IMPERIAL ASHIYANA PHASE-1
IMPERIAL GREEN INFRATECH PRIVATE LIMITED
Barabanki, Uttar Pradesh
Approved
15th Jul 2020
Completed
13th Jan 2024
Registration No.
UPRERAPRJ100458
Project Type
Residential
District
Barabanki
Taluka
Nawabganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ100458 |
| Project Status | Completed |
| Project Category | Residential |
| District | Barabanki |
| Taluka | Nawabganj |
| Start Date | 2020-07-15 |
| Completion Date | 2024-01-13 |
| Total Area (sqm) | 5493 |
| Project Cost (Lacs) | 245 |
| Duration (Months) | 42 |
| Registration Fee | 32500 |
Promoter Details
| Promoter Name | IMPERIAL GREEN INFRATECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM119014 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | REPUNJAY PATEL |
| Contractor | MUNEEB ALVI |
| Structural Engineer | IRSHAD AHMAD |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 549 | 1260 |
| Khasra | 550 | 1260 |
| Khasra | 551 | 1260 |
| Khasra | 552 | 997 |
| Khasra | 553 | 683 |
| Khasra | 554 | 1902 |
| Khasra | 555 | 2000 |
| Khasra | 548 | 5340 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plots will be demarcated as per the sanctioned layout |
| Boundary Wall | Not required |
| Road Work | As per the norms, the road will be developed. The 12-meter road will be the main road and the internal road will be 10-meter and 9-meter. Semi dense Bituminous concrete (SDBC) road shall be constructed with the base of GSB and WMM |
| Footpaths | No |
| Water Supply Including Drinking Water Facilities | Networking, laying of pipe, connection with the borewell as per the sanctioned layout |
| Sewer System | Networking, laying of pipe connection with STP as per the sanctioned layout. Details are enclosed with the attachment |
| Drain | Drain water harvesting system will be installed and the details are enclosed with the attachment |
| Parks | 2 Parks will be developed in the whole project. In the 1st phase, one park will be developed and another park will be developed in the 2nd phase. |
| Tree Planting | Layout, earthwork, leveling, plantation as per the sanctioned layout |
| Design For Electric Supply Including Street Lighting | Underground electric wiring and street pole LED lights will be developed as per the approved electric layout |
| Community Buildings | Community building will be build consisting of 2 small rooms for leisure activities and one community hall with 4 toilets in the whole building. |
| Treatment and Disposal System of Sewage and Sullage water | The Sewer Treatment plant will be installed and the details are enclosed with the attachment |
| Solid Waste Management And Disposal System | Collection space in the STP area. |
| Water Conservation System | Rainwater harvesting, irrigation of plant by flush water system as per the sanctioned layout |
| Energy Management System Including Use of Renewable Energy | not required (since its a plotting project) |
| Fire Protection And Fire Safety System | not required (since its a plotting project) |
| Social Infrastructure And Other Public Amenities Including Public Health Services | We will develop a community hall which will consist of rooms for leisure and sports activities. There will be area for convenience shopping. |
| Emergency Evacuation Services | Not required. |
| Other Miscellaneous Work | Main Gate with security guard room |
Bank Details
| Bank Name | HDFC BANK |
| Branch | BARABANKI |
| Branch Address | PAISAR PLAZA, NAKA PAISAR BARABANKI-225001 |
| Account Holder | IMPERIALGREEN INFRATECH PRIVATE LIMITED RERA ACCOUNT |
| Account Number | 50200050752188 |
| IFSC Code | HDFC0000658 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in