SAI KOHINOOR GRAND
ONELLA REALTY PRIVATE LIMITED
Barabanki, Uttar Pradesh
Approved
1st Apr 2024
Pending
10th Jul 2028
Registration No.
UPRERAPRJ115705/05/2024
Project Type
Residential
District
Barabanki
Taluka
Nawabganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ115705/05/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Barabanki |
| Taluka | Nawabganj |
| Start Date | 2024-04-01 |
| Completion Date | 2028-07-10 |
| Total Area (sqm) | 1656 |
| Project Cost (Lacs) | 1711 |
| Duration (Months) | 52 |
| Registration Fee | 13500 |
Promoter Details
| Promoter Name | ONELLA REALTY PRIVATE LIMITED |
| Promoter ID | UPRERAPRM4860 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | ABHISHEK PANDEY |
| Contractor | ONELLA REALITY PVT LTD |
| Structural Engineer | SUDHIR PANDEY |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1081, 1082, 1086, 1088 | 1656 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| BLOCK A | BSMNT | OTHER | 0 | 1575.75 | - |
| BLOCK A | GF | OTHER | 0 | 1575.75 | 0 |
| BLOCK A | 1 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 1 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 1 | 3 BHK | 4 | 80.826 | - |
| BLOCK A | 2 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 2 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 2 | 3 BHK | 4 | 80.826 | - |
| BLOCK A | 3 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 3 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 3 | 3 BHK | 4 | 80.826 | - |
| BLOCK A | 4 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 4 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 4 | 3 BHK | 4 | 80.826 | - |
| BLOCK A | 5 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 5 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 5 | 3 BHK | 4 | 80.826 | - |
| BLOCK A | 6 | 2 BHK | 8 | 55.891 | - |
| BLOCK A | 6 | 3 BHK | 4 | 66.383 | - |
| BLOCK A | 6 | 3 BHK | 4 | 80.826 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | BLOCK A, ON KHASRA NO- 1081, 1082, 1086, 1088, AT VILLAGE RENDUWA PELHARI, PARAGNA-DEWA, TEHSIL-NAWABGANJ, DISTRICT-BARABANKI-226019 |
| Boundary Wall | 230MM WIDE AND 2.1 METER BOUNDARY WALL OF RCC/BRICK FILLED, BOUNDARY WALL AT SITE PLASTER WILL BE DONE ON BOTH SIDE AND AFTER THAT TWO COAT PF PAINTS WILL BE COATED. |
| Road Work | CC ROADS AS PER APPROVED PLAN AND CONCRETE/APEX ROAD WILL BE MADE AT THE SITE . THE BASE OF ROAD WILL BE FILLED BY RED MURAM .AFTER THAT TWO LAYER OF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UTO THE MARK. AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACKE WHITE APEX, ROAD WILL BE 7.5MTR TO 12 MTR WIDE. |
| Footpaths | PAVER BLOCKS LAIED OVER SAND BASE AND FOOTHPATH WILL BE INTERLOCKING TYPE B CONCRETE BLOCKS PAVERS. |
| Water Supply Including Drinking Water Facilities | ALL THE DRINKING WATER TO BETHROUGH TERRACE TANK OF REQUIRED CAPACITY, FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER . WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES . WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. |
| Sewer System | A WELL LAID SEWER SYSTEM CONNECTED TO EXTERNAL SEWERSYSTEM IS PROPOSED |
| Drain | DRAINS HAVING A MINIMUM WIDTH OF 150MMMWILL BE PROVIDED FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUN OFF) |
| Parks | INTERNAL PARK WILL BE PROVIDED . THE PARKS WILL HAVE PLAY EQUIPMENTS AND SITTING BENCHES ETC. |
| Tree Planting | THE TREES WILL BE PROVIDED AT ALL SUITABLES LOCATIONSOF THE PROJECT AND ALONG THE BOUNDARY WALLS |
| Design For Electric Supply Including Street Lighting | ELECTRIC SUPPLY PROVIDED THROUGH INDIVIDUALLY TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUP . |
| Community Buildings | NOT APPLICABLE |
| Treatment and Disposal System of Sewage and Sullage water | SEWAGE SHALL BE TRATED IN SEWAGE TREATMENT PLANT (STP) AND THERAFTER TREATED WATER TO BE USED FOR IRRIGATION. |
| Solid Waste Management And Disposal System | SHALL BE COLLECTED AT ONE SPECIFIC POINT, FINAL DISPOSAL WILL BE TIED UP WITH AREA NAGAR NIGAM TEAM. |
| Water Conservation System | RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUND WATER RECHARGINGAND OVER FLOW TO BE DISCHARGED IN THE MUNICIPAL DRAINS. |
| Energy Management System Including Use of Renewable Energy | 25 PERCENTAGE OF THE STREET LIGHT SHALL HAVE SOLARENERGY BACKUP. |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | FIRE STAIRCASE SHALL BE PROVIDED AS PER THE APPROVED FIR DRAWING FOR EVACUATION TO OPEN AREAS. |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | AXIS BANK LTD. |
| Branch | MOHAMMADPUR CHOWKI, BARABANKI |
| Branch Address | KH NO 3 & 25, KHASRA NO 292 & 281, GF , SAFEDABAD, NAWABGANJ MOHAMMADPUR CHOWKI, BARABANKI. UTTAR PRADESH-225003 |
| Account Holder | ONELLA REALTY PVT LTD COLLECTION A/C FOR SAI KOHINOOR GRAND |
| Account Number | 924020021807818 |
| IFSC Code | UTIB0002553 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in