Construction of 48 Nos (G+3) type houses under PMAY (U) , at Barel Distt-Barabanki.
U.P. Awas Evam Vikas Parishad
Barabanki, Uttar Pradesh
Approved
1st Dec 2020
Completed
30th May 2026
Registration No.
UPRERAPRJ506045
Project Type
Residential
District
Barabanki
Taluka
Nawabganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ506045 |
| Project Status | Completed |
| Project Category | Residential |
| District | Barabanki |
| Taluka | Nawabganj |
| Start Date | 2020-12-01 |
| Completion Date | 2026-05-30 |
| Total Area (sqm) | 1427 |
| Project Cost (Lacs) | 315 |
| Duration (Months) | 66 |
| Registration Fee | 12500 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | Arvind Dev |
| Contractor | Should Be final after tender process. |
| Structural Engineer | Er Irshad Ahmad |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1862 (mi) | 8560 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| B1 | GF | 1 BHK | 12 | 22.77 | 0 |
| B1 | 1 | 1 BHK | 12 | 22.77 | - |
| B1 | 2 | 1 BHK | 12 | 22.77 | - |
| B1 | 3 | 1 BHK | 12 | 22.77 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per proposed layout plan of PMAY (U) layout plan of Barel Barabanki of Block B1. Total Ground Coverage of 01 Block is equal to 408.84 sqm. |
| Boundary Wall | Not applicable |
| Road Work | Yet to be started as per Layout Plan. Internal Road work will be done by U.P.A.V.P and External Road work will be done by U.P.P.W.D. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Road will be prepared with Bituminous concrete including Base of WMM/WBM and GSB. |
| Footpaths | Yet to be started as per Layout Plan. Internal Footpath work will be done by U.P.A.V.P and External Footpath work will be done by U.P.P.W.D. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Footpath will be prepared as per U.P.A.V.P specifications (By Interlocking Tiles or By S.O.B. Brick Soling) |
| Water Supply Including Drinking Water Facilities | Yet to be started as per Layout Plan. Internal Water Supply Including Drinking Water Facilities work will be done by U.P.A.V.P and External Water Supply Including Drinking Water Facilities work will be done by U.P.Jal Nigam as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. For water supply rising main pipe will be laid as U.P.A.V.P specifications. |
| Sewer System | Yet to be started as per Layout Plan. Internal Sewer System work will be done by U.P.A.V.P and External Sewer System work will be done by U.P.Jal Nigam as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. As per site requirement Soak pit and Septic tank will be provided for sewarage system. |
| Drain | Yet to be started as per Layout Plan. Internal Drain work will be done by U.P.A.V.P and External Drain work will be done by U.P. Local Bodies as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Drain will be prepared in Brick work with 1 ratio 6 in cement and coarse sand including pointing of surface in 1 ratio 3. |
| Parks | Yet to be started as per Layout Plan by U.P.A.V.P and also demarked by Boundary wall at site as provision in estimate. |
| Tree Planting | Yet to be started as per Layout Plan by U.P.A.V.P. Trees shall be planted at road side patries . Height of tree shall be upto 5 feet or above 5 feet. |
| Design For Electric Supply Including Street Lighting | Yet to be started as per Layout Plan. Internal Drain work will be done by U.P.A.V.P and External Drain work will be done by U.P. P.C.L. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | After completion of project will be handed over to Local Authority. Sewerage and Sullage Waste point is situated in proposed scheme. |
| Solid Waste Management And Disposal System | After completion of project will be handed over to Local Authority. Sewerage and Sullage Waste point is situated in proposed scheme. |
| Water Conservation System | Not Applicable |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per Layout Plan |
Bank Details
| Bank Name | Indusind Bank |
| Branch | Ashok Marg Lucknow |
| Branch Address | Ground Floor, H.T.House 25, Ashok Marg, Lucknow-226001 |
| Account Holder | Executive Engineer Construction Division-Two U.P.A.V.P |
| Account Number | 150782783784 |
| IFSC Code | INDB0000019 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in