New Launch - India Real Estate Report 2026.

IMPERIAL ASHIYANA PHASE-1

IMPERIAL GREEN INFRATECH PRIVATE LIMITED

Barabanki, Uttar Pradesh

RERA approved

Approved

15th Jul 2020

Project completed

Completed

13th Jan 2024

Registration No.

UPRERAPRJ100458

Project Type

Residential

District

Barabanki

Taluka

Nawabganj

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ100458
Project StatusCompleted
Project CategoryResidential
DistrictBarabanki
TalukaNawabganj
Start Date2020-07-15
Completion Date2024-01-13
Total Area (sqm)5493
Project Cost (Lacs)245
Duration (Months)42
Registration Fee32500

Promoter Details

Promoter NameIMPERIAL GREEN INFRATECH PRIVATE LIMITED
Promoter IDUPRERAPRM119014
Mobile99********

Project Team

rolename
ArchitectREPUNJAY PATEL
ContractorMUNEEB ALVI
Structural EngineerIRSHAD AHMAD

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra5491260
Khasra5501260
Khasra5511260
Khasra552997
Khasra553683
Khasra5541902
Khasra5552000
Khasra5485340

Development Works

work_namedescription
Demarcation of PlotsPlots will be demarcated as per the sanctioned layout
Boundary WallNot required
Road WorkAs per the norms, the road will be developed. The 12-meter road will be the main road and the internal road will be 10-meter and 9-meter. Semi dense Bituminous concrete (SDBC) road shall be constructed with the base of GSB and WMM
FootpathsNo
Water Supply Including Drinking Water FacilitiesNetworking, laying of pipe, connection with the borewell as per the sanctioned layout
Sewer SystemNetworking, laying of pipe connection with STP as per the sanctioned layout. Details are enclosed with the attachment
DrainDrain water harvesting system will be installed and the details are enclosed with the attachment
Parks2 Parks will be developed in the whole project. In the 1st phase, one park will be developed and another park will be developed in the 2nd phase.
Tree PlantingLayout, earthwork, leveling, plantation as per the sanctioned layout
Design For Electric Supply Including Street LightingUnderground electric wiring and street pole LED lights will be developed as per the approved electric layout
Community BuildingsCommunity building will be build consisting of 2 small rooms for leisure activities and one community hall with 4 toilets in the whole building.
Treatment and Disposal System of Sewage and Sullage waterThe Sewer Treatment plant will be installed and the details are enclosed with the attachment
Solid Waste Management And Disposal SystemCollection space in the STP area.
Water Conservation SystemRainwater harvesting, irrigation of plant by flush water system as per the sanctioned layout
Energy Management System Including Use of Renewable Energynot required (since its a plotting project)
Fire Protection And Fire Safety Systemnot required (since its a plotting project)
Social Infrastructure And Other Public Amenities Including Public Health ServicesWe will develop a community hall which will consist of rooms for leisure and sports activities. There will be area for convenience shopping.
Emergency Evacuation ServicesNot required.
Other Miscellaneous WorkMain Gate with security guard room

Bank Details

Bank NameHDFC BANK
BranchBARABANKI
Branch AddressPAISAR PLAZA, NAKA PAISAR BARABANKI-225001
Account HolderIMPERIALGREEN INFRATECH PRIVATE LIMITED RERA ACCOUNT
Account Number50200050752188
IFSC CodeHDFC0000658

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy