house (by UPAVP) and shall be handed over to UPPCL for issuing individual connections . |
| Community Buildings | No any provision for Community Buildings.But many community buildings are also avilable in Parishad scheme. |
| Treatment and Disposal System of Sewage and Sullage water | No any provision for Treatment and disposal of sewage and sullage water by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Treatment and disposal of sewage and sullage water because Yojna is handed to Nagar Palika Parishad Barabanki. |
| Solid Waste Management And Disposal System | No any provision for Solid Waste management & Disposal by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Solid Waste management & Disposal because Yojna is handed to Nagar Palika Parishad Barabanki. |
| Water Conservation System | No any provision for Water conservation . |
| Energy Management System Including Use of Renewable Energy | No any provision for Energy management System Including Use of Renewable Energy. |
| Fire Protection And Fire Safety System | No any provision for Fire protection and fire safety requirements |
| Social Infrastructure And Other Public Amenities Including Public Health Services | No any provision for Social Infrastructure And Other Public Amenities Including Public Health Services.But in Parishad scheme many social infrastructures are available. |
| Emergency Evacuation Services | No any provision. |
| Other Miscellaneous Work | No any provision. |
Bank Details
| Bank Name | INDUSIND BANK |
| Branch | INDUSIND BANK BARABANKI |
| Branch Address | INDUSIND BANK OPP. DM RESIDANCE BARABANKI |
| Account Holder | UP AWAS EVAM VIKAS PARISHAD BARABANKI |
| Account Number | 150343344345 |
| IFSC Code | INDB0000435 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in